Bachelor'S Degree Programme Term-End Examination December, 2017 C'R) CD Elective Course: Commerce Eco-010: Elements of Costing
Bachelor'S Degree Programme Term-End Examination December, 2017 C'R) CD Elective Course: Commerce Eco-010: Elements of Costing
Bachelor'S Degree Programme Term-End Examination December, 2017 C'R) CD Elective Course: Commerce Eco-010: Elements of Costing
SECTION - A
1 P.T.O.
ECO-010
SECTION - B
Particulars
Materials 40,000
ECO-010 2
5. The following is the record of receipts and issues 15
of a certain material in the factory during the first
week of Jan., 2015 :
Jan. 1 Opening Balance 50 Tons Z 10 per ton
Jan. 1 Issued 30 Tons
Jan. 2 Received 60 Tons @ Z 10.20 per ton
Jan. 3 Issued 25 Tons
Jan. 3 (Stock verification revealed a loss of 1 Ton)
Jan. 4 Received back 10 Tons (previously issued at
from production Z 9.15 per ton)
Dept.
Jan. 5 Issued 40 Tons
Jan. 6 Received 22 Tons @' 10.30 per ton
Jan. 7 Issued 36 Tons
Prepare a stores Ledger Account using LIFO
(Last-in-First-out) method.
3 P.T.O.
ECO-010
0.1t3t-o 10
- I
*.-tivich Witt chi sh1-1
thin 17114-1T
2017
ECO-010 4
VITT -
'} 40,000
ad gtal
~ Trrca. 1,20,000
It a fq-4A- 2,500
'444 1,50,000
5 P.T.O.
ECO-010
5. "R•W*Azt wiat 2015 t (1.1 Yc 15
TrriTt Trrr7-41 a f-pfgri oqiki F-14-frofigcr t :
wiqft wfrqw*Ef 50 "a7 (Z 10 mrcl Ti)
7-4-4# 1 f9Iffqff •"1 1-1711" 30 z-9'
- 9-at 2 7711t 60 79' (Z 10.20 5tf ct zr)
7T4- 3 1971fgra. Trot 25 'a7
7-i-4# 3 (.eict) th-e-414-1 gRI 1 Ti ( ) (-ft -A 3n1
79-1# 4 dctilq-I fqiiM -4 10 Zi ( Z 9.15
TEM Nrci •Z•TIT f9TfrITU# 2ft)
7-4-q1' 5 f-pfi-gm 40 Ti
79-4' 6 717F# 221 (210.30 m Ti)
TT-4ft 7 ?OP:1'ff TRII• 36 Ti
31fffr 3i9' lied (LIFO) r 311747 I .W .
tilt c) ■TIt (sin e-IR
ECO-010 6
(b) P1i-licifiglfwm*3TKR 3Trillw 37-Or -grr-AT
(EOQ) TTuriT Vf-A7 :
(i) TIR:F .iiiii-il•wr -31:14FT 2,000 'F".
(ii) 1i 3lik7 50
mil -Mt (Imo 40
(iv) lz-11-T 'q• op id 31fci 1Iid
'W• 8%
ECO-010 7