Tata Projects Limited (TPL) Sustainability Reporting 2019-20
Tata Projects Limited (TPL) Sustainability Reporting 2019-20
Tata Projects Limited (TPL) Sustainability Reporting 2019-20
Site ARP-200209-PGCIL-BASAR-SS1
Co-Ordinator Bharat Singh
Indicator
301-1
Number (s)
1 Natural Sand M3
2 Stone aggregates MT
3 Marble/Granite Sqmtr
4 Wood Batten CFT
5 Pre Fab Steel Structure (For T&D) MT
6 Concrete M3
7 Steel/ MS (reinforement + structural) MT
8 Binding Wire MT
9 Pipes(erection) RMT
10 Cables RMT
11 Length of pipe (PVC) RMT
12 Ply wood Sqmtr
13 Total System Formwork Used Sqmtr
14 Precast M3
15 Prefab Sqmtr
16 Total Steel Shuttering Used Sqmtr
Pre Cast includes :- Per as per design + Drain Cover + Paver Blocks + Cable Trench + Lentiles (RCC) + other RCC pre c
Pre Fab Includes:- Tempoary Facilities Store, Site Office, Pantery, Labour Colony , Guard Post, and Other Structural
ustainability Reporting 2019-20
Guidance:
2.1 When compiling the information specified in Disclosure 301-1, the reporting organization
should:
2.1.1 include the following material types in the calculation of total materials used:
2.1.1.1 raw materials, i.e., natural resources used for conversion to products or services, such
as
ores, minerals, and wood;
2.1.1.2 associated process materials, i.e., materials that are needed for the manufacturing
process
but are not part of the final product, such as lubricants for manufacturing machinery;
2.1.1.3 semi-manufactured goods or parts, including all forms of materials and components
other
than raw materials that are part of the final product;
2.1.1.4 materials for packaging purposes, including paper, cardboard and plastics;
2.1.2 report, for each material type, whether it was purchased from external suppliers or
sourced internally
(such as by captive production and extraction activities);
2.1.3 report whether these data are estimated or sourced from direct measurements;
2.1.4 if estimation is required, report the methods used.
2.1.5 if material used - place value, if not used - place 0, if not applicable - place NA, if not
captured please state in the Remarks
FY 2019-20
Apr '19 May '19 Jun '19 Jul '19 Aug '19 Sep '19 Oct '19 Nov '19
Raw Materials
Intermediate Materials
Associated Materials
s (RCC) + other RCC pre cast Structure ( Exp:- Bridges , Culvert Box, Boundary Wall, Metro Structures)
st, and Other Structural Facilities used at site.
Documents
referred/Supporting Conversion factors used
Dec '19 Jan '20 Feb '20 Mar '20 Annual Total documents for (if any)
validation
0.00
0.00
0.00
0.00
Remarks (if
any)