Calculator Construction Materials

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 20

3 2 1

Structure Length (f) Area Length (m)Total Volume Cement (baSand (1cbmAgreggates
C/F* 6 0.35 2.10 25.2 1.05 2.1
FTB 1F 105 0.075 32.004 2.40 28.8036 1.20015 2.4003
FTB 2F 105 0.075 32.004 2.40 28.8036 1.20015 2.4003
RTB 105 0.075 32.004 2.40 28.8036 1.20015 2.4003
Column 120 0.09 36.576 3.29 39.50208 1.64592 3.29184
Total 151.1129 6.29637 12.59274
Rounded 152 7 13
Price 215 6,500 12,500

Subtotal Cost 32,680 6,500 12,500

Mortar Cost 51,680

*Except C/F where


9 0.16 56.25 59.0625
60 3000

3.2 2.8 8.96

1.2 2.4 2.88


3.111111

Plywood 500 2300 4 4600000


2000 500 4 4000000
2000 2300 1 4600000
13200000
1200 2400 2880000 4.583333
1.4
2.1
4.2 0.7
7.7
0.092903 12.5
Wall Area (sqft) Area (sqm)
A 0.00
B 0.00
C 0.00
D 0.00
0.092903
Wall Area (sqft) Area (sqm) HB Size Cement Sand
A 80 7.43 4 5
B 0.00 4 0
C 0.00 4 0

0.3 0.027
B Class Mixture Cement (B Class) Qty of Sand
4 0.654 0.0545
5 0.931 0.0776
6 1.111 0.0926
0.02
Structure Length (f) Area Thickness Total Volu Cement (baSand (1cbm)
Wall A 10.4 0.02 0.21 2.496 0.208

You might also like