0% found this document useful (0 votes)
129 views2 pages

OEC One Installation Checklist

The document provides a checklist for installing the OEC One medical imaging system, including inspecting system components, setting up configurations, performing functional checks, verifying options, and documenting the installation. Fields are included to record information about the medical facility, field service engineer, system serial number and configurations, results of inspection, setup, testing and calibration. The checklist is signed by the customer and field service engineer upon completion of the installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views2 pages

OEC One Installation Checklist

The document provides a checklist for installing the OEC One medical imaging system, including inspecting system components, setting up configurations, performing functional checks, verifying options, and documenting the installation. Fields are included to record information about the medical facility, field service engineer, system serial number and configurations, results of inspection, setup, testing and calibration. The checklist is signed by the customer and field service engineer upon completion of the installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

OEC One Installation Checklist

OEC One Installation Checklist

Administrative Information
Medical Facility Information Field Service Engineer Information

Hospital or Clinic Name: FSE name:

Address: City: Employee SSO:

State: Country: Service Report Number:

Postal Code/Zip: Contact Person: Date Installation Start/Complete:

Contact Phone: Department: GE Assigned System ID:

System Configuration
System Serial Number: Host ID:
Release Version: Complete Version:

System Inspection
No Problem and Resolution Noted No Problem and Resolution Noted in
Item Item
Problem in Comments Section Problem Comments Section
Label Inspection AC Power Cord and Plug
Cable and Connector Anti-Static Drag Wires
Monitor and Arm Image Intensifier
Handles C-arc
Wheels X-ray Monoblock
Covers Control Panel
Frame Battery Pack Check

System Setup
Power Supply Adaption Power On/Off System Configuration in Administration
System Configuration in User Setup DICOM Setup and Check DICOM Worklist

Functional Check
System Movement Pass Fail System Operation Pass Fail

Mechanical Movement Pass Fail Vertical Column Operation Pass Fail

System Control Pass Fail Key Switch Pass Fail

Emergency Switch Pass Fail

Dose Limitation Check

Dose Group Normal Fluoro HLF

Normal 50 and HLF 50 Available Not Available mGy/min(≤ 47.5 mGy/min) mGy/min(≤ 47.5 mGy/min)

Normal 50 and HLF 100 Available Not Available mGy/min(≤ 47.5 mGy/min) mGy/min(≤ 95 mGy/min)

Normal 88 and HLF 100 Available Not Available mGy/min(≤ 83.6 mGy/min) mGy/min(≤ 95 mGy/min)

Beam Alignment Check Collimator Check


OEC One Installation Checklist

ABS Tracking Check Image Resolution Check


Copper Specification Measured Mag Mode Specification Measured
Filters Adjustment Adjustment
(kVp) (kVp) (Field Size) (LP/mm) (LP/mm)
(mm)
1 64±4 Yes No Need NORM (9”) ≥2.2 Yes No Need
2 74±4 Yes No Need MAG1 (6”) ≥2.8 Yes No Need
3 82±4 Yes No Need MAG2 (4.5”) ≥3.3 Yes No Need

DAP Accuracy Check


Dose Accuracy (<25%) Dose Rate Accuracy (<25%) DAP Accuracy (<25%)

Function Check for Option


Option Description Verified Not Available Option Description Verified Not Available
Tube Side Laser Aimer I.I. Side Laser Aimer
Film Cassette Holder Removable Filter
Tube Skin Spacer Removable Grid
Video Distributor Wireless Module
Wired Footswitch Wireless footswitch
Cine and DSA&Roadmap Software Options
System Setup and Config Backup (If needed)

Reporting (Where Applicable)


Reporting Complete Yes No Unique Form #

Calibrated Tools List


Tool Name Tool Number Calibration Due Date

Installation Comments

Customer Signature: Field Service Signature: Date:

You might also like