0% found this document useful (0 votes)
169 views2 pages

Job Hazard Analysisb BF

This document summarizes the job hazard analysis for painting work at the Sussen Asia Pvt. Ltd. Shirtwal project. It identifies hazards for storing paints, keeping paints on site, shifting structural materials, buffing, and painting. Control measures are outlined to address fire hazards from paint storage, injury risks from material shifting, and health risks like eye injuries, dust, and smell from buffing and painting. The analysis was attended by safety personnel from Rohan abuilders and Sussen Asia and reviewed by their project managers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views2 pages

Job Hazard Analysisb BF

This document summarizes the job hazard analysis for painting work at the Sussen Asia Pvt. Ltd. Shirtwal project. It identifies hazards for storing paints, keeping paints on site, shifting structural materials, buffing, and painting. Control measures are outlined to address fire hazards from paint storage, injury risks from material shifting, and health risks like eye injuries, dust, and smell from buffing and painting. The analysis was attended by safety personnel from Rohan abuilders and Sussen Asia and reviewed by their project managers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Rohan abuilders (India) Pvt.

Ltd
Project :-Sussen Asia Pvt.Ltd.Shirtwal
Job Hazard Analysis Sheet No. 2…... of ……1..

PROJECT / TASK: Painting CONTRACTOR: Pratibha Decoretors JOB No.:006

SUPERVISOR: Mr. N.Satisha LOCATION: Near Fabrication Yard DATE:

JOB STEP HAZARDS Control Measure ACTION


Break the job into steps. List the hazard or type of harm List the necessary control measures to be Person who will
Listing work which may be hazardous. identified with each step followed to eliminate the identified hazards ensure this
happens

Storage of paints  Fire incident at  Paints will be stored


storage area of paints separately away from the source
of heat.
Keeping paints at site  Fire incident due to  Smoking, gas cutting, welding
smoking gas cutting, etc. will not be allowed nearby
welding etc. paints. Mr. N.Satisha
 Trickling and falling of  Only trained workers will be
paints. allowed to handle paints.
Shifting Of Structural Material Falling Hazards & Hitting  All the lifting tools and tackles to
be inspected prior to use.
(Channel And Beam) Injury. Cut Injury,Triping
Hazards  Proper pathway for hydra & It will
be escorted with a signal man.

 Stacking area of Structural


Material will be properly secure &
Barricaded.

 PPE’S (Helmets , Proper Hand


Gloves, Safety Shoes.) to be
used.

 Work to be done under skilled


supervision.
Buffing  Eye Injury, Dust  provided necessary PPE’s like
allergy , Hand injury. safety goggles, hand gloves
,Nose Mask, Safety Shoes etc
 Proper Guard for moving
parts
Painting  Eye Injury, Suffocation  provided necessary PPE’s like
Due to Smell safety goggles, hand gloves
,Nose Mask, Safety Shoes etc
Job Hazard Analysis Attendees: Mr.R.Dhake,Mr.Hindole ,Mr.N. Satisha
Name Signature Date
Written by: Safety Officer RBIPL Mr. Dhake
Site Engineer: Mr.Hindole
Reviewed by: Project Manager Mr.Vinod Narkhede
RBIPL
SAPL Officer / Engineer: