• 2. Advisory Rules -
• characterized by the use of the word “SHOULD”
or are stated as recommendations of that which
is advised but not required.
1.5 Objectives of the PEC
• a) Safe Use of Electricity- to establish basic
materials quality and electrical work standards
for the safe use of electricity for light, heat,
power, communications, signaling and for other
purposes.
• b) Adequacy - Strict compliance with the
provisions of the PEC will ensure safety in
electrical installations and construction, but not
necessarily efficient, convenient, or adequate
for good service or for future expansion of
electrical use.
1.6 Republic Act 7920
• The use of the PEC is mandated by the R.A. 7920,
(formerly the R.A. 184 which was enacted in 1947). The
R.A. 7920 (which repealed R.A. 184 in 1995) is also
known as the New Electrical Engineering Law.
• R.A. 7920 - is an act providing for a more responsive
and comprehensive regulation for the practice, licensing,
and registration of electrical engineers and electricians.
• Likewise, referral codes are also used which are
mandated by their corresponding laws.
• 1. P.D. 1096 - National Building Code of the Philippines
• 2. R.A. 9514 – New Fire Code of the Philippines (2008)
• 3. National Structural Code of the Philippines (2010)
1.7 Government Authorities which
Implement the PEC
Example: GFCIs
1. Bathrooms
2. Garages
3. Outdoors
4. Crawl spaces at or
below grade level
5. Unfinished basements
6. Kitchens for
countertop appliances
7. Wet bar sink
1.11.4 Why do Code Rules Change?
– New Methods or Techniques
Grid-tie Solar Power Systems
1.12 Type of Changes
• 1.New Definitions
• 2.New Provisions
• 3.Revision
• 4.Relocated
• 5.Reorganization
• 6.Universal Change
• 7.Deletion (310.5)
1.12.1 New Definitions
2.10.1.8(b)(2) – GFCI
Protection Other than
Dwelling.
Commercial and
• Relocated
37.5Kva X 1000 va
Ipri = ________________ = 81.52 Amps.
460 V
37.5Kva X 1000 va
Isec = ________________ = 163.04 Amps.
230 V
2.6 Sample Calculations-4
Compute for the corresponding full-load currents on the high
tension side and low tension side of a 500 Kva 34,500 volts
primary delta-connected; 400/230 volts secondary wye-
connected 3-phase power transformer.
800 Kw X 1000 w
I = _____________________ = 1,255.14 Amps.
1.732 x 460 V x 0.8PF
If the rating of the diesel generator set is given in KVA, e.g., 1250 KVA
460 volts 3-phase 60 Hertz.
25 32 65
3.6 HV Angle Pull Box Sizing
HV Angle Pull Box Computations:
For 3-60mm2 copper
36Kv XLPE power cable Minimum bending radius, r
in 1-110mm PVC conduit = 36 x HV cable diameter
= 36 x 25mm + 110 + 110 =
L1 1120mm
Depth = 1000mm minimum below
110 finish grade
r L2
Use: 1150mm x 1150mm x
1200mm deep HV pull box
Note: These are inside dimensions
110
4.0 Branch Circuits
4.01 BASIC RULES ON BRANCH
CIRCUITS
• NO BRANCH CIRCUIT SHALL BE LOADED IN EXCESS OF
80% OF ITS AMPACITY.
• EXAMPLE 1 FOR A 20-AMPERE CIRCUIT:
• IF THE COMPUTED LOAD CURRENT OF A BRANCH
CIRCUIT IS 16.8 AMPERES, THEN THE NEXT LARGER SIZE
OF WIRE MUST BE USED, EX. 30-AMPERE
• EXAMPLE 2 FOR A 30-AMPERE BRANCH CIRCUIT: THE
MAXIMUM LOAD IS 24 AMPERES..
• EXAMPLE 3 FOR A 15-AMPERE CIRCUIT: THE MAXIMUM
LOAD IS 12 AMPERES..
• EXAMPLE 2 FOR A 40-AMPERE BRANCH CIRCUIT: THE
MAXIMUM LOAD IS 32 AMPERES..
Table 2.20.2.3
PEC 2009, Table 2.20.2.3
general lighting loads by
occupancy.
*For Hospitals,
*For Warehouses…
10.4 Recommended Demand Factors-
1
Demand Factors For Industrial Loads
by the Number of Motors
MDP
• Ipri = 64.9kVA / 1.732/ 0.24kV = 156.13A
• Use: 175AT/225AF 3P 240V MCCB
11.3 Design the Substation
Transformer & Protections for this..
Power Supply Main feeder w/ a demand
400/230V, 3Ph, load of 690Kva with unity
4-Wire + G diversity
Insulated Cable
12.3 TYP. LIGHTNING PROTECTION
SYSTEM FOR AN INDUSTRIAL AREA
Rop Rop
APPENDIX-1
REFERENCE TABLES, & MORE SAMPLE LOAD
CALCULATIONS
14.02 PEC-1
ALLOWABLE
AMPACITIES
OF INSULATED
WIRES,
60º C TO 90ºC,
NOT MORE
THAN 3 WIRES
IN CONDUIT,
AMBIENT
TEMP. OF 30ºC
14.03 PEC-1
For Optional
Calculations –
Demand
Factors for 3
or more
Multifamily
Dwellings
14.2 SMALL POWER LOADS
(CONVENIENCE OUTLETS) - 1
• DEPENDING ON THE LAYOUT PLAN, CONVENIENCE OUTLETS SHOULD
BE SPACED AT A MAXIMUM OF 2.4 METERS. THE PEC SPECIFIES 180
VOLT-AMPERE LOAD RATING PER OUTLET.
• EXAMPLE 1: A 12M X 8M OFFICE AREA, THE MAX. NUMBER OF COs
IS,
• = (12M + 8M) 2 / 2.4M = 16.6, SAY 17 Cos, DUPLEX
• THE TOTAL CO VA LOAD IS,
• VA = 17 DUPLEX COs X 180VA X 2 = 6,120 VA
• THE TOTAL LOAD CURRENT IS,
• I = 6120VA / 230 VOLTS = 26.7 AMPERES
• NO. OF CO CIRCUITS = 26.7 / 16 = 1.67, SAY 2 CIRCUITS
• USE 2 CO BRANCH CIRCUITS W/ A 20-AMPERE RATING PER CIRCUIT, 1
CO CIRCUIT WILL HAVE 8 COs AND THE OTHER CIRCUIT WILL HAVE 9
Cos, FOR THE 17 TOTAL COs..
14.9.6 SIZING THE STANDBY POWER
• The total connected load is
• = 139.35 kVA total conn. load
• The calculated Demand Load is
• kVA = 55.74 kVA
• Assuming a 100% emergency power back up
• Genset kW = 55.74 x 0.80 pf = 44.6 kW demand
• Assuming a maximum loading of 70%
• The kW capacity of the generator = 44.6 / 0.70 = 63.7 kW
• Use: 75 kW 230 volts 3-phase 60 Hertz 1800 RPM diesel engine
generator set complete with accessories, i.e. starting battery,
fuel day tank, exhaust silencer, metering, manual or automatic
transfer switch, etc.
•
14.9.7 SIZING THE SOLAR POWER
• Assume an available roof area of 30 mtrs by 20 mtrs, and about 205
of the area to be allotted for anchoring the panels and for
maintenance access,
• The number of 250 watts solar panels is,
• = 20 x 30 x 80% / 1.6m x 1.0m
• = 300 panels
• The Total kW capacity of the Solar Power Supply system is,
• = 300 panels x 250 watts / 1000
• = 75 kW maximum possible
• Use: 6 each 12kW grid tie inverters (to be connected 4 x 6kW
inverters per phase) 240 volts DC input, 220 volts AC 1-phase, pure
sine wave output.
• Note: Option to arrange a net metering agreement with the Utility
company. Any extra energy generated during day time will be
THANK YOU & GOD BLESS!