0% found this document useful (0 votes)
68 views2 pages

Retaing Wall Cross Sections

The document provides information on retaining wall cross sections for different chainages along a route. It notes whether the cross section drawings were received, required to be submitted, or if block walls are present for various length segments between chainage points. It also includes remarks on the status of submissions and notes where no retaining wall was required.

Uploaded by

ruchita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

Retaing Wall Cross Sections

The document provides information on retaining wall cross sections for different chainages along a route. It notes whether the cross section drawings were received, required to be submitted, or if block walls are present for various length segments between chainage points. It also includes remarks on the status of submissions and notes where no retaining wall was required.

Uploaded by

ruchita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Retaining wall Cross Sections

Ch 15+90 to Ch 16+20 Received


Ch 16+20 to Ch 16+90 Required
Ch 16+90 to Ch 16+120 Block walls
Ch 16+120 to Ch 16+250 Received
Ch 16+250 to Ch 16+500 Required
Chainage Ground
Length Drawing by Submission
Profile Remarks
(m) RECPL by GECPL
From Site
FROM TO

Not Chainage of Cross Wall*


15.960 TO 15.975 15 Received Received
Submitted perpendicular to the alignment to
be confirmed by site
15.975 TO 16.015 40 Received Received Submitted

Not Drawings will be submitted on


16.015 TO 16.020 5 Received Received
Submitted 15.03.18

Received on Not RE wall sections received from


16.020 TO 16.060 40 Received
12.03.18 Submitted REIPL on 12.03.18. Drawings will be
submitted on 20.03.18

Received on Not RE wall sections received from


16.060 TO 16.090 30 Received
12.03.18 Submitted REIPL on 12.03.18. Drawings will be
submitted on 20.03.18
Received on
16.090 TO 16.120 30 Received Submitted
12.03.18 Concrete Blocks drwgs. Submitted

End of Concrete Block lacing & start


of Retaining wall along with
Not Chainage of Cross Wall*
16.120 TO 16.150 30 Received Received
Submitted perpendicular to the alignment to
be confirmed by site (Drawings will
be released Immediately)

Not
16.150 TO 16.160 10 Received Received
Submitted
Not Drawings will be submitted on
16.160 TO 16.220 60 Received Received
Submitted 15.03.18

Not Retaining wall Height to be


16.220 TO 16.260 40 Received Received
Submitted confirmed by Site as per Drwgs. by
REIPL
Received on
16.260 TO 16.300 40 Received - No retaining wall required
12.03.18
Received on
16.300 TO 16.380 80 Received - No retaining wall required
12.03.18
Received on
16.380 TO 16.430 50 Received - No retaining wall required
12.03.18