Non Conforming Material Report PDF
Non Conforming Material Report PDF
Non Conforming Material Report PDF
com
NCMR_TMP
www.highcountryinc.com
Signoffs
Phase Name Date Signature
Revision History
Date Reason for change(s) Author(s)
NCMR_TMP
www.highcountryinc.com
1. DEFINITIONS
Process Delivery Date – This is the date on which the material was to be
delivered from the process in question to the next process in the operation flow.
Total to be delivered – This is the total number of material items requested for
delivery from the process in question.
Project – Name of the project or possibly order to which the material was to be
attached.
Customer(s) – Name of the customer or customers for which the material was
being produced.
NCMR Initiator – Name of the individual who first identified the material as non-
conforming.
Customer Due Date – The date on which the customer or customers expect to
take delivery of the completed order of which the material in this report may be a
part.
Item – Line item number of each unit of material to be identified in the report.
Qty – This is the total number of each item of material being described in the
report.
Part Number – Your organizations part number for each item of material
identified in the report.
NCMR_TMP
www.highcountryinc.com
MRB Meeting Date – The date on which the material review board convened.
MRB Meeting Members – A list of members of the material review board which
reviewed the material identified in the report.
Staff Responsible – This field identifies the Staff member(s) responsible for
completing the rework of the material.
Date Completed – A field for documenting when the rework activity was
complete.
NCMR_TMP
www.highcountryinc.com
Obtain Product Waiver – If the non-conformance is such that the customer may
still accept the material, then a product waiver should be obtained to verify that
the customer agrees to receive the material even though it is outside the
specification requirements.
Write SCAR – If the process in question uses a supplier and the material
received from that supplier is non-conforming then a report should be made to
the supplier in the form of a supplier corrective action report.
Write Re-Inspection Report – If the MRB determines that the material is in fact
not out of conformance with the specifications then a re-inspection report should
be produced. If upon re-inspection the material is verified to be within
specification then the original non-conformance report should be closed and the
product should be delivered. It may also be useful to review what caused the
false inspection to occur in the first place.
Other – Your organization may also have other processes in place to manage
customer relations or internal material control. If so, and these processes are
also to be used when handling this material such should be indicated here.
NCMR_TMP
NCMR # N-______-___
Order #: Process Total to be Project: NCMR Initiator: Customer Internal
Delivery Date: Delivered: Due Date: Completion Date:
Customer(s): PR #:
Description of Non-Conformance:
Part Process in
Item Qty Part Description Supplier NCM Description
Number Question
1
2
3
4
5
6
7
8
9
10
Actions:
Notify Customer Additional Comments:
Write CAR
Write PAR
Obtain Product Wavier
Write SCAR
Write Re-Inspection Report
Other
NCMR_TMP