Control Plan: OAL-CE-F-008 RLY Raebareli

This document provides a control plan for welding the roof of an AC-3T vehicle at Omax Auto Ltd. in Raebareli. It outlines six key measurement processes to inspect length, width, overlap, fillet size, weld defects, and lack of fusion. Process controls include fixture settings, inspection checksheets, and stopping production if issues are found. Quality checks are performed every shift and 100% inspection is required to meet specifications and tolerances for a quality roof assembly.

Uploaded by

vaibhav dwivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views1 page

Control Plan: OAL-CE-F-008 RLY Raebareli

This document provides a control plan for welding the roof of an AC-3T vehicle at Omax Auto Ltd. in Raebareli. It outlines six key measurement processes to inspect length, width, overlap, fillet size, weld defects, and lack of fusion. Process controls include fixture settings, inspection checksheets, and stopping production if issues are found. Quality checks are performed every shift and 100% inspection is required to meet specifications and tolerances for a quality roof assembly.

Uploaded by

vaibhav dwivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RLY Raebareli Control Plan OAL-CE-F-008

Prototype Pre-Launch Production


A. General Details

Part Description: Roof Complete AC-3T Customer: MCF Doc. No.: CP-LE16100 Q Quality Engineer
Part No.: LE16100 Rev.: f Key Contact: Mr. RBN Date Original: 30-Aug-20 S Store Incharge
Legends
Model Description: LWACCN Core Team: UU,AK,RM Rev. Date Rev: P Prod. Supervisor
Supplier Plant: Omax Auto Ltd., Raebareli Supplier Code: XXXX Customer Approval Date: O Operator

B. Process Details

Process Methods
Process / Mfg. Aids Characteristics Spl.
/ Sample Control Poka Reaction Corrective
Operation (Equipment, Char. Specification Measuring Resp.
OPN. Method Yoke Plan Action
Description FTG) SI Product Process Class & Tolerance Method Size Frequency
No
- Fixture Controlled
FOP Stop the line & get
1 Length x 2 SC 17140 ± 2 mm Measuring Tape n=1 - FOP Checksheet N Q
Each Shift Corrected
OAL-XXXX-XX
- Fixture Controlled
FOP Stop the line & get
2 Width SC 3010 ± 6 mm Measuring Tape n=1 - FOP Checksheet N Q
Each Shift Corrected
OAL-XXXX-XX
- Fixture Controlled
FOP Stop the line & get
3 Overlap 15 ± 1 mm DVC n=1 - FOP Checksheet N Q
Each Shift Corrected
OAL-XXXX-XX
- Fixture Controlled
FOP Stop the line & get
4 Overlap 20 ± 1 mm DVC n=1 - FOP Checksheet N Q
Each Shift Corrected
OAL-XXXX-XX
Fillet Size -a1 Inforrm to Production
5 SC 1 mm Fillet Gauge 100% Every Part 100 % Inspection N O
(Typ) Supervisor Immediately
Weld Defects
-Robotic MIG Welding
(Blow Holes,
M/c Inforrm to Production
6 Undercut, Crack, SC Not Allowed Visual & DPT 100% Every Part 100 % Inspection N O
Supervisor Immediately
Surface
-Welding Fixture Imperfections)
Welding of Roof
10 Process
Sheeting Top Side > 10% of Sheet
-MIG Welding M/c 7 Lack of Fusion MPT n=1 Validation Process Validation Plan N Q Inform to QA Head
Thickness
(400 Amp) /Annual
Process Parameter
8 Current 19 Amp (Max) Control Panel n=1 Every Shift N Q & P Reset Process Parameters
Checksheet OAL-XXXX-X
Process Parameter
9 Voltage 90~120 Volt Control Panel n=1 Every Shift N Q & P Reset Process Parameters
Checksheet OAL-XXXX-X
Process Parameter
10 Gas Flow Rate 8~10 LPM Gas Flow Meter n=1 Every Shift N Q & P Reset Process Parameters
Checksheet OAL-XXXX-X
IS Incoming Inspection Reject the Lot & Return to
11 Filler Wire Size Ø 0.8 mm DVC Every Lot N Q
2500 Standard Supplier
IS Incoming Inspection Reject the Lot & Return to
12 Filler Wire Grade SS 308L Wire MTC Every Lot N Q
2500 Standard Supplier
SOP for Start-up
13 Type of Polority DCEP Visual n=1 Every Shift N P Reset Process Paramter
OAL-XXX-XXX
Process Parameter
14 Wire Feed Speed 300~600 mm/min Control Panel n=1 Every Shift N P Reset Process Paramter
Checksheet OAL-XXXX-X
90% Ar + 5% O2 + Tri-Mixture Control
15 Gas Composition n=1 Every Year Supplier Test Reports N Q Inform to QA Head
5% Co2 Panel

Prepared By: AK Sign Off (Core Team): UU,AK,RM

Rev. No. Description of Changes Rev. Date Rev. No. Description of Changes Rev. Date
Format Document
00 Initial Release 05-Sep-20 00 Initial Release 05-Sep-20
Revision Revision
History History

Page 1 of 1