Non Conforming Material Report PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

www.highcountryinc.

com

Non-Conforming Material Report

NCMR_TMP
www.highcountryinc.com

Owners and List of Contacts


Name Email Phone Role

Signoffs
Phase Name Date Signature

Revision History
Date Reason for change(s) Author(s)

© 2006 High Country Solutions All rights reserved.

NCMR_TMP
www.highcountryinc.com

1. DEFINITIONS

MRB – Material Review Board is the body that dispositions non-conforming


material. It is comprised of, at minimum, the PE or the PM but may be several
people if necessary.

Process Delivery Date – This is the date on which the material was to be
delivered from the process in question to the next process in the operation flow.

Total to be delivered – This is the total number of material items requested for
delivery from the process in question.

Project – Name of the project or possibly order to which the material was to be
attached.

Customer(s) – Name of the customer or customers for which the material was
being produced.

NCMR Initiator – Name of the individual who first identified the material as non-
conforming.

PR# - If this material is being delivered as part of a Purchase Requisition from


another organization it is often a good idea to identify the PR# here.

Customer Due Date – The date on which the customer or customers expect to
take delivery of the completed order of which the material in this report may be a
part.

Internal Completion Date – This is the date on which your organization


expected to complete the order of which this material was a part.

Item – Line item number of each unit of material to be identified in the report.

Qty – This is the total number of each item of material being described in the
report.

Part Number – Your organizations part number for each item of material
identified in the report.

Part Description – A brief description of each item of material identified in the


report.

NCMR_TMP
www.highcountryinc.com

Supplier – If the process in question included acquiring the material from a


supplier the supplier’s name will be recorded here.

Process in question – A name of the process within your organization that


produced the material identified in the report.

NCM Description – A brief description of the nature of the non-conformance.

MRB Meeting Date – The date on which the material review board convened.

MRB Meeting Members – A list of members of the material review board which
reviewed the material identified in the report.

Disposition of Non-Conforming Material (Use As Is) – This is an indicator of


how the material was handled after the non-conformance was identified and
documented.

Disposition of Non-Conforming Material (Scrap) - This is an indicator of how


the material was handled after the non-conformance was identified and
documented.

Disposition of Non-Conforming Material (Return to Supplier) - This is an


indicator of how the material was handled after the non-conformance was
identified and documented.

Disposition of Non-Conforming Material (Rework) - This is an indicator of how


the material was handled after the non-conformance was identified and
documented.

Rework Instructions – If the material is to be reworked then the instructions for


that rework should be described here.

Staff Responsible – This field identifies the Staff member(s) responsible for
completing the rework of the material.

Date Completed – A field for documenting when the rework activity was
complete.

Notify Customer – If the material is to be used as is with the non-conformance


intact then this indicator should be marked. Along with this indicator the “Obtain
product waiver” indicator will also be marked.

NCMR_TMP
www.highcountryinc.com

Write CAR – If the non-conformance was a result of failure to comply with a


documented process, then a corrective action report may be necessary.

Write PAR – If the non-conformance is the result of a flaw in the process as


established, then a preventive action report may be required to keep such non-
conformances from occurring in the future.

Obtain Product Waiver – If the non-conformance is such that the customer may
still accept the material, then a product waiver should be obtained to verify that
the customer agrees to receive the material even though it is outside the
specification requirements.

Write SCAR – If the process in question uses a supplier and the material
received from that supplier is non-conforming then a report should be made to
the supplier in the form of a supplier corrective action report.

Write Re-Inspection Report – If the MRB determines that the material is in fact
not out of conformance with the specifications then a re-inspection report should
be produced. If upon re-inspection the material is verified to be within
specification then the original non-conformance report should be closed and the
product should be delivered. It may also be useful to review what caused the
false inspection to occur in the first place.

Other – Your organization may also have other processes in place to manage
customer relations or internal material control. If so, and these processes are
also to be used when handling this material such should be indicated here.

NCMR_TMP
NCMR # N-______-___
Order #: Process Total to be Project: NCMR Initiator: Customer Internal
Delivery Date: Delivered: Due Date: Completion Date:
Customer(s): PR #:

Description of Non-Conformance:
Part Process in
Item Qty Part Description Supplier NCM Description
Number Question
1
2
3
4
5
6
7
8
9
10

Material Review Board (MRB) Information: MRB Meeting Date:


Disposition of Non-Conforming Material: MRB Meeting Members:
Use As Is Scrap Return to Supplier Rework (State
Rework Instructions)
Staff
Rework Instructions: Date Completed
Responsible

Actions:
Notify Customer Additional Comments:
Write CAR
Write PAR
Obtain Product Wavier
Write SCAR
Write Re-Inspection Report
Other

NCMR_TMP

You might also like