Syarikat Jurukur Malaysia

Syarikat Jurukur Malaysia, a licensed land surveying firm, submitted a quotation to Dewan Bandaraya Kuala Lumpur for surveying work along Jalan Awan Besar and Taman Yarl. The quotation included 7 items with quantities and rates, totaling RM227,764.10 plus 6% government tax of RM13,665.85 for a grand total of RM241,429.95. The rates were based on the 2001 Survey Engineering Fee Schedule.

Uploaded by

PROSURVEY STUDIO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
547 views6 pages

Syarikat Jurukur Malaysia

Syarikat Jurukur Malaysia, a licensed land surveying firm, submitted a quotation to Dewan Bandaraya Kuala Lumpur for surveying work along Jalan Awan Besar and Taman Yarl. The quotation included 7 items with quantities and rates, totaling RM227,764.10 plus 6% government tax of RM13,665.85 for a grand total of RM241,429.95. The rates were based on the 2001 Survey Engineering Fee Schedule.

Uploaded by

PROSURVEY STUDIO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

SYARIKAT JURUKUR MALAYSIA

JURUKUR TANAH BERLESEN


(Chartered Licensed Land Surveyors)
No. 55-2, Jalan 3/76D, Desa Pandan, 55100 Kuala Lumpur
Tel: 03-9285 0420, 9285 5534 Fax: 03-92015832
E-mail: [email protected]

Rujukan Kami:

DEWAN BANDARAYA KUALA LUMPUR Date: 20/5/2020


Bahagian Geomatik
Jabatan Kejuruteraan Awam Dan Pengangkutan Bandar
Tingkat 17-19, Menara DBKL 1
Jalan Raja Laut
50350 Kuala Lumpur

Dear Sir,

Sebutharga Bagi Kerja Ukur Butiran Bagi Penambakan Parit Di Jalan Awan Besar & Taman Yarl
(Berdasarkan Kepada Jadual Fee Ukur Kejuruteraan 2001 (Pindaan Kepada Jadual Fee Ukur Kejuruteraan 1980))

Kadar Harga
No. Perkara Unit Kuantiti
RM RM

1 Preparatory of work Party Day 1 743.00 743.00

2 Mobilization Party Day 3 743.00 2,229.00

3 Planimetric Control and Connection M. 25000 2.50 62,500.00

4 Height Control and Connection Km 20 464.375 9,287.50

5 Monumenting Of TBM's Nos. 3 185.75 557.25

6 Spot Level ha 74 743.00 54,982.00

7 Sounding/ hyrdro km 24 2,500.00 60,000.00

8 Preparation of Digital Data 37,465.35


20% of item 3-6

Sub - Total: 227,764.10

Total : 227,764.10

6% Government service tax 13,665.85


Grand Total: 241,429.95

We look forward to your affirmative reply.

Thank you.

Yours faithfully,

NIK AHMAD AIMAN


Projek Surveyor

Note:

1) All rates are based on built up area


2) All rates are applicable based on Jadual Fee Ukur Kejuruteraan 2001
3) All charges will be based on the true survey conducted.
uteraan 1980))
SYARIKAT JURUKUR MALAYSIA
JURUKUR TANAH BERLESEN
(Chartered Licensed Land Surveyors)
No. 55-2, Jalan 3/76D, Desa Pandan, 55100 Kuala Lumpur
Tel: 03-9285 0420, 9285 5534 Fax: 03-92015832
E-mail: [email protected]

Rujukan Kami:

DEWAN BANDARAYA KUALA LUMPUR Date: 25/03/2016


Bahagian Geomatik
Jabatan Kejuruteraan Awam Dan Pengangkutan Bandar
Tingkat 17-19, Menara DBKL 1
Jalan Raja Laut
50350 Kuala Lumpur

Dear Sir,

Sebutharga Bagi Kerja Ukur Butiran Bagi Penambakan Parit Di Jalan Awan Besar & Taman Yarl
(Berdasarkan Kepada Jadual Fee Ukur Kejuruteraan 2001 (Pindaan Kepada Jadual Fee Ukur Kejuruteraan 1980))

Kadar Harga
No. Perkara Unit Kuantiti
RM RM

1 Preparatory of work Party Day 0 743.00 0.00

2 Mobilization Party Day 0 743.00 0.00

3 Planimetric Control and Connection M. 670 2.50 1,675.00

4 Height Control and Connection Km 0.67 464.375 311.13

5 Monumenting Of TBM's Nos. 0 185.75 0.00

6 Spot Level ha 2 743.00 1,486.00

7 Preparation of Digital Data 694.43


20% of item 3-6

Sub - Total: 4,166.56

Total : 4,166.56

6% Government service tax 249.99


Grand Total: 4,416.55

We look forward to your affirmative reply.

Thank you.

Yours faithfully,

NIK AHMAD AIMAN


Projek Surveyor
Note:

1) All rates are based on built up area


2) All rates are applicable based on Jadual Fee Ukur Kejuruteraan 2001
3) All charges will be based on the true survey conducted.
uteraan 1980))