0% found this document useful (0 votes)
137 views9 pages

Iso Onsite Reports

1) The document contains lists of machinery, equipment breakdowns, and daily inspection reports from two companies - Mythri Metallizing Pvt Ltd and Corrosion Protection Engineers India. 2) The lists include information on compressors, hoppers, pressure pots, and rectifiers. 3) The inspection reports track readings from blasting and coating processes and are signed by production managers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views9 pages

Iso Onsite Reports

1) The document contains lists of machinery, equipment breakdowns, and daily inspection reports from two companies - Mythri Metallizing Pvt Ltd and Corrosion Protection Engineers India. 2) The lists include information on compressors, hoppers, pressure pots, and rectifiers. 3) The inspection reports track readings from blasting and coating processes and are signed by production managers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

MAINTENANCE

REF: MMPL/PM/MTN/00
REV: 00
MYTHRI METALLIZING PVT LTD DATE:
TITLE: LIST OF MACHINERIES

SL.NO. MACHINERIES QUANTITY REMARKS

1 Diesel Compressor 1 No Good Condition

2 5 HP electric compressor 1 No Good Condition

3 Hopper 1 No Good Condition

4 Painting Pressure Pot 2 No Good Condition

Prepared By: Approved By:


MAINTENANCE REF: MMPL/PM/MTN/00
MYTHRI METALLIZING PVT LTD REV: 00
Title: Machine Break Down Register DATE:

BREAK DOWN TIME COST B/D


EQUIPMENT TOTAL DETAILS OF SPARES APPROVE
DATE OF ATTENDED REMARKS
NUMBER FROM TO TIME BREAK DOWN REPLACED D BY
SPARES BY

Prepared By: Approved By:


SITE DAILY INSPECTION REPORT

Date:

Blasting Profile (SA 2 ½ )

Reading 1
Reading 2

Reading 3

Reading 4

Painting DFT

Sl No Primer Mio Finish


Reading 1
Reading 2

Reading 3

Manager Sign: Production In-charge Sign:


MYTHRI METALLIZING PVT LTD SITE PRODUCTION REPORT REF: MMPL
REV: 00

DATE: SHIFT: PRODUCTION REPORT NO:


Sl No Customer/Party Name Description Weight Quantity Star End Time Remarks
Time

Total Vol Of The Job

Total SQM: Total Weight:

Blaster Name: Painter Name: Helper Name:


1. 1. 1.

2. 2. 2.

Manager Sign: Production In-Charge Sign:


MAINTENANCE
REF: CPEI/PM/MTN/00
CORROSION PROTECTION
REV: 00
ENGINEERS INDIA DATE:
TITLE: LIST OF MACHINERIES

SL.NO. MACHINERIES QUANTITY REMARKS

1 Compressor 2 No Good Condition

2 Arc rectifier 4 No Good Condition

3 Hopper 3 No Good Condition

Prepared By: Approved By:


MAINTENANCE REF: CPEI/PM/MTN/00
CORROSION PROTECTION REV: 00
ENGINEERS INDIA Title: Machine Break Down Register DATE:

BREAK DOWN TIME COST B/D


EQUIPMENT TOTAL DETAILS OF SPARES APPROVE
DATE OF ATTENDED REMARKS
NUMBER FROM TO TIME BREAK DOWN REPLACED D BY
SPARES BY

Prepared By: Approved By:


SITE DAILY INSPECTION REPORT

Date:

Blasting Profile (SA 2 ½ )

Reading 1
Reading 2

Reading 3

Reading 4

Painting DFT

Sl No Coating thickness Aluminium paint DFT


Reading 1
Reading 2

Reading 3

Manager Sign: Production In-charge Sign:


CORROSION PROTECTION SITE PRODUCTION REPORT REF: CPEI
REV: 00
ENGINEERS INDIA

DATE: SHIFT: PRODUCTION REPORT NO:


Sl No Customer/Party Name Description Weight Quantity Star End Time Remarks
Time

Total Vol Of The Job

Total SQM: Total Weight:

Blaster Name: Coater Name: Helper Name:


1. 1. 1.

2. 2. 2.

Manager Sign: Production In-Charge Sign:

You might also like