Kafalkada Pipe Design Scheme 1
Kafalkada Pipe Design Scheme 1
Kafalkada Pipe Design Scheme 1
View
View Pipe
Pipe Data
Data
Pipe Database Updated as per Nepal Standard For PN100 Pipe Series.
Last Updated : 2019/12/01
If any issue please contact at [email protected]
Annex - I
DATA INPUT FORM
Spread Sheets Developed by SOFTWEL (P) Ltd.
Organization Government
Scheme Code
Scheme Name kafalkada
Name of the Community kada
Name of the Support Organization province Government
Location : Ward No.: 6
VDC : Sigas RM
District : Baitadi
Baitadi
Description of Tap Population forecast Institutional Water Demand Total Tap Flow Calculation
Tap Cluster Name Ward Nos Present YearBase Year Design Year Total No. of Other Total Live Water Average Peak Peak Design Adjusted Remarks
No or No. of 2019 2022 2042 Domestic Pupil in Institutional Institutional Stock Demand Tap Flow Factor Flow flow Peak
Locality HH (P) (Po) (Pn) Demand School Demand Demand Demand factor
(Nos) (Nos) P(1+r)^n1 P(l+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [2-1] [3] [4] [5] [6] [8] [9] [10] [11] [11-1] [12] [13] [14] [15] [16] [17] [18]
RVT1
1 Gaira 6 5 30 32 41 1,845 1,845 0.02 5.00 0.11 0.11 5.00
2 pelchiura 6 7 42 44 58 2,610 2,610 0.03 5.00 0.15 0.15 5.00
3 Sunkuda 6 15 90 94 123 5,535 5,535 0.06 5.00 0.32 0.32 5.00
4 dhalkana 6 4 24 25 33 1,485 1,485 0.02 5.00 0.09 0.09 5.00
5 kada gaun 6 20 120 125 164 7,380 7,380 0.09 5.00 0.43 0.43 5.00
6 Veradhar 6 4 24 25 33 1,485 1,485 0.02 5.00 0.09 0.09 5.00
7 Veradhar 2 6 2 12 13 17 765 765 0.01 5.00 0.05 0.05 5.56
8 Punadhar 6 9 54 57 74 3,330 3,330 0.04 5.00 0.20 0.20 5.00
9 healthpost tole 6 4 24 25 33 1,485 300 500 3,500 4,985 0.06 5.00 0.29 0.29 5.00
sub total 70 420 440 576 25,920 300 500 3,500 - 29,420 0.34 1.70 1.71
RVT2
Grand Total 91 559 586 766 34470 300 500 3500 37970 0.44 2.20 2.20 0.00
NOTE : 1 Peak factor of 3 has been adopted
2 Design Tap Flow has been adjusted for the Peak flow by rounding off to nearest 0.01lps.
3 If flow is less than 0.05 lps then it has been adjusted to 0.05 lps and if flow is greater than 0.25 lps provide additional tapstand.
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi
a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 70
a.3 Average Design Demand to be Supplied through Reservoir 0.341 l/s = 29420.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.500 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 0.400 l/s = 34560.0 l/day
a.6 Total Design Flows of all Standposts : 1.705 l/s
c) Reservoir sizing assuming Intermittent System (Optional)
Maximum Required supply hours based on Supply from Source 5.63 hours
Maximum Required supply hours based on Demand 4.79 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM
Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi
a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir 0.341 l/s = 29420.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : 1.705 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns
35000
30000
25000
20000
15000
10000
5000
0
09:36 AM
02:24 PM
09:36 AM
12:00 AM
04:48 AM
07:12 PM
12:00 AM
04:48 AM
Supply Demand
Maximum Required supply hours based on Supply from Source 3.52 hours
Maximum Required supply hours based on Demand 4.79 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM
Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi
a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 21
a.3 Average Design Demand to be Supplied through Reservoir 0.099 l/s = 8550.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.200 l/s
a.5 Adjusted/Optimized supply to Reservoir from Source 0.100 l/s = 8640.0 l/day
a.6 Total Design Flows of all Standposts : 0.495 l/s
c) Reservoir sizing assuming Intermittent System (Optional)
Maximum Required supply hours based on Supply from Source 4.85 hours
Maximum Required supply hours based on Demand 4.80 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM
Recommended Size for RVT 01 = 4.00 cum Time to Fill the RVT 11.11 Hr
PIPELINE DESIGN Sheet No. : 8 of 16
(HYDRAULIC CALCULATIONS)
Pipe Class abbreviation HC Soil Code GMS OS
MC (Ctrl+a for using solver) HR BMS
SCHEME NAME : kada SOURCE NAME : Kafal SAFE YEILD : 0.50 DI Run
Run Macro
Macro HereHere
SR MR
LOCATION : WARD NO : VDC : DISTRICT : CI Ctrl
Ctrl ++ ee HS SS
HS Steel
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. PIPE USED Friction Head Residual Flow Hydraulic Gradient L Soil
(UL/UR
No. Dis. / Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm)(kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
Intake to DC
1 IN p1 650 715 0.500 DR 1944.00 1918.00 26.00 1944.00 26.00 26.00 50 6.0 44.90 0.0335 2.78 23.22 0.32 1944.00 1941.22 BMS
2 p1 p2 445 489.5 0.500 DR 1918.00 1863.00 55.00 1944.00 78.22 81.00 50 10.0 42.00 0.0334 2.57 75.65 0.36 1941.22 1938.65 BMS
3 p2 3 600 660 0.500 DR 1863.00 1795.00 68.00 1944.00 143.65 149.00 50 16.0 37.80 0.0331 5.96 137.69 0.45 1938.65 1932.69 BMS
4 P3 DC 300 330 0.500 DR 1795.00 1784.00 11.00 1944.00 148.69 160.00 50 16.0 37.80 0.0331 2.98 145.71 0.45 1932.69 1929.71 BMS
DC to RVT 1
1 DC P4 300 330 0.400 DR 1784.00 1770.00 14.00 1784.00 14.00 14.00 50 10.0 42.00 0.0348 1.17 12.83 0.29 1784.00 1782.83 BMS
2 P4 RVT1 360 396 0.400 DR 1770.00 1755.00 15.00 1784.00 27.83 29.00 40 10.0 33.50 0.0342 4.18 23.65 0.45 1782.83 1778.65 BMS
DC to RVT 2
1 DC P5 400 440 0.100 D 1784.00 1720.00 64.00 1784.00 64.00 64.00 25 16.0 18.70 0.0427 6.64 57.36 0.36 1784.00 1777.36 BMS
2 P5 RVT2 400 440 0.100 D 1720.00 1660.00 60.00 1784.00 117.36 124.00 25 16.0 18.70 0.0427 6.64 110.72 0.36 1777.36 1770.72 BMS
RVT1 to Dhalkana (P8)
1 RVT1 P6 300 330 0.560 D 1755.00 1700.00 55.00 1755.00 55.00 55.00 50 6.0 44.90 0.0329 1.51 53.49 0.35 1755.00 1753.49 BMS
2 P6 P7 150 165 0.410 DL 1700.00 1640.00 60.00 1755.00 113.49 115.00 50 16.0 37.80 0.0342 1.04 112.45 0.37 1753.49 1752.45 BMS
3 P7 P8 200 220 0.090 D 1640.00 1600.00 40.00 1755.00 152.45 155.00 25 16.0 18.70 0.0435 2.84 149.61 0.33 1752.45 1749.61 BMS
RVT1 to Gaira (P9)
1 RVT1 P9 150 165 0.110 DL 1755.00 1700.00 55.00 1755.00 55.00 55.00 25 16.0 18.70 0.0418 3.01 51.99 0.40 1755.00 1751.99 BMS
RVT1 to J1 BMS
1 RVT1 J1 20 22 1.060 DR 1755.00 1745.00 10.00 1755.00 10.00 10.00 63 6.0 56.70 0.0298 0.10 9.90 0.42 1755.00 1754.90 BMS
J1 to P12
1 J1 P9 160 176 0.570 D 1745.00 1690.00 55.00 1755.00 64.90 65.00 50 10.0 42.00 0.0326 1.17 63.73 0.41 1754.90 1753.73 BMS
2 P9 P10 100 110 0.570 D 1690.00 1660.00 30.00 1755.00 93.73 95.00 50 10.0 42.00 0.0326 0.73 93.00 0.41 1753.73 1753.00 BMS
3 P10 BPT1 100 110 0.140 D 1660.00 1600.00 60.00 1755.00 153.00 155.00 25 16.0 18.70 0.0400 3.12 149.88 0.51 1753.00 1749.88 BMS
4 BPT1 P11 150 165 0.140 D 1600.00 1570.00 30.00 1600.00 30.00 30.00 25 16.0 18.70 0.0400 4.68 25.32 0.51 1600.00 1595.32 BMS
5 P11 P12 160 176 0.050 D 1570.00 1500.00 70.00 1600.00 95.32 100.00 20 16.0 14.90 0.0482 2.44 92.88 0.29 1595.32 1592.88 BMS
J1 to P14
1 J1 P13 200 220 0.490 DR 1745.00 1690.00 55.00 1755.00 64.90 65.00 40 10.0 33.50 0.0330 3.47 61.43 0.56 1754.90 1751.43 BMS
2 P13 P14 100 110 0.290 DR 1690.00 1655.00 35.00 1755.00 96.43 100.00 32 10.0 26.70 0.0357 2.03 94.40 0.52 1751.43 1749.40 BMS
RVT2 to J2
PIPELINE DESIGN Sheet No. : 9 of 16
(HYDRAULIC CALCULATIONS)
Pipe Class abbreviation HC Soil Code GMS OS
MC (Ctrl+a for using solver) HR BMS
SCHEME NAME : kada SOURCE NAME : Kafal SAFE YEILD : 0.50 DI Run
Run Macro
Macro HereHere
SR MR
LOCATION : WARD NO : VDC : DISTRICT : CI Ctrl
Ctrl ++ ee HS SS
HS Steel
S. Pipe Line Length Design Direction Reduced Level Level New Total Max. PIPE USED Friction Head Residual Flow Hydraulic Gradient L Soil
(UL/UR
No. Dis. / Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm)(kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
1 RVT2 J2 30 33 0.550 D 1660.00 1640.00 20.00 1660.00 20.00 20.00 50 6.0 44.90 0.0329 0.15 19.85 0.35 1660.00 1659.85 BMS
J2 to P15
1 J2 P15 300 330 0.090 DR 1640.00 1600.00 40.00 1660.00 59.85 60.00 25 16.0 18.70 0.0435 4.26 55.59 0.33 1659.85 1655.59 BMS
J2 to P17
1 J2 P16 300 330 0.360 DL 1640.00 1600.00 40.00 1660.00 59.85 60.00 40 10.0 33.50 0.0348 2.94 56.91 0.41 1659.85 1656.91 BMS
2 P16 P17 400 440 0.230 DL 1600.00 1570.00 30.00 1660.00 86.91 90.00 32 10.0 26.70 0.0373 5.26 81.65 0.41 1656.91 1651.65 BMS
Pipe Line Estimate
Transmission Distribution Length
CODE Type Nominal Dia/Outer Dia Class ND Code SD Code PipeCode Transmission Distribution
GP-1 G.I. Pipe 1/2" - 15mm 15-MC-TL 15-MC-DL GPM-15 - -
GP-2 G.I. Pipe 3/4" - 20mm 20-MC-TL 20-MC-DL GPM-20 - -
GP-3 G.I. Pipe 1" - 25mm 25-MC-TL 25-MC-DL GPM-25 - -
GP-4 G.I. Pipe 1-1/4" - 32mm 32-MC-TL 32-MC-DL GPM-32 - -
GP-5 G.I. Pipe 1-1/2" - 40mm 40-MC-TL 40-MC-DL GPM-40 - -
GP-6 G.I. Pipe 2" - 50mm 50-MC-TL 50-MC-DL GPM-50 - -
GP-7 G.I. Pipe 2-1/4" - 65mm 65-MC-TL 65-MC-DL GPM-63 - -
GP-8 G.I. Pipe 3" - 80mm 80-MC-TL 80-MC-DL GPM-80 - -
GP-9 G.I. Pipe 3-1/2" - 100mm 100-MC-TL 100-MC-DL GPM-100 - -
GP-10 G.I. Pipe 1/2" - 15mm 15-HC-TL 15-HC-DL GPH-15 - -
GP-11 G.I. Pipe 3/4" - 20mm 20-HC-TL 20-HC-DL GPH-20 - -
GP-12 G.I. Pipe 1" - 25mm 25-HC-TL 25-HC-DL GPH-25 - -
GP-13 G.I. Pipe 1-1/4" - 32mm 32-HC-TL 32-HC-DL GPH-32 - -
GP-14 G.I. Pipe 1-1/2" - 40mm 40-HC-TL 40-HC-DL GPH-40 - -
GP-15 G.I. Pipe 2" - 50mm 50-HC-TL 50-HC-DL GPH-50 - -
GP-16 G.I. Pipe 2-1/4" - 65mm 65-HC-TL 65-HC-DL GPH-63 - -
GP-17 G.I. Pipe 3" - 80mm 80-HC-TL 80-HC-DL GPH-80 - -
GP-18 G.I. Pipe 3-1/2" - 100mm 100-HC-TL 100-HC-DL GPH-100 - -
CBWSS
VDC
8 5, 6 5, 6, 8, 9
Scheme - 3 Scheme - 4 Total
Indredanda Extention of
Rehabilitation Sallikot Scheme
68 84 234
381 471 1313
69 85 236
394 489 1361
95 117 326
533 659 1838
15 15 65
2 2 7
Mangrakhola Mangrakhola
Stream / 2 Stream / 1
- - 0
0.2 ( Lamakhola ) 0.20
1 1 4
Good Good Good
2 1 6
4 2 9
6 6 29
No No No
12 m³ x 1 14 m³ x 1 5
7.00 9.00 26
2.00 2.00 9
1 1 2