0% found this document useful (0 votes)
256 views5 pages

Boring Log: Description

Uploaded by

Bryan Lingga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views5 pages

Boring Log: Description

Uploaded by

Bryan Lingga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

BORING LOG HOLE NO.

Abt 1

PROJECT Soil Investigation Pembangunan Jalan Tol Medan - Binjai DRILLING METHOD : Weshing BOR MACHINE : YBM - 05 BOR MASTER

LOCATION : Over Pass Sei Semayang Abutment 1 INCLINATION : Vertical STARTED 24/6/2015 LOGGED BY
SITE : DEPTH (M) : 30.00 M FINISHED 26/6/2015 CHECKED BY
COORDINATE ELEVATION :- GWL : APPROVED BY :
GEOLOGICAL UNIT

Undisturbed
SHAPE OF CORE

Disturbed
Sample

Sample
GWL & DATE
ELEVATION

HARDNESS
CORE RQD
SYMBOL
SPT

COLOR
DEPTH
SCALE

SCALE
DATE

RECOVERY (%)
DESCRIPTION N-Value

% CM 25 50 70 100 10 20 30 40 50 60 US DS

70 105

1 1

80 120

2 2

SPT
1 85 45

Abu-abu
Lempung Kepasiran
3 3.00 3.00 14 3

90 155

4 4
SPT
2 80 45
DS

1 90 50

DS
5 5

90 105

6 6.00 10 6
12/8/2015

SPT

3 80 45

Lempung
7 7

85 155

8 8
SPT

4 80 45

24
9 9.00 9
80 105
DS

2 90 50

DS
10 10
SPT

5 80 45
Lempung Kepasiran
11 11

80 155

12 12.00 8 12
SPT

6 80 45

13 13

85 155

14 14
SPT

7 80 45
DS

3 90 50
DS

15 15.00 35 15

80 105

16 16
13/08/2015

SPT

Pasir Halus, Sedang s/d Padat 8 80 45

17 17

80 155

18 45 18
SPT

9 80 45

19 19
80 105
DS

4 90 50
DS

20 20
BORING LOG HOLE NO. Abt 1

PROJECT Soil Investigation Pembangunan Jalan Tol Medan - Binjai DRILLING METHOD : Weshing BOR MACHINE : YBM - 05 BOR MASTER

LOCATION : Over Pass Sei Semayang Abutment 1 INCLINATION : Vertical STARTED 24/6/2015 LOGGED BY
SITE : DEPTH (M) 0 FINISHED 26/6/2015 CHECKED BY
COORDINATE ELEVATION :- GWL : APPROVED BY :

GEOLOGICAL UNIT

Undisturbed
SHAPE OF CORE

Disturbed
Sample

Sample
GWL & DATE
ELEVATION

HARDNESS
CORE RQD

SYMBOL
SPT

COLOR
DEPTH
SCALE

SCALE
DATE

RECOVERY (%)
DESCRIPTION N-Value

% CM 25 50 70 100 10 20 30 40 50 60 UDS DS

SPT
10 80 45

21 48 21

80 155

22 22

SPT
11 80 45

23 23

80 155

24 50 24

SPT
12 80 45
Putih ke hitaman
14/08/2015

DS

5 80 50

DS
25 25
Pasir halus, sedang s/d padat

80 105

26 26
SPT

13 80 45

27 27.00 52 27
80 155

28 28
SPT

14 80 45

29 29
80 105
.
DS

6 80 50

DS
30 30.00 26.00 55 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40
BORING LOG HOLE NO. Abt 2

PROJECT Soil Investigation Pembangunan Jalan Tol Medan - Binjai DRILLING METHOD : Weshing BOR MACHINE : YBM - 05 BOR MASTER

LOCATION : Over Pass Sei Semayang Abutment 2 INCLINATION : Vertical STARTED 6/25/2015 LOGGED BY
SITE : DEPTH (M) : 30.00 M FINISHED 6/27/2015 CHECKED BY
COORDINATE ELEVATION :- GWL : APPROVED BY :
GEOLOGICAL UNIT

Undisturbed
SHAPE OF CORE

Disturbed
Sample

Sample
GWL & DATE

HARDNESS
ELEVATION

CORE RQD
SYMBOL

SPT

COLOR
DEPTH
SCALE

SCALE
DATE

RECOVERY (%)
DESCRIPTION N-Value

% CM 25 50 70 100 10 20 30 40 50 60 US DS

70 105

1 1

80 120

2 2

SPT
1 85 45
Pasir Kepasiran Abu-abu

3 3.00 3.00 21 3

90 155

4 4
SPT

2 80 45
DS

1 90 50

DS
5 5

90 105

6 6.00 13 6
12/8/2015

SPT

3 80 45
Lempung Kerpasiran

7 7

85 155

8 8
SPT

4 80 45

9 9.00 26 9
80 105

Pasir Halus
DS

DS
2 90 50
10 10
SPT

5 80 45

11 11

Lempung Kepasiran 80 155

12 12.00 11 12
SPT

6 80 45

13 13
85 155

14 14
SPT

7 80 45
DS

3 90 50
DS

15 15.00 31 15

80 105

16 16
13/08/2015

SPT

8 80 45

17 17
80 155

18 27 18
SPT

9 80 45

19 19
80 105
DS

4 90 50
DS

20 20
.
·          RQD is Rock Quality Designation, RQD = (Total length of cylindrical cores than 10cm)/(Total Core length) x 100%
·          Length core recovery are in percent (%) and CM (Centimeter)
·          LUGEON VALUE isl/min/m under injection water pressure of 10 kg/cm
·          DEPTH and ELEVATION are in meter
·          DIAMETER is in millimeter

Prepared by, Checked by,

(………………………..…..) (………………………..…..)
BORING LOG HOLE NO. Abt 2

PROJECT Soil Investigation Pembangunan Jalan Tol Medan - Binjai DRILLING METHOD : Weshing BOR MACHINE : YBM - 05 BOR MASTER

LOCATION : Over Pass Sei Semayang Abutment 2 INCLINATION : Vertical STARTED 6/25/2015 LOGGED BY
SITE : DEPTH (M) 0 FINISHED 6/27/2015 CHECKED BY
COORDINATE ELEVATION :- GWL : APPROVED BY :

GEOLOGICAL UNIT

Undisturbed
SHAPE OF CORE

Disturbed
Sample

Sample
GWL & DATE
ELEVATION

HARDNESS
CORE RQD

SYMBOL
SPT

COLOR
DEPTH
SCALE

SCALE
DATE

RECOVERY (%)
DESCRIPTION N-Value

% CM 25 50 70 100 10 20 30 40 50 60 UDS DS

SPT
10 80 45

21 23 21

80 155

22 22

SPT
11 80 45

23 23

80 155

24 51 24

SPT
12 80 45
Putih ke hitaman
14/08/2015

DS

5 80 50

DS
25 25

80 105

26 26
SPT

13 80 45

27 27.00 52 27
80 155

28 28
SPT

14 80 45

29 29
80 105
.
DS

6 80 50

DS
30 30.00 26.00 55 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

You might also like