0% found this document useful (0 votes)
93 views5 pages

FACADE Tracker 2

The document is a daily report summarizing the status of facade work for different areas as of March 17, 2011. It outlines the balance and progress of glazing, ACP cladding, and stone cladding work for areas A3, A2, B3, and the courtyard. Some tasks like canopy work and logo installation are on hold pending details, while other areas need clarification on stone cladding details from the architect. Grid removal is in progress to allow for concrete work.

Uploaded by

swami22
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views5 pages

FACADE Tracker 2

The document is a daily report summarizing the status of facade work for different areas as of March 17, 2011. It outlines the balance and progress of glazing, ACP cladding, and stone cladding work for areas A3, A2, B3, and the courtyard. Some tasks like canopy work and logo installation are on hold pending details, while other areas need clarification on stone cladding details from the architect. Grid removal is in progress to allow for concrete work.

Uploaded by

swami22
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Daily Report Date: 17th Mar 2011

Sr.No Work Type Balance as of


Unit
5 Façade (A3 Area) 8-Oct 2011
1 Façade Glazing sqmtr 3450
a Mullion Cliting 3450
b Mullion & TransomFraming 3450
c Glass Installation 3450
d Silicone 3450

2 ACP Clading sqmtr 3172


b Alluminium Framing 3172
c ACP Pannel Fabrication 3172
d ACP Pannel Fixing 3172
e Silicone 3172

3 Stone Clading sqmtr 883


a MS Framing 883
b Stone Sloting 883
c Stone Fixing 883
d Stone Alignment 883
e Silicone 883
6 Façade (A2 Area)
1 Façade Glazing sqmtr 550
a Mullion Cliting 550
b Mullion & TransomFraming 550
c Glass Installation 550
d Silicone 550

2 ACP Clading sqmtr 482


a MS Framing 482
b Alluminium Framing 482
c ACP Pannel Fabrication 482
d ACP Pannel Fixing 482
e Silicone 482

3 Stone Clading sqmtr 227


a MS Framing 227
b Stone Sloting 227
c Stone Fixing 227
d Stone Alignment 227
e Silicone 227
7 Façade (B3 Area)
1 Façade Glazing sqmtr 497
a Mullion Cliting 497
b Mullion & TransomFraming 497
c Glass Installation 497
d Silicone 497

ACP Clading sqmtr 192


a MS Framing 192
b Alluminium Framing 192
c ACP Pannel Fabrication 192
d ACP Pannel Fixing 192
e Silicone 192

3 Stone Clading sqmtr 318


a MS Framing 318
b Stone Sloting 318
c Stone Fixing 318
d Stone Alignment 318
e Silicone 318

8 Façade (Courtyard Area)


1 Façade Glazing sqmtr 1146
a Mullion Cliting 1146
b Mullion & TransomFraming 1146
c Glass Installation 1146
d Silicone 1146

2 ACP Clading sqmtr 540


a MS Framing 540
b Alluminium Framing 540
c ACP Pannel Fabrication 540
d ACP Pannel Fixing 540
e Silicone 540

3 Stone Clading sqmtr 193


a MS Framing 193
b Stone Sloting 193
c Stone Fixing 193
d Stone Alignment 193
e Silicone 193
Note: Total Manpower At site 40 including 4 people for Material Shifting
Achieved as of Balance as of Manpower Remarks
17-Mar 2011 17-Mar 2011

2409 841
2233 1017 Mullion Alignment and EPDM installation in progress
1441 2009
1441 2009 9

690 2482 Canopy is on hold as my Hframe is coming in between the


690 2482 grids. Marketcity Logo ACP Hold AS DETAILS NOT YET RECEIVED
690 2482 by Mirani Sir.
670 2502

600 133 Removed Entrance 1 right side wall Stone As per the Architect
Details and instruction given by Mirani Sir. Even Details for B3 -
500 258 B4 Stone Clading is not clear need to confm by Architect End
500 283 as Discusses with Wahid Sir.
400 483 23
0 883

0 550
0 550
0 550
0 550

0 482
0 482
0 482
0 482
0 482

227 0
0 227
0 227
0 227
0 227
0 497
0 497
0 497
0 497

0 192
0 192
0 192
0 192
0 192

0 318
0 318
0 318
0 318
0 318

Grid b25 - B38 Upper Ground courtyard Framing removing in


503 643 progress as per the instruction given by Wahid Sir for Concrete
503 643 Work Purpose. Even Grid M8 M17 Survey details discussed
285 861 11 with wahid Sir and informed the work pending in those area
which need to be done so that we can carry out work as per
0 1146 the given schedule.

0 540
0 540
0 540
0 540
0 540

0 193
0 193
0 193
0 193
0 193
ople for Material Shifting
240