CEA - Project Management
CEA - Project Management
CEA - Project Management
-The Project Life Cycle Analysis should be conducted starting from the initiation stage, planning, executing,
monitoring and closing.
-Prepare a Stakeholder identification, interaction and requirement section. The roles of the stakeholders who are
working in an integrated manner should be investigated.
-Give an analysis on the External Environmental Concerns for the project given.
-Give the technical and engineering requirements of the project. What engineering product or process innovation
is being performed. What benefits will arise for the customers or end users.
-Prepare a detailed work Break Down Structure highlighting the major deliverables and then preparing the
hierarchy of work steps. The responsibility matrix should also be established along with the Organization
Breakdown structure.
-Explain the constraint parameters of the project and their tradeoff across cost, time, scope, safety, quality etc.
-Evaluate the Risk Management Process and the mechanisms to identify, assess, remove and monitor the project
risks.
- Summarize the ethical, gender, social, climate, community and safety requirements generated due to the project.
What occurrences are there and how they are being handled or planned to be handled.
-The monitoring and control of the project to see that everything is on track should be investigated. What control
mechanisms were in place and how they detected and corrected the fluctuations of the project.
-The closing stage mechanisms of any renewable energy project should be analyzed. What steps were undertaken
to close, handover, commission the selected project. What were the post transition steps and milestones?
1
Instructor - Salman Abubakar Bugvi
Assistant Professor – [email protected]
A comprehensive, clear, concise, logical and precise report of around 20-25 pages in Times New Roman 11 Font
covering the above mentioned analysis points should be submitted. Plagiarism will be strictly monitored and
penalized towards all members of the group if occurred.
Analysis is adequate
Analysis is not Analysis is performed Structural model is
Analysis/ Results with minimal mistakes Analysis performed
performed or done but Structural model is reasonable but with
CLO2-PLO11 in defining the perfectly.
entirely wrong. inaccurately defined. mistakes.
structural model.
Rules of Submission
2
Instructor - Salman Abubakar Bugvi
Assistant Professor – [email protected]
- Plagiarism limit is fixed at 20% due to accidental or unintentional similar words.
- Students are advised to check plagiarism limit of their report themselves before submission.
- CEA of Project Management has a total of 15 marks towards your subject score.