Standard Activity 9
Standard Activity 9
7/18/21
EDUC 650
Standard Activity 9.38A - Facility and Maintenance Administration
I consulted with Mr. Travis Austin, an assistant principal at Huntington High School, on
work order requests that have been made this year. He was able to print off a four-page
document highlighting those different work orders. At first glance, I could not believe all the
things that had to be fixed around our school! Most of the issues at Huntington High revolved
around plumbing/water issues. Water leaks are a majority of the work order requests placed.
They occurred in sinks, bathrooms, toilets, and water fountains. Then there were a multitude of
other work orders placed on teacher and principal phone lines. With it being winter season
there was also a work order for salt spreaders to maintain safety on the walk ways. The rest of
After looking at the report, my only recommendation is that all water areas be inspected
and fixed during the summer before school starts that way those leaks don’t occur when
students and staff report in August. I would also document when all lights have been replaced
and try to keep all lights on a consistent schedule where they are being replaced/fixed at the
same time. This will save on time and money do to logistical information.