Ship, Shore Cargo Handling Agreement

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

SHINTOKU KAIUN CO.

,LTD

SHIP/SHORE CARGO HANDLING AGREEMENT


M/T : STAR DREAM PORT : LUMUT, MALAYSIA.
VOY NO : 031 DATE : 7TH APR' 2003.
BERTH : LMT NO.3
TYPE OF OPERATIONS : LOADING / DISCHARGING
CARGO : CRUDE PALM OLEIN NOMINATED QUANTITY
3060.000MT
TANKS NOS : 3P,3S,9P & 9S. CARGO TEMERATUREABOUT 33'C
DENSITY 15/20'C V.C.F / D.C.F :USED TABLE
N2 REQUIRED : NO INHIBITED : NO
HEATING REQUIRED : NO VOYAGE:25 - 30'C DISCH.:32 - 35'

LOADING / DISCHARGING FACILITIES SHIP SHORE


LOADING / DISCHARGING QUANTITY 3060.000 M/T 3000.000M/T

LOADING HOSE / MANIFOLD FLANGE SIZE 6 INCH 6 INCH

LOADING LINE SIZE ( VAPOUR ) N/A N/A

TANKS CAPACITY( 100% ) 3572.944K/L N/A

INITIAL LOADING / DISCHARGING (M³/HR) 150.00 M/T 150.00 M/T

NORMAL LOADING / DISCHARGING (M³/HR) 400.00M/T 250.00 M/T

TOPPING OFF RATES (M³/HR) 150.00 M/T 150.00 M/T


NORMAL STOPPING TIMKS
(Inform to terminal before 30 MINS 30 MINS
campletinon)
PRESURE (MAX ACCOWABLE ) 10 Kg/Cm² 5 Kg/Cm²

PRESSURE / START LOADING OR DISCHARGING 2 Kg/Cm² 2 Kg/Cm²

PRESSURE / NORMAL CONDITION LOAD' OR DISCH' 7 Kg/Cm² 5 Kg/Cm²

SHORE TANK DISTANCE Mtrs ABT 2000.00 Mtrs

EMERGENCY STOPPING TIME (EMER' SHUTDOWN) 10 Sec 10 Sec

COMMUNCIATION 3 DECK MEN(M.F) 2SHORE MEN(WHARF)

CARGO OPERATION STOP BY SHORE


REMARK

CHIEF OFFICER LOADING MASTER


SHINTOKU KAIUN CO.,LTD

SHIP/SHORE CARGO HANDLING AGREEMENT


M/T : STAR DREAM PORT :
VOY NO : DATE :
BERTH :
TYPE OF OPERATIONS : LOADING / DISCHARGING
CARGO : NOMINATED QUANTITY :
TANKS NOS : CARGO TEMERATURE :
DENSITY 15/20'C V.C.F / D.C.F :
N2 REQUIRED INHIBITED :
HEATING REQUIRED :

LOADING / DISCHARGING FACILITIES SHIP SHORE


LOADING / DISCHARGING QUANTITY M/T M/T

LOADING HOSE / MANIFOLD FLANGE SIZE INCH INCH

LOADING LINE SIZE ( VAPOUR )


TANKS CAPACITY
INITIAL LOADING / DISCHARGING (M³/HR) M/T M/T

NORMAL LOADING / DISCHARGING (M³/HR) M/T M/T

TOPPING OFF RATES (M³/HR) M/T M/T


NORMAL STOPPING TIMKS
(Inform to terminal before HR HR
campletinon)
PRESURE (MAX ACCOWABLE ) Kg/Cm² Kg/Cm²

PRESSURE / START LOADING OR DISCHARGING Kg/Cm² Kg/Cm²

PRESSURE / NORMAL CONDITION LOAD' OR DISCH' Kg/Cm² Kg/Cm²

SHORE TANK DISTANCE mtrs mtrs

EMERGENCY STOPPING TIME (EMER' SHUTDOWN) sec sec

COMMUNCIATION
CARGO OPERATION STOP BY
REMARK

CHIEF OFFICER LOADING MASTER


SHINTOKU MARINE CO.,LTD.

SHIP/SHORE CARGO HANDLING AGREEMENT


VESSEL : M/T KY VENUS PORT :
VOY NO : DATE :
BERTH :
TYPE OF OPERATIONS : LOADING / DISCHARGING
CARGO : NOMINATED QUANTITY :
TANKS NOS : CARGO TEMERATURE :
DENSITY 15/20'C : V.C.F / D.C.F :
N2 REQUIRED : INHIBITED :
HEATING REQUIRED :
LOADING / DISCHARGING FACILITIES SHIP SHORE
LOADING / DISCHARGING QUANTITY M/T M/T

LOADING OR DISCH. HOSE / MANIFOLD FLANGE SIZE INCH INCH

LOADING/DISCHARGING LINE SIZE ( VAPOUR )


Number of Manifold connection postion
TANKS CAPACITY ( 100 % ) M³ M³
INITIAL LOADING / DISCHARGING (M³/HR) M³ M³
NORMAL LOADING / DISCHARGING (M³/HR) M³ M³
TOPPING OFF / STRIPPING RATES (M³/HR) M³ M³
NORMAL STOPPING TIMES
(Inform to terminal before HR HR
completion)
PRESURE (MAX ALLOWABLE ) Kg/Cm² Kg/Cm²

PRESSURE / START LOADING OR DISCHARGING Kg/Cm² Kg/Cm²

PRESSURE / NORMAL CONDITION LOAD' OR DISCH' Kg/Cm² Kg/Cm²

SHORE TANK DISTANCE mtrs mtrs

EMERGENCY STOPPING TIME (EMER' SHUTDOWN) sec sec

COMMUNCIATION DURING THE CARGO OPERATION


COMMUNCIATION FOR EMERGENCY
CARGO OPERATION STOP BY
REMARK

CHIEF OFFICER LOADING MASTER

You might also like