Engineer Reconnaissance Report: KEY B. Object C. Time Observed D. Work Estimate E. Additional Remarks and Sketch
Engineer Reconnaissance Report: KEY B. Object C. Time Observed D. Work Estimate E. Additional Remarks and Sketch
Engineer Reconnaissance Report: KEY B. Object C. Time Observed D. Work Estimate E. Additional Remarks and Sketch
)RUXVHRIWKLVIRUPVHH$730&:3SURSRQHQWDJHQF\LV75$'2&
1. OPORD NUMBER AND NAME 2. RECONNAISSANCE LEADER (Name, grade, unit) 3. LOCATION / DTG OF RECONNAISSANCE
DD FORM 3015, FEB 2016 REPLACES DA FORM 1711, WHICH IS OBSOLETE. Adobe Designer 9.0
9. ENGINEER WORK ESTIMATE
d.
a. b. c. e. EQUIPMENT f. MATERIALS
NUMBER OF
LOCATION DESCRIPTION UNIT
REQUIRED
KEY OF WORK REQUIRED (1) TYPE (2) NUMBER (3) HOURS (1) TYPE (2) UNIT (3) QUANTITY
HOURS