SBC For Toll Plaza
SBC For Toll Plaza
SBC For Toll Plaza
Depth of Foundation 2m
Cohesion 0 t/m2
Angle of Internal friction 30 Degree
Effective unit weight 0.85 t/m3
Nc 30.14
Nq 18.4
Ny 22.4
Widht 1.5 m
Length 1.5 m
Shape factor
Sc 1.3
sq 1.2
sy 0.8
Depth factor
dc 1.46 Nф= 3
dq 1.23
dy 1.23
ic 1
iq 1
iy 1
w' 0.5
Calculation of SBC
Depth of Foundation 2m
Cohesion 0 t/m2
Angle of Internal friction 30 Degree
Effective unit weight 0.85 t/m3
Nc 30.14
Nq 18.4
Ny 22.4
Widht 4m
Length 4m
Shape factor
Sc 1.3
sq 1.2
sy 0.8
Depth factor
dc 1.17 Nф= 3
dq 1.04
dy 1.04
ic 1
iq 1
iy 1
w' 0.5
q 1.7 t/m3
Calculation of SBC
Depth of Foundation 2m
Cohesion 0 t/m2
Angle of Internal friction 21 Degree
Effective unit weight 0.85 t/m3
Nc 15.82
Nq 7.07
Ny 6.2
Widht 1.5 m
Length 1.5 m
Shape factor
Sc 1.3
sq 1.2
sy 0.8
Depth factor
dc 1.388002 Nф= 2.117051
dq 1.23094
dy 1.23094
ic 1
iq 1
iy 1
w' 0.5
Summary
Tezpur toll plaza SBC for shallow foundation
70 58.9965 50 39.51835
45
20 19.47815 25 19.75917
39.23732
44*1*(0.85+1)*4*22.4*0.5)
Depth of foundation
Avg N value below foundation(upto 2.5*B)
N corrected overburden
N corrected dilatancy
BH 1 BH 2
Depth Depth
From To N From To N
1.5 3 10 1.5 3 17
3 4.5 8 3 4.5 13
4.5 6 15 4.5 6 16
6 7.5 11 6 7.5 18
7.5 9 20 7.5 9 16
9 10.5 21 9 10.5 19
10.5 12 18 10.5 12 17
12 13.5 37 12 13.5 21
13.5 15 23 13.5 15 24
15 16.5 30 15 16.5 30
H2
N avg
13.5
10.5
15.5
14.5
18
20
17.5
29
23.5
30