‘Millennium Enterprises’ is a large scaled bicycle manufacturer and dealer that has several
branches across the island. At present, all of the branches make use of a local database system
where the company transactions would be backed up on a weekly basis and sent to the Head
Office. The Managing Director of ‘Millennium Enterprises’ has decided that the local database
systems used by all branches have to be replaced by a web based system with a database that
can be accessed globally. This requires transfer of all data to the main server, which would be
located at the Head office premises. A network would be set up linking all the branches to the
main server.
Assume that you have been employed as a Project Manager by ‘Millennium Enterprises’ to
manage the implementation of the web based system and the process of changeover.
To initiate the project, you are required to prepare a project proposal with comprehensive
details of the below mentioned elements;
Upon receipt of approval for the project proposal, you are supposed to develop the project plan
which reflects the anticipated execution of the proposed project.
Your project plan should include the following elements,
2.1 Introduction to the Project Organization
You are required to propose and plan the most suitable organizational structure (OBS).
(LO 2.1)
2.2 Background of the project
You are required to make a presentation (10 – 15 slides) that provides a brief overview on your
project, project outcomes and sets recommendations in terms of scope, specification, cost,
increased reliability, etc (LO 3.5).
3.1 Design the project organization with reference to prepared Task 2.4.1
project management plans
3.2 Use project scheduling and cost control techniques Task 2.4.3,
Task 2.4.4
3.3 Report the methods used to measure project performance Task 3.1
3.4 Report project change control procedures
3.5 Discuss the outcomes of the project and make recommendations. Task 4