Jobs Safety Analysis (JSA)

This document provides a jobs safety analysis for scaffolding erection, dismantling, welding, gas cutting and other work at height activities. It identifies potential hazards for each task such as falls, electrocution, injury and collapse. Control measures are specified like using harnesses, barricading work areas, conducting inspections and following permit to work procedures. Personal protective equipment requirements are also listed, including safety helmets, gloves, goggles and protective footwear. The analysis aims to ensure the safety of workers by having risk controls in place before starting any hazardous construction work.

Uploaded by

uttam mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views8 pages

Jobs Safety Analysis (JSA)

This document provides a jobs safety analysis for scaffolding erection, dismantling, welding, gas cutting and other work at height activities. It identifies potential hazards for each task such as falls, electrocution, injury and collapse. Control measures are specified like using harnesses, barricading work areas, conducting inspections and following permit to work procedures. Personal protective equipment requirements are also listed, including safety helmets, gloves, goggles and protective footwear. The analysis aims to ensure the safety of workers by having risk controls in place before starting any hazardous construction work.

Uploaded by

uttam mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Jobs Safety Analysis

(JSA)

JOB/ACTIVITY NAME: Scaffolding Erection & Dismantling work , Work at height, Welding Work, Gas Date: 15.07.2021
Cutting, cladding works
JSA #: HTG-JSA- ESEPPL- 004
DEPARTMENT/AGENCY NAME AREA LOCATION(s): MPH#2,CCR Building OTHER INFORMATION:

Department: Civil

Agency: M/s.ESE POWERCON PVT LTD

REQUIRED PERSONAL PROTECTIVE EQUIPMENT FOR ENTIRE JOB

 Safety Helmet  Safety Goggles Hearing Protection  Dust Masks Others


 Safety Shoes  Full body harness  Face Shield Gum Boots
 Reflective vest  Welding Gloves  Welding Goggles
 Hand Gloves Chemical Resistant Gloves  Leather Gloves

Sl.No Description of task Potential Hazards Control measures Action By


1. Shifting of 1. Physical Injury due 1.Use appropriate trolley/Trailer for shifting of Scaffolding Safety Officer-Uttam Kumar
Scaffolding to improper materials Mishra
Materials Handling Site Supervisor-Rupesh
2.Dont do Manual lifting if the materials is too heavy to lift.
2.Egronomical 3.For Shifting of Scaffolding materials to height use rope &
Hazard due to Pulley arrangement & tie the scaffolding materials properly to
improper lifting of avoids slips.
material 4.Ensure no access block during Shifting of scaffolding
3. Slippage of materials.
materials during 5.Wear all required PPE & follow all safety signage’s at
lifting work-site.
6.Prior to work conduct TBT at Site.
533405803.doc Page 1 of 3
2. Erection of 1.Fall of materials due 1.Always ensure Proper installation of guard rails & fall Safety Officer-Uttam Kumar
Scaffolding to improper stacking arrestor system to avoid of fall of persons Mishra
2.Check the area & ensure no live wire should located near to Site Supervisor-Rupesh
2.Fall of Persons.
scaffolding.
3.Electrocution 3.Use Standard ladder for erection work & use three-point
4.Scaffolding collapse contact during climbing.
5.Unauthorized entry 4.Only competent & experienced manpower to be engaged for
scaffolding work.
5.Whole area to be barricaded prior to work.
6.Maintain Housekeeping & 5s system at work area.
7.Wear all required PPE .
8.Ladder should be provided for proper access.
9.Standard scaffolding must be erected as per the load
requirement (Light /Heavy/Medium)
10.Scaffolding should be erected under the supervision of
authorized scaffolder and site engineer.
11.All the hand (Hammers, spanners) tools must be provided
with fall protection rope and tie rope.
12.Only aluminum ladder with sufficient length should be
provided
13.All the height working platform must be fully covered
with gratings or planks.
14.All the manhole openings should be protected with either
standard hard barricading or mesh or cover to prevent
accidental fall of person and material
15.Follow Permit to work system.
3. Work on Collapse of 1.All the height work must be started with having valid work Safety Officer-Uttam Kumar
scaffolding or Structure permit Mishra
man basket, 2.Trained and medically fit (i.e. All the height workforce Site Supervisor-Rupesh
Fall of Person
man lift, scissor should be gone through Vertigo Test)workforce to be
Fall of
lift, suspended deployed.
Material
platform. Other
height work 3.All the scaffolding must be erected under the supervision of
platform. site engineer and qualified scaffold only. Only good condition
and scaffolding components should be used for all type of
scaffolding
Page 2 of 8
4.Standard platform gratings should be used, and the height
work platform should have a minimum of350mm to 400mm
or a minimum of double grating working platform must be
arranged Double railing (mid rail, and top tailing) must be
arranged for all the height work platform.
5.Scaffolding tags must be arranged to identification
Standard ladder with vertical fall arrester for each person must
be provided

6.Scaffolding or ladder component must be avoid for direct


welding to the structural column or other structure.

7.Only beam clamp or grating clamp should be used for


scaffolding tube fixing to the column or beam structure
component.
8.Double lanyard safety harness with shock absorber of
approved brand must be provided to the workforce.

9.Without HTG HSE dept. alternation of any type of


scaffolding or safety protective facility must not be changed

4. Dismantling of Fall of 1.Ensure proper lifting & lowering management. Standard Safety Officer-Uttam Kumar
Scaffolding material, Bag should be used for lowering of clamps. Mishra
clamp, spanner Site Supervisor-Rupesh
2.Safety Net to be tied & barricading to be provided below to
from height dismantling work.
Injury to 3.On the Job Training & Safety Training to be provided on
Person continuous basis.
Property 4.Sequence of dismantling followed, all the bracing are in
Page 3 of 8
Damage place, scaffold in vertical.
5.Double lanyard safety harness with shock absorber of
approved brand must be provided to the workforce

5. Welding ,Cutting & Burn Injury, Fire, 1.Always make sure that all electrical connections are Safety Officer-Uttam Kumar
Grinding activity Electrocution, Flying securely made. Mishra
Chips Site Supervisor-Rupesh
2.All Cables must be maintained in good conditions & laying
above the ground.
3.ELCB/RCCB/MCCB should be checked before the job.
4.Wheel guard is must for grinding & cutting activity.
5.Area shall be free from any combustible material during
cutting , welding & grinding.
6.Fire Extinguisher shall be placed near the hot work area.
7.Welders should use Welding Helmets, Sleeves, Apron,
Leather hand Gloves & Leg Guard.
8.The machining should be certified by the electrician.

6. Gas Cutting activity Presence of 1. Ensure the pipeline / equipment to be gas cut is isolated, Safety Officer-Uttam Kumar
Flammable / Toxic depressurized, drained, flushed, and purged as required for Mishra
(Planning)
Vapor or Liquid safe execution of the job. Site Supervisor-Rupesh

Fire & Explosion 2. Ensure the worksite is free from flammable / toxic vapor or
liquid.
3. The entry of non – certified tools / equipment / Mobile
Plant are to be authorized under appropriate Work Permit.
4. Keep the fire extinguishers & fire hoses in ready condition.
7. Gas Cutting activity Defective Tools Safety Officer-Uttam Kumar
Mishra
(Operation) Heat Radiation 1. Ensure the cutting torch, hoses & gas cylinders are free
Site Supervisor-Rupesh
Exposure to from defect.
Hazardous Fumes 2. Wear the required PPE (Long Sleeve Coverall, apron,
Burns safety Goggle etc)
Falling Sparks / Hot 3. Ensure proper ventilation at the worksite.
bids 4. Wear long sleeved coverall & apron.
Oxy-acetylene 5. Use leather hand gloves.
Page 4 of 8
Cylinders 6. Keep First Aid Kit at site.
7. Keep Oxy-acetylene Cylinders safely at least 5 meters away
from the work location.
8. Close the isolation valve at cylinders when not in use.
8. Gas Cutting activity Scattered Material 1. Ensure proper wind up & housekeeping at worksite. Safety Officer-Uttam Kumar
Mishra
(Housekeeping) 2. The accessories (torch, hoses & cylinders) not being used
Site Supervisor-Rupesh
must be disconnected and stored separately.

Fall of Materials 1.Install barricades "exclusion zone" with sign boards indicating Safety Officer-Uttam Kumar
roofing works in progress to prevent unauthorized entry. Mishra
Site Supervisor-Rupesh
Wind Hazard 2.All materials shall be safely lowered from one level to the next
Personal injury due to level by lifting equipments or by securely attaching a rope and
poor body position. hauling. Throwing of equipment is strictly prohibited.
Fall from Height. 3.Tools shall be tied by retaining rope attached to the harness.
9. Cut Injury due to
Cladding works sharp edges 4.proper precaution to be provided to provided for the edges to
avoid any cut injury during handling.

5.Lifting work must be stopped during strong wind.

6.Maintain proper housekeeping at the workplace

1.Equipment shall be serviced maintained and inspected as per set Safety Officer-Uttam Kumar
maintenance and inspection program. Mishra
Mechanical Breakdown. 2.Ensure E-Stop is in place through the control system. Site Supervisor-Rupesh
Improper use of
Use of Man-lifter 3.Perform equipment daily check prior to use.
equipment 4.Manlift shall not be used as cranes or jacks unless they have
Untrained personnel specifically been designed for this purpose by their manufacturers.
10.
Fall of personnel 5.Leaning out of the platform will not be allowed
Overturning of Machine 6.Colour code sticker to be available on the equipment.
Vehicle movement 7.Ensure platforms must only be used by authorized personnel who
Page 5 of 8
have been trained in the operation of the type of platform in use.
8.On the Job training should cover operating principles, machine
controls and environmental conditions, which are likely to be
encountered.
9.Safety harness shall be provided for the use of all personnel
working from mobile work platforms so that in the event of
any advertent movement of the platform they are working from,
they will not be thrown from it
10.Boxes, hop-ups or ladders will not be used to gain additional
height
or reach from the platform of man-lift machine work platform.
11.The platform shall not be overloaded exceeding the regulated
safe working load.
12.Slewing of the boom to the extent that causes the machine to
overturn shall be avoided.
13.Third party inspection to be done for Man-lifter.

Page 6 of 8
1. Daily TBT should be given to workers.
2. Don’t allow the person to lift more than 30kg for materials
1.Ergonomic issue shifting from one place to other.
3. Provide Trolley for materials shifting.
2.Cut Injury
4. Use Cut resistance hand gloves for handling sharp objects.
3.Pinch points 5. Ensure that workmen keep their hands / leg away from pinching
4. Cuaght in-between points. Proper communication & co ordination with co worker.
Telescopic / 6. The telescopic /extendable type of material viz. toe guard, shall
Extendable materials not be handled in extended form Safety Officer-Uttam Kumar
5. 5.Hit by 7 The extended or telescopic type of material shall be erected or Mishra
lower horizontally to avoid sliding of extendable parts
11. Object/Load Site Supervisor-Rupesh
Material Handling 6. Falling or sliding of 8 Workers shall not put their body parts in between extendable parts
(Manually) materials while of material.
unloading materials 9.Workmen should be deployed as per Load capacity and size of the
(Manually / load
mechanically) from 10. Ensure any heavy loads or any irregular dimension job having
truck or vehicle less load shall be unloaded mechanically if possible.
11. Effective supervision shall be ensured.
12. Experienced / trained rigger shall be deployed if mechanical
handling
13. Material shall be unlashed in such a way it should not slide on a
person who involved in the activity.
1.Toppling of hydra . 1. Pre lifting plan should be prepared before start of lifting any
/crane materials by crane. It is to be ensured that it should not cross the
2.Fall of material due SWL of the crane/hydra.
2. Before starting of loading/unloading by crane, the work area soil
Material Handling to failure of
12. condition should be plane & compacted.
(Mechanically) sling/lifting tackles. 3. Crane/Hydra boom should be kept as low as possible during Safety Officer-Uttam Kumar
3.Fall of person from shifting of material. Mishra
Trailer 4. Use only good condition, tested & appropriate lifting tools and Site Supervisor-Rupesh
4. Electrocution of tackles. No Tandem lifts allowed with Hydra.
Crane/Hydra 5. Inspection of over hoist limit switches periodically. Daily
Inspection(checklist) of crane by Operator.
5. Run over due to Use tagline while carrying loads.
vehicular movement 6. Approach area for the crane/hydra should be obstacle free,
physical condition of the approach road should be proper.
7. Proper license holder driver should operate the crane/hydra.
8. During shifting of material if there is any HT electrical utilities
proper & necessary precaution should be taken such as Goal
post/Bunting Pole should be ensured.
Page 7 of 8
Kindly specify If any other measures to be implemented:

I will affirm that the aforesaid precautions shall be communicated to all of the workmen and ensured the compliance during the execution
of the job.

JSA Approved by
JSA Reviewed By:
JSA prepared by: (Agency) (HTG & Adani if
(HTG Site Engineer)
need)

Sub Contractor Engineer Signature Signature

Sub Contractor HSE

Page 8 of 8