100% found this document useful (1 vote)
1K views9 pages

Kship GVR: Sorce: Sankanur Cross Crusher

This document provides test results and mix design details for granular sub base (GSB) to be used in a road rehabilitation project from Navalgund to Ron in Karnataka, India. Test results on the source material from Sankanur Cross Crusher meet the specifications. The recommended mix is 45% 40mm and down aggregate, 30% 20mm and down aggregate, and 25% stone dust. Graphs show the combined gradation curve meets the job mix formula limits.

Uploaded by

Vijay Jamadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views9 pages

Kship GVR: Sorce: Sankanur Cross Crusher

This document provides test results and mix design details for granular sub base (GSB) to be used in a road rehabilitation project from Navalgund to Ron in Karnataka, India. Test results on the source material from Sankanur Cross Crusher meet the specifications. The recommended mix is 45% 40mm and down aggregate, 30% 20mm and down aggregate, and 25% stone dust. Graphs show the combined gradation curve meets the job mix formula limits.

Uploaded by

Vijay Jamadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

KSHIP GRANULAR SUB BASE MIX DESIGN DATA GVR

Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33

Client : P.D., PIU, PWD, Government of Karnatake

Engineer : Executive Engineer, KSHIP, Belguam Division

Contractor : M/s. GVR Constructions Pvt. Ltd.,

Sorce: SANKANUR CROSS CRUSHER


SNO. DESCRIPTION OF TEST TESTING METHOD RESULT MORTH LIMIT

1 Water Absorption IS 2386Part - 3 1.13% Max. 2%

2 Liquid Limit & Plasticity Index IS 2720Part - 5 Non Plastic Max. 25% & 0%

3 MDD & OMC IS 2720 Part - 8 2.18 gm/cc, 5.6% -

4 Soaked CBR IS 2720 Part - 16 48.80% Max. 30%

5 10% Fines value BS:812 Part - 111 116KN. Min.50KN

Submitted by Asst. Engineer Asst. Executive Enginee Executive Engineer


KSHIP GSB BLENDING GVR
Contract : REHABILITATION OF ROAD FROM NAVALGUND TO RON - KSHIP PACKAGE - M 33

Client : P.D., PIU, PWD, Government of Karnatake

Engineer : Executive Engineer, KSHIP, Belguam Division

Contractor : M/s. GVR Constructions Pvt. Ltd.,

Location :- Date of Samping :-

Date of testing :-

IS Sieve size % of Passing 40mm 20mm Dust % of


Limits
mm 40mm 20mm Dust 45% 30% 25% Passing

75.00 100.00 100.00 100.00 45.00 30.00 25.00 100.00 100.00

26.50 25.17 100.00 100.00 11.33 30.00 25.00 66.33 55-75

4.75 0.00 1.47 84.83 0.00 0.44 21.21 21.65 10-30

0.08 0.00 0.00 1.93 0.00 0.00 0.48 0.48 0-10

Remarks:
Submitted by Asst. Engineer Asst. Executive Executive
Engineer Engineer
INDIVIDUAL GRADIATION FOR G.S.B. MIX DESIGN

40mm&DOWN 20mm&DOWN
SIEVE SIZE Sample -1 Sample -2 Sample -3 Sample -4 Sample -5 Avg. Sample -1 Sample -2 Sample -3 Sample -4 Sample -5 Avg.
75 100 100 100 100 100 100 100 100 100 100 100 100
26.5 23.60 24.90 25.80 23.90 24.80 24.60 100 100 100 100 100 100
4.75 0 0 0 0 0 0 1.00 1.20 1.50 1.60 1.40 1.34
0.075 0 0 0 0 0 0 0 0 0 0 0 0

Stone Dust
SIEVE SIZE Sample -1 Sample -2 Sample -3 Sample -4 Sample -5 Avg.

75 100 100 100 100 100 100

26.5 100 100 100 100 100 100

4.75 83.50 86.26 84.90 83.42 85.90 84.80

0.075 2.0 1.8 1.6 2.0 1.94 1.87

Remarks:
Submitted by Asst. Engineer Asst. Executive Enginee Executive Engineer
BLENDING SHEET FOR G.S.B MIX DESIGN @SANKANUR CROSS CRUSHER

AGGREGA % BLENDING

40 mm& D 45

20 mm& D 30

DUST 25 .

IS SIEVE(mm) 40 mm 20 mm DUST J.M.F MEAN LOWER UPPER


75 100 100 100 100 100 100 100
26.5 24.60 100 100 66.07 65 55 75
4.75 0 1.34 84.80 21.60 20 10 30
0.075 0 0 1.87 0.47 5 0 10

110

100

90

80

70
% PASSING

60

50

40

30

20

10

0
0.075 4.750 26.500 75.000
I S SIEVE
J.M.F. MEAN LOWER UPPER SIEVE SIZE
10

0
0.075 4.750 26.500 75.000
I S SIEVE
J.M.F. MEAN LOWER UPPER SIEVE SIZE
PROJECT

Rehabilitation Of Road From Navalgund To Ron Contract Package-M33

CLIENT

KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT (KSHIP)

CONTRACTOR

G.V.R CONSTRUCTIONS PVT LTD.

JOB MIX FORMULAE

FOR
GRANULAR SUB BASE
AT
SANKANUR CROSS CRUSHER