Overview: This document provides the test procedures for performing the
following tasks:
Test Set-up
1. When the unit boots up one should be on the
main screen. Select Electrical Ethernet
(button 1) to test electrical cables, select
Optical Ethernet to test Optical Links. For
this procedure we will follow Electrical
Ethernet testing.
3
Test 3: RFC 2544 Test
Summary
The last step in the turn up process is to actually run the RFC 2544 test. The purpose of
this final test is to measure the latency, throughput, and frame loss of the link. At the end
of this test the results are automatically saved and the determination of whether the link