Sr. No Paper Titles Authors Year Conclusion Parameters of Study 1
Sr. No Paper Titles Authors Year Conclusion Parameters of Study 1
Sr. No Paper Titles Authors Year Conclusion Parameters of Study 1
2 Parametric Reliability O.Anikeevaa,A 2016 The problems of technical diagnostics Manage quality of
Assurance for Machine- .Ivakhnenko A. and also the problem in ensuring machine tool repair by
Tools Zhirkovc parametric reliability of machines are identifying the
solved. The developments offered will interconnection between
allow specialists of enterprises to accuracy parameters in
control quality of technological parts machined and
equipment repair. machine-tools
3 Research on Reliability Wei 2018 The reliability assessment method of Reliability curve is
Assessment of Dai,Yongjiao mechanical equipment based on the obtained by PFC model
Mechanical Equipment Chi,Zhiyuan Lu performance degradation path, which .Experimental
Based on the and Yu Zhao was developed for reliability through investigation (tool wear
Performance–Feature exploring the relationship between change)- Gaussian
Model signal characteristics and performance distribution function and
degradation logarithmic distribution
function
4 Analysis and Research of ZheLiu, 2013 This paper focus on the reliability of CNC machine tools are
Reliability Technology of Jingchuan CNC machine tool. It puts forward used.
CNC Machine Tools Dong,Taiyong several suggestions to enhance the
Reliability improves by
Wang and Bo L reliability of CNC machine tool.
900 hrs
5 Review of life cycle Ilesanmi 2021 The aim of this study was to review From the articles reviewed
models for enhancing Daniyan , different life cycle models used in the 60% applied life cycle
machine tools Khumbulani machine tools industry. Some of the assessment (LCA)
sustainability: lessons, Mpofu , approaches employed in the literature methodology to reduce
trends and future Boitumelo reviewed for enhancing the energy consumption and
directions Ramatsetse , performance of machine tools enhance environmental
Munish Gupta throughout their life cycles include: sustainability, while 40%
LCA principles for low carbon employed other
manufacturing, life cycle inventory assessment tools.
and impact assessment, Internet of
Things (IoTs)
6 Reliability of Coated Carbide Mohamad 2018 This paper concludes that by Testing tool - PVD-coated TiAlN
Tool During Turning Gaddafee , knowing reliability of a cutting carbide tool.Tool used for test -
Hardened Steel Satish tool and its behaviour, a Hardened AISI 4340 steel (35 HRC).
Chinchanikar suitable cutting condition could Dry cutting test carried out at 142,
be selected with a view to 265, 345 and 487 m/min speeds at
assure the machined surface feed -0.125 mm/rev and depth - 0.8
quality balancing with the mm.
overall machining economics.
7 Research on Reliability Test Yuzhen Caia 2020 The non-stationary working Based on the principle of
Technology of Machine Tool Chong Penga*, conditions in the actual electromagnetic induction, the
Spindle under Non-stationary Zhiwei Zhanga, machining process were loading curve was used to simulate
Conditions Hui Zhaoa, Miao analyzed. Moreover, the cutting the dynamic loading test of the
Chena stability boundary was used as spindle on the electromagnetic
the initial critical value of the loading test platform.
loading test.
8 Reliability Study on PUR Ana toderita, 2019 Weibull Reliasoft program it Keep track of their production, orders
Injection Machine Sorin vlase was possible to generate the and failures most production sites are
reliability, unreliability and switching to L2L programs adapted
failure rate vs. time diagram in to their necessities. This program is
order to have a clearer view on automatized and keeps track of
the issue. productions and failures.
9 Investigating the reliability Balahaha Hadi 2020 In this study, a three-layer feed- Parameter combinations were
of machine learning Ziyad Sami, forward ANN model is found to be turbidity (one-input);
algorithms as a sustainable Wong Jee khai , presented to predict the total TSI concentration and turbidity
tool for total suspended solid Balahaha Fadi suspended solid (TSS) (two-inputs); NO3 concentration,
prediction Ziyad Sami , concentration in the Fei Tsui TP concentration, and turbidity
Chow Ming Fai, Reservoir of Taiwan. The three- (three-inputs); TSI concentration,
Yusuf Essam Ali layer feed-forward. NO3 concentration, TP
Najah Ahmed concentration, and IRON (four-
inputs); and TSI
concentration,NO3 concentration,
TP concentration, IRON, and
turbidity (fiveinputs).
10 An Experimental Mohamad 2018 The coeffiecient of correlations Test carried out on AISI 4340 steel
Investigation of Cutting Tool ,Gaddafee obtained for experimental (35 HRC) and Tool used – TiAlN
Reliability and its Prediction ,Satish values of reliability and coated carbide tool.
Using Weibull and Gamma Chinchanikar predicted values of reliability
Models: A Comparative using Gamma and Weibull
Assessment. models are close to one.
Gap Analysis:
A set of techniques to examine and describe the gap between current performance and desired future goals. Gap Analysis is the comparison of actual
performance with potential or desired performance; that is the current state and the desired future state .It is important to being any new activity with a clear
understanding of the goals and objectives. Reliability strategic vision is the envisioned future from a reliability view point. It includes necessary infrastructure,
resources, skills, methods capability, and reliability of products and processes. It should develop with full management support and understood by all
employees. It is an assessment done by observation and direct communication with key stake holders in company. It should analyses shortcomings to achieving
the vision, identifies capability of current products and processes, and assesses effectiveness of current reliability method. Using the reliability strategy vision
and the reliability gap assessment select the vital few reliability method that are needed to close the gaps and achieve the reliability objective.
Problem Statement:
The problem statement is that the human life perform the operation on high risk, due to unknowing reliability of the tools. Reaching high reliability for complex
system is very difficult and critical .And due to disturbed tool the time consume to perform the operation is more. Time to time maintenance is necessary. This is
because reliability affects not only technical system performance but also operating and support cost. Not taking proper care of organization of reliability
resulted in this product falling.