Primary Sedimentation Tank: 42 M 14 M 14 M 5m

This document provides design parameters for primary sedimentation tanks and conventional activated sludge systems. For primary sedimentation tanks, the key parameters are a detention time greater than 2 hours, a surface overflow rate less than 45 cubic meters per square meter per day, and a weir loading rate less than 150 cubic meters per meter per day. Tank dimensions should have a water depth greater than 3 meters and a floor slope of 1:12. For conventional activated sludge systems, important design considerations include an organic loading rate of 0.25-0.5 kilograms of biochemical oxygen demand per kilogram of mixed liquor suspended solids per day, a hydraulic retention time of 6-16 hours, an oxygen requirement of

Uploaded by

Muhd Khusaizam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views2 pages

Primary Sedimentation Tank: 42 M 14 M 14 M 5m

This document provides design parameters for primary sedimentation tanks and conventional activated sludge systems. For primary sedimentation tanks, the key parameters are a detention time greater than 2 hours, a surface overflow rate less than 45 cubic meters per square meter per day, and a weir loading rate less than 150 cubic meters per meter per day. Tank dimensions should have a water depth greater than 3 meters and a floor slope of 1:12. For conventional activated sludge systems, important design considerations include an organic loading rate of 0.25-0.5 kilograms of biochemical oxygen demand per kilogram of mixed liquor suspended solids per day, a hydraulic retention time of 6-16 hours, an oxygen requirement of

Uploaded by

Muhd Khusaizam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Primary sedimentation tank

A 9m B

5m

D
E C

0.75

Conventional activated sludge system


1
F

42
m

As
14
m
14
5m m
Ap
Table 4.18 Design parameters for primary sedimentation (MSIG, Volume 4,2009)

Description Unit Design criteria


Detention time at hr >2
Qpak=(V/Qpeak)
Surface Overflow Rate (SOR) at M3/M2.day <45
Qpeak circular or rectangular
(maximum)=(Qpeak/top surface
area)
Weir*loading Rate (WLR) at M3/M.day <150
Qpeak (Qpeak/length of weir)
Horizontal or upward flow rate Mm/s <5*
at Qpeak (Qpeak/approaching
surface area)
Sizing of circular tanks
Water depth m >3.0
Floor slope wall 1:12(8.33)
Diameter m <50
Perimeter walk away if >50

Table5.2 Design parameters for conventional activated sludge system (MSIG, Volume )

Description Unit Design criteria


Organic loading (F/M ratio) Kg BOD/ kg MLSS.day 0.25-0.50
Hydraulic retention time (HRT)2 hrs 6-16 (for system where only
ammonia removal is required)
Oxygen requirements (for BOD KgO2/kg substrate 2.0
and ammonia nitrogen removal)
Mixed liquor suspended Mg/L 1500-3000
Solids (MLSS) Typical:2500
Sludge age day 5-10
QRAS/QIN ratio (R)* conventional activated sludge 0.25-0.5
Tank dimention
Water depth m 3-5
Length 3:1