0% found this document useful (0 votes)
371 views2 pages

WBS-Infrastructure Deployment

The document outlines the work breakdown structure (WBS) for an infrastructure deployment project. It involves analyzing the current infrastructure environment, designing improvements and updates, developing a budget, finalizing and validating the design, deploying infrastructure components through a phased pilot and production rollout, and conducting a post-implementation review. The goal is to align the infrastructure deployment with business goals through a thorough analysis, design, and deployment methodology.

Uploaded by

M iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
371 views2 pages

WBS-Infrastructure Deployment

The document outlines the work breakdown structure (WBS) for an infrastructure deployment project. It involves analyzing the current infrastructure environment, designing improvements and updates, developing a budget, finalizing and validating the design, deploying infrastructure components through a phased pilot and production rollout, and conducting a post-implementation review. The goal is to align the infrastructure deployment with business goals through a thorough analysis, design, and deployment methodology.

Uploaded by

M iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Infrastructure Deployment – WBS

 Infrastructure Deployment
o Scope
 Determine project scope
 Secure project sponsorship
 Define preliminary resources
 Secure core resources
 Complete
o Analysis
 Infrastructure
 Review hardware, software and communications environment
 Identify hardware, software and communication updates
 Review connectivity LAN/WAN
 Identify connectivity LAN/WAN improvements/issues
 Review support environment
 Identify support environment improvements/additions
 Review geographic factors
 Identify mitigation of geographic factors
 Identify target areas for Improvement
 Define system requirements
 Review business goals/direction/vision
 Review current market solution vendors
 Hardware, software and communication vendors
 Design partners
 Implementation partners
o Design
 Secure necessary architectural resources
 Infrastructure design documents
 Preliminary hardware, software and communication design
 Preliminary connectivity LAN/WAN design
 Preliminary support environment design
 Review preliminary design documents
 Obtain feedback/input on design
 Develop detailed infrastructure design documents
 Align long/short term infrastructure design with business goals
o Budget
 Develop budget
 Align budget request with business goals
 Align budget request with infrastructure requirements timeline
 Secure multi-phase/year funding for key initiatives
o Finalization/Validation
 Secure resources
 Finalize detailed design
 Develop detailed implementation strategy
 Validate implementation strategy in test environment
 Secure approval to proceed
o Deployment
 Logistics
 Secure deployment resources
 Train deployment resources in deployment methodology
 Pilot
 Select infrastructure component to deploy
 Review deployment team tasks and timeline
 Deploy and test infrastructure component
 Release to production/operations environment
 Final deployment
 Repeat pilot
 Review results
 Communicate impact
o Post Implementation Review
 Document lessons learned
 Distribute to team members
 Create software maintenance team

You might also like