Realtek ATSC 3.0 Project Introduction

Realtek is working on an ATSC 3.0 project with iWedia to develop an ATSC 3.0 software stack. The initial scope was to create a standalone ATSC 3.0 library, but additional work was requested including Android integration, a web browser/server, and extending Realtek's existing ATSC application. The timeline was extended from April 2021 to February 2022. Key milestones include developing playback functionality, an EPG, and achieving conformance testing requirements. Potential risks include delays in formal acceptance of change requests from Realtek and ensuring all open source licenses are approved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views7 pages

Realtek ATSC 3.0 Project Introduction

Realtek is working on an ATSC 3.0 project with iWedia to develop an ATSC 3.0 software stack. The initial scope was to create a standalone ATSC 3.0 library, but additional work was requested including Android integration, a web browser/server, and extending Realtek's existing ATSC application. The timeline was extended from April 2021 to February 2022. Key milestones include developing playback functionality, an EPG, and achieving conformance testing requirements. Potential risks include delays in formal acceptance of change requests from Realtek and ensuring all open source licenses are approved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Realtek ATSC 3.

- project introduction -

17/06/2021
Summary
1. Project Scope and Budget (Initial, Extended)
2. Project Timeline (Initial, Extended)
3. Project Milestones
4. Project Risks and Issues

CONFIDENTIAL – Reproduction prohibited without the prior permission of 2


Project Scope
• Initial scope: Realtek ATSC3.0 project scope is reference implementation of ATSC 3.0 software stack as standalone library,
which will be ready for integration on STB/TV platforms (Budget 516MW).

• Extended scope: Following Change requests are added:


CR - 001 - Android integration (108MW): As part of Android integration iWedia will support Android CHAL
creation, integration of ATSC 3.0 stack in Android (creating Android services, and other integration
work), TIF development support and Tuner HAL implementation.
CR - 002 - Browser and webservers (106MW): Application layer support will cover: adding webserver/websocket
support, json handling, cache, and integration with middleware.
CR - 003 - Extension of Realtek application and integration (15MW): RealTek has TV application that supports
only DVB and ATSC 1.0. Therefore, RealTek requested to iWedia to extend their existing ATSC TV
application (to support ATSC 3.0) and to integrate application.
CR - 004 - Project extension (April-October) (none): RealTek requested MP ready ATSC 3.0 stack for this
project. As additional certification and testing need to be done till October 2021, project need to be extended.
CR - 005 - Certification preparation (56MW): RealTek requested MP ready ATSC 3.0 stack for this project. Therefore,
additional certification and testing need to be done between February and mid August 2021.

CONFIDENTIAL – Reproduction prohibited without the prior permission of 3


Project Timeline
• Initial project end was: April 2021.
• As project scope extended -> new project end: February 2022.

CONFIDENTIAL – Reproduction prohibited without the prior permission of 4


Project Milestones

MILESTONE Planned date


M01 - PoC playback of ROUTE and MMTP via Comedia middleware 2020-07-17
M02 - ROUTE and MMTP playback with UI application 2020-09-25
M03 - Service list and EPG 2020-11-06
M04 - Parental/RRT, Subtitles/CC and EAS/AEA 2021-02-05
M04.1 - EAS feature verification 2021-04-30
M05 - iWedia Full feature release - verified with iWedia Verification Test Plan 2021-08-09
M05.1 - iWedia Full feature release - integration with Realtek UI and ported to Android 2021-09-31
M06 - Alpha release (pass NextGen TV suite 80%) 2021-11-02
M07 - Beta release (pass NextGen TV suite 100%) 2021-12-13
M08 - MP golden release 2022-02-01

CONFIDENTIAL – Reproduction prohibited without the prior permission of 5


Project Risks and Issues
• Issues:
➢ CRs status still open: Project scope not officially confirmed. Formal acceptance from Realtek pending.
➢ Project acceptance: acceptance criteria Eurofins conformance test and A3SA program. Still officially not signed.
➢ Licence issue: usage of each open source licence need to be reviewed and signed by Realtek (in order to have software
on Android, iWedia browser and iWedia player using libraries which have some open source licences). Formal acceptance
from Relatek pending.

➢ Internal QA campaign still not executed: In the following period, developers will complete VTP.

• Risks:
➢ A3SA discussion (RTK,iWedia) as soon as possible to overcome potential timeline problem. Realtek will lead the official
discussion with A3SA and include iWedia for clarification all issues.

CONFIDENTIAL – Reproduction prohibited without the prior permission of 6


Contact us:
www.iwedia.com
Headquarters EU Sales Office EU Sales Office [email protected] R&D Centers America Sales Office Asian Sales Office
Lausanne Frankfurt and La Ciotat Belgrade and Sao Paulo Bangkok, Thailand
Switzerland Freiburg France Novi Sad Brazil New Delhi, India
Germany Serbia Seoul, South Korea

You might also like