Mahindra Yuvraj Training Report-99
Mahindra Yuvraj Training Report-99
Mahindra Yuvraj Training Report-99
Conducted at
Submitted by:-
Roll no. Reg. No. Name
80 J2-00515-2012 DHOLARIYA DHRUV M.
99 J2-00560-2012 SAVALIYA JAYDEEP M.
ACKNOWLEDGMENT
The subjects we learn can be seen implementing in an industry and training at such
earlier stage gives a wider perspective to change the thought process and the way we analyse
things.
I would like to thank Mr. Jigar Maru who gave me this wonderful opportunity, to get
industrial exposure at the crucial stages and extend his help even in the further in-plant
training.
I would also like to extend my gratitude to Mr. Harshil Vadaliya who helped me in
learning the various activities under the hood and provide a constant help in revisiting my
fundamentals.
I would like to thank Mr. Birju Bhadania who constantly assisted me during this
training period and define a proper work hierarchy.
I would even like to thank all the employees here who helped me understand the
procedure involved and patiently take their time in explanations and facilitate me for
successful completion of training.
ABSTRACT
In the current competitive market, every industry wants to give the right product to
the customer with right quality at right time. To perform this function industry need to be
well balanced, smooth production flow and achieve it by managing all the resources available
and allocate them as per their requirement and their capability. Industrial training gives an
idea of how the system works, production of required material, problems raised during
production and rectification methods. The study showed the various industrial engineering
techniques applied, standard operation procedures implemented in the assembly line.
INDEX
PREFACE
Acknowledgement……………………………………………………………………………..
Abstract………………………………………………………………………………………..
1. Company profile……………………………………….…………………………………..
2. History……………………………………………………………………………………..
3. Introduction…………………….………………………………………………………….
5.3Flywheel fitment…………………………………………….……………………
5.8PTO mounting…………..………………………………………………………
5.9Alternator mounting………………………………………..……………………
6. Engine testing………………………………………………………………………….…
7. Transmission
7.5Backlash………………………………………………………………………
9. VTU assembly
9.1VTU body………………………………….…………………………………
9.2Control valve…………………………………………………………………
12.1Degreasing tank……………………………………………………………….
12.2Water rinse-I…..………………………………………………………………
12.3Waterrinse-II….….……………………………………………………………
12.4Surface actuation………………………………………………………………
12.5Phosphating tank……………….………………………………………………
12.6Water rinse-III…………………………………………………………………
12.7Water rinse-IV……..………………………………………………………..…
12.9Primer coating…………………………………………………………………
13.1Demasking, greasing…………………………………………………………
13.6Other mountings……………………………………………………………. .
15.1Roller testing….……..………………………………………………………
15.2Toe in setting…………………………………………………………………
15.3PTO testing………………………………………………………………...
19. Conclusion……………………………………………………………………
1. COMPANY PROFILE
We have project in Panchanath Auto Pvt. Ltd. This is collaborated with Mahindra and
Mahindra Ltd. They assemble tractors under the name Mahindra Yuvraj 215. 2 stands
for mini tractor segment and 15 stands for 15 HP.
Mahindra is the only Indian company among the top tractor brands in the world. It is
today a full range player with a presence in almost every segment of the automobile
industry, from two wheelers to CV’s, UV’s and SUV’s and sedans. Mahindra recently
acquired a majority stake in REVA Electric Car Co Ltd.(now called as Mahindra
REVA), strengthening its position in the electric vehicles domain.
The PAL brand is backed by Field Marshal, leaders in the manufacturing of diesel
engines in the country. Field marshal is an ISO 9001:2000 company reputed for
manufacturing the latest technology, light weighing, and fuel efficient and compact
diesel engines.
Within four decades of its inception, the company has spread its wings by introducing
a large range of products spanning from diesel engines to mini tractors, from
fertilizers to engine oils. PAL being the latest venture of Field Marshal. The
leadership team is comprised of the corporate executive committee and other business
group heads. Their expertise and knowledge in each of their respective field have
helped elevate them to a position of leadership with many responsibilities.
The plant in which the training was conducted is of Mahindra small tractors.
Marketing facilities
The US $6 billion Mahindra group is among the top 10 industrial houses in India.
Mahindra & Mahindra is the only Indian company among the top 3 tractor
manufacturers in the world.
Mahindra‘s farm equipment sector has recently achieved the Japan quality medal, the
only tractor company worldwide to be bestowed this honor. It also holds the
distinction of being the only tractor company worldwide to win the Deming prize.
Mahindra is the market leader in multi utility vehicles in India. It made a milestone
entry into the passenger car segment with Logan.
The group has a leading presence in key sectors of the Indian economy, including the
financial services, trade and logistics, automotive components, information
technology and infrastructure development.
With over 62 years of manufacturing experience, the Mahindra group has built a
strong base technology, engineering, marketing and distribution which are key to its
evolution as a customer centric organization, the group employs over 50,000 people
and has several state-of-art facilities in India and overseas.
The Mahindra group has ambitious goal aspirations and has a presence in 5
continents. Mahindra products are today available in every continent except
Antarctica. Mahindra & Mahindra has one tractor manufacturing plant at China, three
assembly plants in the United States and one at Brisbane, Australia.
It has made strategic acquisitions across the globe including Stokes Forgings (UK).
Jeco Holding AG (Germany) and Schoneweiss & Co GmbH (Germany). Its global
subsidiaries include Mahindra Europe Srl. based in Italy, Mahindra USA Inc. and
Mahindra South Africa.
Mahindra group has ranked in its top 200 list of the world’s most reputable
Companies and in the top 10 list of the most reputable Indian companies. Mahindra
has recently been honoured with the Bombay Chamber Good Corporate Citizen
Award for 2006-2007.
3. INTRODUCTION
As we know that Mahindra Yuvraj 215 is manufactured here in the plant, let’s have a
glance at the tractor. The Yuvraj 215’s low cost of ownership and best-in-class fuel efficiency
is bringing mechanization opportunities to farmers with small landholdings across India and
revolutionizing earnings capabilities. Mahindra designed the Yuvraj 215 for small farm
operations. With one cylinder and 15 HP, the Yuvraj 215 is compact and easy to operate. It
is built for long life and low maintenance, durability and dependability. It offers the first
water-cooled single cylinder engine in the 15 HP segment, and its side shift gear is easy and
convenient to use. The Yuvraj 215 achieves a top speed of 25 kmph, the highest in its class.
It can haul up to 1.5 tons. It’s ideal for farmers ready to upgrade from bullocks or power
tillers, or for farmers who need an additional machine for specific applications like inter-
culture, power generation, or water pumping. Farmers who cultivate vegetables, tend
orchards, or raise cash crops can all benefit from the Yuvraj 215’s strong value proposition of
affordability, power, and performance. A tractor is made up of various components. There are
innumerable parts in a tractor and each part is essential for the proper functioning of a tractor.
All the parts are categorized into four major sections. They are
Engine
Transmission
Hydraulics
Chassis & sheet metal
Electrical
Each section has sub groups comprising of various sub-assemblies. So initially the sub
assembly is done and then the sub-assemblies are sent to the main assembly line for assembly
onto their respective body. Before any sub assembly, cleaning of all individual parts is
necessary. It is done in the cleaning machine.
4. CLEANING MACHINE-I
The raw materials which are imported are to be cleaned first as they contain grease,
oil and other foreign particles.
Transcase, PTO axle, RAC returner, PTO returner, Lay shaft returner, Bull case are
cleaned in this cleaning machine.
the parameters involved in this cleaning machine are
Water bath level -2000liters
Water temperature -50-70ᶱC
Solvent pressure -5-6kg/cm
Bath intensity -3-5%
Bath chemical -Syn clean 21
Machine time is 4 minutes.
Compound is loaded on cleaning tray using lifting tackle.
CLEANING MACHINE-II
Shut off tool- In this tool torque is continuously provided. After attainment of
requisite
torque, air by passes the pneumatic gun.
o Impact tool- In this tool torque is provided due to hammering effect.
After cleaning is done all the parts are arranged nearby to their sub assembly line. As
the
Complete tractor assembly starts with the engine assembly, we will discuss it first.
Initially crank case is loaded onto line and Lubricating Oil Pump (LOP) gear sub
assembly is mounted onto the crankcase.
Bearing mounting ring is mounted on the crankcase upon which the flywheel is
mounted later.
During this stage sub assembly of counter balance, cam follower, flywheel and crank
shaft is done
Then bracket mounting on the crank case is done and is moved in for next process on
the assembly line of engine.
Rings on mounting rods are placed to raise the elevation of cylinder head and maintain
same level with cylinder head and piston crown.
Cylinder block is inserted.
GOETZE piston & piston liners are used. It is the manufacturing company for pistons and
piston liners.
IN PISTON
IN CONNECTING ROD
-Brass bearing is inserted on both the surfaces of bigger end of the rod.
Each ring is separated by 120 degrees clockwise starting from the upward arrow on the
piston.
Cylinder block is placed over the mounting rods and piston is fixed inside the cylinder
block.
The big end of the connecting rod is tightened up from the bottom direction.
Strainer is attached from the bottom to filter the oil from foreign particles.
Flange sealant is applied over oil sump and bolted beneath the engine.
o Cam shaft, driving gear and LOP gear are located in their respective positions.
o The three gears are made to mesh with each other and after inspection dummy front
cover is mounted.
o Inspection: Fuel timing & fuel cut off checking
o Fuel injection pump (FIP) is inserted near the cam shaft bearing.
o Fuel is allowed to pass through the FIP and fuel cut-off is adjusted at 14ᶱ bTDC using
time setting guage. For this adjustment, at the FIP SHIM’s are used. One SHIM for
1ᶱdeviation.
Expansion plug is inserted at the bottom of the cylinder head. It serves as a blowoff
valve when there is some malfunction in the exhaust gas outflow.
Exhaust and inlet valve spools are inserted, the diameter of inlet valve is greater than
that of exhaust valve.
Rocker arms are fixed in the cylinder head and springs are also placed on the inlet and
exhaust valve rods.
In order to remove the extra air outside, Air breather is added on top of the cylinder
head.
Diesel spill pipe is also attached to allow excess oil to overflow.
Push rod tube, Rocker arm cover, High pressure pipe are also added in the same stage.
A smaller size dowel pins are added onto the mounting rods.
Gasket for cylinder head is put on in between the case to the cylinder head. It is
helpful in preventing the leakage of air during compression stroke.
High pressure pipe is inserted between fuel injector and fuel injector pump.
Push rods connect cams to the rocker assembly for opening and closing of the valves.
Rocker arm is tightened with push rods below them and rocker arm cover is placed in
position.
5.7 Intake & exhaust mounting, fuel filter mounting
2.5 lit of engine oil is filled though the oil cap at the top.
Air cleaner is mounted above inlet manifold.
As per the following table, the engine testing is done.
So as the engine testing is done, the engines are kept aside in a row. After the engine cools
down, they are taken out of the engine testing area and clutch plate is mounted.
7. TRANSMISSION
Rail and fork are assembled on the transcase which helps in shifting the gears.
Lay shaft is mounted in the next stage. Gears on the lay shaft are removed, lay shaft is
inserted from the front and the removed gears are added again from top of the transcase.
Loctite is applied on the body to avoid oil leakage.
Spline shaft is covered with a returner (spline shaft cover).
Ball bearing is added on the other side of the layshaft and locked with a Circlip.
Oil seal is added onto the ball bearing.
From the sides ring gear (differential), bull case (bull pinion shaft) are mounted.
Gear rods are inserted into position by connecting them with forks through an overhead
shaft.
The order of gear arrangement are first, second, third, high, low, reverse.
7.5 BACKLASH
When both the bull pinion shafts are rotated in the opposite direction, there exists some
play in between both the shafts. This is backlash. This error is rectified by adjusting
(tightening/loosening) the stud gear and the play is minimized.
The SHIM film inserted depending on the adjustment required. The general
implementations are 900µm on right hand side of bull case and 1200 µm on left hand
side of bull case.
The backlash deflections accepted are different for different directions Right hand gear
– 0.2 µm to 1.3 µm Left hand gear – 0.2 µm to 1.3 µm Pinion gear – 0.2 µm
To shift the gears, gear rod assembly is mounted and the shafts are locked in position.
Oil seal is added to the bull case at the outer side of the transcase near the bull case end.
Stud gear is removed from the bull case, oil seal is inserted over the stud gear and
retightened into the bull case.
Dye shaft is connected to the lay shaft.
Silicone gel is applied on the face of Clutch housing, bolted to transcase and is worn
over the dye shaft.
Gear box is covered with a plate and tightened with bolts
PTO shaft is directly coupled with the lay shaft. It has a direct attachment from the
gearbox, without transferring the power to the spline shaft, power is directly transmitted
through lay shaft.
2 dowel pins are used to insert the PTO mounting properly
It is bolted and then properly tightened.
A seal is positioned into the outer side of the PTO shaft
PTO housing in which PTO gear and PTO shaft are mounted.
PTO gear is mounted on PTO housing using a pressure bearing on the other side,
thebearing is mounted and locked with a Circlip.
In the above hole, drive shaft is mounted. Returner is mounted, locked with nuts on the
side opposite to PTO gear.
8. Transmission leakage testing
If leakage is observed above the prescribed value, red light is signaled on the testing machine.
o The whole gear box is filled with oil.(15-16 liters of servo 13T oil)
o Motor is connected to the dye shaft and the motor is operated.
o Possible chances of leakage are noted, even during the application of brakes.
o Bolt on top of the transcase determines the amount of oil inside.
9. VTU assembly
o Rocker arm is mounted on rock shaft, rock shaft is mounted on VTU body.
o Cam PC is added. It is used to bring back the spool valve into position.
o Rock shaft bush is added. Washer is added on one side and oil seal on both sides are
added in order to prevent oil leakage. They are fixed properly by using a dolly and
hammer.
o Lift arm is inserted on both the sides and locked with a Circlip.
o Quadrant is inserted in position and tightened with 40N-m torque.
o Crank toppling is locked with draft sensing element.
o PC roller, PC link, DC link are mounted on the quadrant shaft. These three are
interconnected.
o DC bush is locked with DC outer.
o DC cable is attached to DC lever & Circlip is placed over it.
o DC outer link is cabled with crank toppling.
o The level of lift arm is set to zero degrees with reference to the horizontal axis.
o The maximum value of pressure is noted when the non returning valve opens. It is also
called as the relief valve pressure. It is generally about 1786 Psi to 2276 Psi.
o PC- position control is set. It is generally used to fix a position of the lift arm. The max
value of PC is 71 to 73 degrees.
o DC- draft control is set. It is generally used to avoid blows or sudden jerks. DC is set
just 2 to 3 degrees in excess to the PC.
o During testing maximum capable load and maximum allowable angular lift is set.
o Dye shaft of the transmission side, crankshaft from the engine are matched and
crankshaft is inserted into the dye shaft. Cross shaft is inserted on the clutch plate
housing and all of them are bolted tightly initially using 2 bolts.
o The remaining bolts are added and tightened.
o 2 way threaded nut is inserted into the transcase on which battery stand is initially
placed. Then with help of nuts Battery stand and gear box shifter are mounted.
o High pressure pipe line is connected from the control valve of VTU to the hydraulic
pump to send in pressurized oil into the VTU for functioning of the lift arm.
o Gear box control rod is connected to the cross shaft.
o LH foot pedal is mounted above the brake shaft behind the clutch pedal.
o On the right hand side, both RH and LH brakes are mounted on the brake shaft.
o For the functioning of LH brake, a key is inserted onto the brake shaft and LH brake
pedal is mounted. When the LH brake is pressed, as it is locked with the key, the shaft
rotates and activates the LH brake shoes.
o RH foot rest is mounted.
o RH brake pedal is directly mounted onto the brake shaft and is connected to the RH
brake.
o Both the brakes are attached with a return spring which facilitates the returning of the
brake pedal to its original position.
o Heights of the brakes are locked and adjusted.
o A governor linkage is added from the lever of the engine near FIP to the cross
shaft.
o Handle accelerator mounted on the gear box shifter is also tightened.
o Using Banjo bolts, fuel pipe from diesel tank to the fuel filter is fitted. Fuel flows into
the fuel filter through the Banjo bolts from the fuel tank.
10.8 Draw bar, check chain bracket & lever link fitment
o Four linkages are mounted; two from sides attached to the lift arms and two from the
bottom attached to the drop arm individually are mounted. Two linkages from top are
fixed to the bottom linkages using nuts and chain are also attached to the bottom
linkages.
In paint shop washing of whole assembly, application of paint and baking (heating) are the
operations involved.
o For the first 5 minutes the assembly is washed using a chemical compound.
o Later, to remove the chemical, the assembly is washed with soft water for 3-5 minutes.
The temperature of water is around 55-60ᶱC
o In the next stage to remove the water present on the assembly, pressurized air is blown
over, which removes all the water present. The pressure of air is around 4-5 bar.
Right after washing, masking is done to protect all the grease nipples from entry of paint.
Then it is sent into the paint shop.
11.2 Painting and baking
In the paint shop, paint is sprayed all over the body. The specifications in the paint shop are
After the painting of body is done, it is sent to the baking oven where the paint is properly
attached to the surface of the body.
The temperature inside the baking oven is 155±5ᶱC and the maximum limit is 180±5ᶱC.
The total cycle time here is 30 min. it is divided into 3 parts where each cycle comprises of
10 min.
There is another paint shop outside of the assembly line building. It is used to paint all
the individual parts i.e. fenders, dome, and other plates. The operations followed are
12.1 Degreasing tank
o Raw metal which has come in shipment is dipping into the degreasing tank.
o As the raw material contains grease and other foreign particles, in the degreasing tank it
is washed with chemical water to remove all the contaminants.
o This is carried out for 4 minutes.
o After degreasing of the raw material is done, to remove the chemicals, the metal is
dipped in soft water for 1 minute.
o For circulation of water air is continuously bubbled from the bottom.
o To remove the trace of chemicals and other contaminants, raw material is again dipped
in another soft water bath for 1 minute.
12.4 Surface actuation
o To increase the phospatizing ability of raw material, the metal is surface activated.
o For this the metal is dipped in water containing Nifan Zn Zs chemical.
o The cycle time is 1 minute.
o A coating of phosphate is added onto the raw material which helps in better adhering of
the paint.
o The cycle time is 4 minutes.
12.6 Water rinse-III
To remove the sludge, excess phosphate adhered, the coated metal is dipped in soft
water for a minute.
o Similar operation is carried out here. Remaining contaminants are also removed.
o After all the cleaning is done, in order to remove the water from the coated metal, it is
heated in oven.
o The temperature of oven is around 120ᶱC.
o The cycle time is 10 minutes.
12.9 Primer coating
After these series of processes, the coated metal is sent for primary coating.
o The coated metal is hanged to the conveyer rails which run all over the paint shop.
o Initially a primer coating of white grey colour is coated in the paint booth.
o The primer coated metal is then transported to the oven for heating and proper adhesion
of primer.
o The temperature of oven is around 150-155ᶱC.
o The primer coated metal comes out of the oven after 40 minutes.
12.10 Red colour coating
o The same line is made to move again into the paint booth where red coating is applied
this time.
o Inside the paint booth to avoid dispersal of paint all over the booth, a blower is present
behind the booth which sucks air. Water runs on the wall behind. It adsorbs the paint
mist present in the booth and settles down with the flowing water.
o The waste paint is collected and removed from the paint booth.
o After application of paint is done through air brush, the parts are transported to the
oven.
o The total cycle time for the paint booth is 4 hours in which 35 items are painted. This
time includes oven baking also. Here this paint shop runs on 5-S technique.
o A lead acid battery of 12V, 65 amp is mounted on the battery stand by using the stud
as a support.
o Fuel cut off valve, fuse box are mounted in this stage.
13.4 Installation of wheels & exhaust silencer
o 4 liters diesel is added for testing of tractor and for small distance travel inside the
plant.
o Steering, radiator and radiator fan are mounted.
o Radiator inlet and outlet are fixed with water supply hoses.
o 500 ml of coolant and 2-2.5 ltr of water are added in the radiator.
o Hood is mounted on the engine.
o Stickering on the hood is done and beading around the hood is placed.
o As diesel is filled lately, air might be trapped inside piping system. In order to remove
the air, the Banjo bolt at the FIP is loosened up and air is pumped into the diesel tank
by which air entrapped comes out. Banjo bolt is again retightened.
o Tractor is rolled out
14. IQS AREA
o Some under parts are not painted or paint might not be reached till the bottom. Those
areas are manually painted using spray can.
o Inspection of lights, paint is done and then sent to the testing arena.
15. Testing area
All the below operations are done then the product is available ready for dispatch (RFD).
o Easy engagement of gears, noise from transmission, noise from engine, brake
performance and hydraulic PC,DC check is also verified in this stage.
o In case of hydraulic check, 500Kg is the weight which has to be lifted during
inspection.
All the above are identified. If everything is OK then tractor is sent to PDI.
Fix a probe of toe in gauge to one of the wheel and adjust the tie rod such that the
centre of other front wheel also falls on the centre of the second probe.
Follow the same procedure on the back side of the front tyre.
After both the front and rear sides are fixed, tighten the nut on the tie rod without
disturbing the adjusted nut.
Tighten the screw on the tie rod which connects the steering wheel also.
15.3 PTO testing
Before starting of PTO ensure that water connection is started to the dynamometer.
Match the tractor’s PTO shaft to the dynamo meter’s coupling.
Ensure that the coupling & PTO shaft are properly locked.
Check the tractor serial number and that number should match with the number on
RH fender.
Check working of horn, head lamp, parking lamp, plough lamp, cluster light and
notify if malfunction is observed.
Measure the oil levels in the gear box, air cleaner, and transmission by using a
dipstick.
Check the coolant level in the radiator and the water level.
Check for any leakages at fuel systems, hydraulic systems, transmission joints, oil
drain plugs, engine joints, cooling system.
Check for the governor lever and air pressure in both the tyres.
Seal the transmission box from both sides. One from top where oil is poured and
another from where oil is drained.
Send the tractor for quality assurance. After that tractor is ready for dispatch(RFD)
If any problem is observed in the tractor during PDI or roller test or road test, the
tractor is brought back to the rework area.
Here the problem is identified and repair at the requisite position is done by
technicians and again sent for PDI.
Conclusion
The techniques used in the plant as based on the standard operating procedures
of the individual assembly or sub assembly. Constant supervision by the line
supervisors helps in maintaining the overall performance quality excellent for
efficient performance of the company.