100% found this document useful (1 vote)
1K views1 page

Piping and Instrumentation Diagram (P&ID)

This document appears to be tracking supply levels over time, listing various components and their levels (denoted by codes like FT, FY, etc.) on different dates. Tank 1 and Tank 2 are mentioned, and levels of various components are listed between dates ranging from 01 to 05. The document also notes when components were created by an unlicensed version.

Uploaded by

Bima Sakti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Piping and Instrumentation Diagram (P&ID)

This document appears to be tracking supply levels over time, listing various components and their levels (denoted by codes like FT, FY, etc.) on different dates. Tank 1 and Tank 2 are mentioned, and levels of various components are listed between dates ranging from 01 to 05. The document also notes when components were created by an unlicensed version.

Uploaded by

Bima Sakti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SUPPLY

Created by Unlicensed Version


FCV
LAL LAH TANGKI 1 04
01 01

LS FY FQI
01 04 04

LY LT FIC FQ
01 01 04 04

FCV
LR
01 05
FT FY
04 04
FY
05
FR FAL

Created by Unlicensed Version 04 05

FAL FS FIC FS
04 04 05 05
FCV TANGKI 2 FQ FR
05 05
03
FY FT
05 05
FQI
05
LR
FE FT 02
03 03 LIC LT
02 02
FY FIC LS
03 03 FY 02
03 LAH LAL
FAL FS FR
03 03 03 02 02
FQ
03
Created by Unlicensed Version

You might also like