Installation REPORT - Cipla AAQMS

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

S. N.

Enviro Solutions
H.no.6-1-279, Plot no.10, Mantri Mansion Apartment, Walker Town,
Padma Rao Nagar, Hyderabad -500025 (Telangana)

INSTALLATION AND COMMISSIONING REPORT


Company Name: M/s. CIPLA LIMITED -Bangalore
 
1. Name of the Supplier : S N Enviro Solutions, Hyderabad.
2. Name of the Equipment’s : AAQMS

AAQMS System: Comprising of following major items

S.No INSTRUMENT Make Model Serial Qty Status


No Number
1. PM 10 ANALYZER FPI BPM-200 001P18C00B1 1 Working

2. PM 2.5 ANALYZER FPI BPM-200 001P18C00B5 1 Working

3 NO/NO2/NOX ANALYZER FPI AQMS-600 001PI8C00A9 1 Working

4 SO2 ANALYZER FPI AQMS-500 001P18C0103 1 Working

5 CO ANALYZER FPI AQMS-400 001P18C00D7 1 Working

6 O3 ANALYZER FPI AQMS-300 001P18C009A 1 Working

DYNAMIC DILUTION 102P204001F Working


7 FPI AQMS-200 1
CALIBRATOR
CE221890723 Working
8 ZERO AIR GENERATOR FPI AQMS-100 1
T21201 Working
9 VOC MONITOR UNIPHOS 500DT 1
USB TO 8 YBA01220010
10 CONVERTER 3ONEDATA 1 Working
PORT 64
LOGICLADD
11 SOFTWARE With PC 1 Working
ER

Note:-Display board installed on 09.08.2021

3. Short Shipments If any : NH3


4. Date of Installation :03.08.2021
5. Date of commissioning :09.08.2021

Installation and commissioning of AAQMS is completed successfully in all respects.

M/s. S N Enviro Solutions. M/s. Cipla Limited

You might also like