QUOTATION
NS INTERIORS
Mob: 9718116330
CLIENT DETAILS: QUOTE - 2019-20.
M/S DATE: - 29/09/2019
QUOTATION FOR INTERIOR RENOVATION WORKS
UNIT RATE AMOUNT
S.NO. DESCRIPTION OF WORK QTY
(varies) IN Rs. IN Rs.
KITCHEN WOOD WORKS PROVIDING AND FIXING OF KITCHEN
WOODEN WORK MADE OUT WITH 19MM COMMERCIAL BOARD WITH 6MM AND
12MM BACK PLY IN SIDE LAMINATE 0.8MM THIK OUT SIDE LAMINATE AND 1MM
1 THIK OUTSIDE WITH BASKET, ALL HINGES SOFT CLOSED, EDGE BENDING TAPE SQFT
MAKE REHAU WITH HANDLE WITH GRANIT TOP FINISH AS PER APPROVAL
(BOARD MAKE CENTURY, LAMINAT MAKE MARINO FITTING MAKE HETTACH
INCLUDING ARCHITECT CHANNNEL AND TENDUM BASKET)
20-0x3-0 SQFT 60 -
19-6x4-6 SQFT 87.75 -
147.75 2,500.00 3,69,375.00
C.B. WORK (Almirah) PROVIDING AND FIXING OF CB WORK WOODEN
WORK MADEOUT WITH 19MM COMMERCIAL BOARD WITH 6MM AND 12MM BACK
2 PLY IN SIDE LAMINATE 0.8MM THIK OUT SIDE LAMINATE AND 1MM THIK SQFT
((MAKE CENTURY PLY) ALL HINGES SOFT CLOSED (MAKE HETTICH), EDGE
BENDING TAPE MAKE REHAU WITH HANDLE.
MASTER BED ROOM = 5-6X8-0 SQFT 44.00 -
MASTER BED ROOM = 3-0X7-0 SQFT 21.00 -
KIDS ROOM = 5-6X8-0 SQFT 44.00 -
SERVENT ROOM = 3-6X9-0 SQFT 31.50
GUEST ROOM = 4-0X8-0 SQFT 32.00 -
172.50 1,600.00 2,76,000.00
PLASTER WORK - ALL BATHROOM KITCHEN SERVENT BATHROOM INCLUDING
3 CEMENT MORTAR WITH BADARPUR, DUST INCLUDING LABOUR COMPLETE JOB AS SQFT
DISCUSSED
MASTER BATHROOM = 28-0X8-0 SQFT 244.00 -
KIDS BATRHOOM =28-0X8-0 SQFT 244.00 -
GUEST BATHROOM = 28-0X8-0 SQFT 244.00 -
KITCHEN = 40-0X9-0 SQFT 360.00
SERVENT BATHROOM = 17-0X9-0 SQFT 153.00
1,245.00 35.00 43,575.00
WALL TILES INSTALLATION WORK FIXING OF TILES WORK AS PER APPROVED
4 INCLUDING CEMENT MORTAR WITH BADARPUR, DUST INCLUDING LABOUR SQFT
COMPLETE JOB AS DISCUSSED
MASTER BATHROOM WALL TILE = 28-0X8-0 SQFT 244.00 -
KIDS BATRHOOM WALL TILE = 28-0X8-0 SQFT 244.00 -
GUEST BATHROOM WALL TILE = 28-0X8-0 SQFT 244.00 -
KITCHEN WALL TILE = 40-0X9-0 SQFT 360.00
SERVENT BATHROO WALL TILE = 17-0X9-0 SQFT 153.00
1,245.00 55.00 68,475.00
FLOOR TILES INSTALLATION WORK FIXING OF TILES WORK AS PER APPROVED
5 INCLUDING CEMENT MORTAR WITH BADARPUR, DUST INCLUDING LABOUR SQFT
COMPLETE JOB AS DISCUSSED
MASTER BATHROOM FLOOR TILE = 5-6X8-6 SQFT 46.75
KIDS BATRHOOM FLOOR TILE = 5-6X8-6 SQFT 46.75
GUEST BATHROOM FLOOR TILE= 5-6X8-6 SQFT 46.75
KITCHEN FLOOR TILE = 13-0X7-0 SQFT 91.00 -
SERVENT BATHROO FLOOR TILE = 4-0X5-0 SQFT 20.00
251.25 75.00 18,843.75
MASTER BEDROOM WOODEN FLOORING - PROVIDING AND FIXING WOODEN
6 FLOORING WITH SKIRTING (MAKE PERGO HIGH CLASS) COMPLETE JOB AS SQFT
DISCUSSED
MASTER BEDROOM FLOORIG = 15-6X12-6 SQFT 193.75 240.00 46,500.00
ELECTRICAL WORK PROVIDING AND FIXING OF ELECTRICAL MADE OUT WITH MS
7 BOXES, PVC PIPE, WIRE 4MM, 2.5MM, 1.5MM AND 1MM WITH SOCKET, MCB SQFT 1,750.00 115.00 2,01,250.00
BOXES WIRE MAKE HAVELLS, SWITCH AND SOCKET HAVELLS.
PAINT PROVIDING AND LAYING OF ROYAL DOUBLE COAT WITH PUTTI, INSIDE
8 ROOF WITH WALL COMPLETE OUTSIDE BALCONY UTILITY AREA APEX PAINT AS SQFT 6,550.00 29.50 1,93,225.00
PER APPROVED COLOUR AND SHADE AS PER DISUCSSION.
POP PUNNING WORK PROVIDING AND LAYING OF POP PUNNING FOR DRAWING
9 AND DINING ROOM, AND ALL ROOM WALL POP ONLY ON WALL (AS PER SQFT 4,350.00 25.00 1,08,750.00
DISCUSSION)
AC WORK PROVIDING AND INTERNAL PIPING COPPER PIPING OF AC WITH 4
10 RMT 40.00 850.00 34,000.00
CORE WIRE FOR 4 NOS AC (AS PER DISCUSSION)
AC DRAIN PIPING RMT 45.00 125.00 5,625.00
BATHROOM PLUMBING WORK INSTALLATION AND LAYING OF
11 MASTER BATHROOM SHOWER, WASH BASIN, WC GEYSER, ALL WORK NOS 3.00 15,500.00 46,500.00
COMPLETE AS PER DISCUSSION.
BATHROOM INTERNAL PIPING PROVIDING AND LAYING OF INTERNAL
12 PIPING MATERIALS FOR BATHROOM INCLUDING PIPE, BAND, SOCKET NOS 3.00 7,500.00 22,500.00
INCLUDING ALL MATERIALS, (NOT INCLUDING DIVERTER, CISTERN )
KITCHEN PLUMBING WORK INSTALLATION AND FIXING OF KITCHEN
13 L/S 1.00 15,500.00 15,500.00
PLUMBING WORK WITH LOWER, SERVENT BATHROOM, WITH KITCHEN WORK.
KITCHEN SERVENT BATHROOM PIPING BAND SOCKET COMPLETE JOB AS PER
14 L/S 1.00 7,500.00 7,500.00
DISCUSSIION.
POP FALSE CEILING PROVIDING AND FIXING OF POP FALSE CEILING FOR
15 DRAWING ROOM WITH COVE PATTA, U SIDE WITH ALL 3 BATHROOM CEILING AS SQFT 480.00 95.00 45,600.00
PER APPROVED DESIGN AND DRAWING AS DISCUSSED.
OLD DOOR POLISH - REMOVING OLD DOORS POLISH AND
16 APPLYING NEW POLISH WITH REPAIR MELAMINE FINISH WITH NOS 11 9,500.00 1,04,500.00
DOOR FRAME
MARBLE POLISH POLISHING OF ALL MARBEL
17 SQFT 1500.00 85.00 1,27,500.00
MARBLE WITH DIMOND POLISH WITH SKIRTING AS DISCUSSED.
18 MIRROR BASIN BATHROOM WITH FRAME NOS 3.00 6,500.00 19,500.00
SHOWER CUBICALS WITH 10MM TOUGHENED GLASS WITH HARDWARE
NOS 3.00 17,000.00 51,000.00
COMPLETE
OLD TILES REMOVING WITH CIVIL WORK REPARING PLASTER AND
REMOVING MALBA FOR UTILITY AREA BATHROOM CISERN BRICK WALL, ALL
19 L/S 1.00 50,000.00 50,000.00
KITCHEN DISMANTLING, ADITTTIONAL WALL WITH PLASTER REMOVAL AS PER SITE
GUIDELINES. (INCLUDING ADDITIONAL NEW WALL WITH PLASTER)
BATHROOM VANITY BOX WITH GRANITE TOP PROVIDING AND
20 FIXING OF BATHROOM VANITY WITH GRANITE TOP FOR BATHROOM AS PER NOS 3.00 15,500.00 46,500.00
DISCUSSION.
NOT INCLUDING
TILES
BATHROOM FITTINGS
LIGHT AND FAN
AC UNIT
KITCHEN SINK, HOB
OVEN, MICRO RO, GEYSER
WINDOWS
-
TOTAL AMOUNT 19,02,218.75
GST@ 18% EXTRA
GRAND TOTAL 19,02,218.75
RS. NINTEEN LAKH TWO THOUSAND TWO HUNDRED AND EIGHTEEN RUPEES ONLY
NOTE:
1 As per discussion GST will be Minimum 10%
This is Computer Generated Invoice