FACADE Tracker 2
FACADE Tracker 2
2409 841
2233 1017 Mullion Alignment and EPDM installation in progress
1441 2009
1441 2009 9
600 133 Removed Entrance 1 right side wall Stone As per the Architect
Details and instruction given by Mirani Sir. Even Details for B3 -
500 258 B4 Stone Clading is not clear need to confm by Architect End
500 283 as Discusses with Wahid Sir.
400 483 23
0 883
0 550
0 550
0 550
0 550
0 482
0 482
0 482
0 482
0 482
227 0
0 227
0 227
0 227
0 227
0 497
0 497
0 497
0 497
0 192
0 192
0 192
0 192
0 192
0 318
0 318
0 318
0 318
0 318
0 540
0 540
0 540
0 540
0 540
0 193
0 193
0 193
0 193
0 193
ople for Material Shifting
240