Bills of Quantities (Boq) : Construction of Rear Side Boundary Wall at SRCC
Bills of Quantities (Boq) : Construction of Rear Side Boundary Wall at SRCC
Bills of Quantities (Boq) : Construction of Rear Side Boundary Wall at SRCC
EARTH WORK :
2.6 Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5m in width as well
as 10 sqm on plan) including disposal of
excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
Page 1
DSR NO. DESCRIPTION OF ITEM/DSR SUB. NO. QTY. RATE PER AMOUNT
BRICK WORK
Page 2
DSR NO. DESCRIPTION OF ITEM/DSR SUB. NO. QTY. RATE PER AMOUNT
MISCELLANEOUS WORK :
16.11 Dry stone pitching 22.5 cm thick including supply
of stones and preparing surface complete. 400 Sqm.
TOTAL