0% found this document useful (0 votes)
41 views4 pages

Call Report Adaptive Cruise Control

ACC

Uploaded by

Praful Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views4 pages

Call Report Adaptive Cruise Control

ACC

Uploaded by

Praful Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Call Report

Adaptive Cruise Control

Group Members:
Barro Alessandro, Bruscoli Nicolas, Ceccarelli Viviana,
Chiacchiararelli Leonardo, Cintura Manuel, Mariani Lucia

May 11, 2021


Abstract

This document will be used to keep track of the project calls, highlighting the main
points of each meeting in order to help group members in the development of the project.
Call 24/03/2021

ˆ General brainstorming on the choosen topic;


ˆ First draft of a possible work division;
ˆ General brainstorming on the high level requirements of the model;
ˆ First sketch of the Simulink model;

Call 27/03/2021

ˆ Low level requirements definition;


ˆ Work division;
ˆ Clarification of doubts;

Call 01/04/2021

ˆ Check of the overall progress;


ˆ Syncronization of the work for the Easter Holidays;

Call 09/04/2021

ˆ Check of the overall progress;


ˆ Syncronization on next steps;

Call 17/04/2021

ˆ Check of the overall progress;


ˆ Unit testing completed;
ˆ Code generation issues, problems arised in generation of SIL and PIL blocks;
ˆ Syncronization on next steps: solve problems in SIL and PIL and started to collect
drafts about the project report;

Call 27/04/2021

ˆ Check of the overall progress;


ˆ Code generation problems solved;
ˆ SIL and PIL blocks generated;
ˆ Syncronization on next steps;

1
Call 08/05/2021

ˆ Check of the overall progress;

ˆ Started the correction of the project report;

ˆ Managing of the repository for insertion of new file;

Call 11/05/2021

ˆ Analysis and correction of the Project Report;

You might also like