Contractor's Organizational Chart For The Contract

The document outlines requirements for contractors bidding on a project to submit an organizational chart showing key personnel needed to perform the work, including a project manager, project engineer, structural engineer, materials engineer, and foremen. It specifies that the chart should represent the contractor's organization for this specific project, and that each key person listed must submit a bio and qualifications using provided forms. All documents must be included in the technical envelope for the bid.

Uploaded by

NeilJohn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Contractor's Organizational Chart For The Contract

The document outlines requirements for contractors bidding on a project to submit an organizational chart showing key personnel needed to perform the work, including a project manager, project engineer, structural engineer, materials engineer, and foremen. It specifies that the chart should represent the contractor's organization for this specific project, and that each key person listed must submit a bio and qualifications using provided forms. All documents must be included in the technical envelope for the bid.

Uploaded by

NeilJohn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Contractor’s Organizational Chart for the Contract

The Bidder shall submit its Organizational Chart that it intends to use to perform the works if awarded
the contract(s). The Bidder shall indicate in the chart the names of the Project Manager, Project
Engineer, Structural Engineer, Materials Engineer, Foremen, and other key personnel necessary to
perform the works.

(Attach the required Proposed Organizational Chart for the Contract as stated above)

Submitted by : [Insert registered business name of bidder]


:
(Signature over printed of Contractor’s authorized representative)
Designation :
Date :

1. This organization chart should represent the “Contractor’s Organization” required to perform the
contract(s) or works to be bid if awarded the same, and not the organizational chart of the entire
firm.

2. Each of the nominated project manager/engineers/other key personnel shall comply with and
submit the “Bio-data” and the “List and Qualification of Key Personnel Proposed to be Assigned
to the Contract” using the forms provided in Section IX, Bidding Forms.

3. All of these are required to be in the Technical Document envelope of the Bidder.