0% found this document useful (0 votes)
31 views1 page

Tubular Inspection Sheet - 2021-001 Part 4

Uploaded by

Aldrin Hernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Tubular Inspection Sheet - 2021-001 Part 4

Uploaded by

Aldrin Hernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Client: SCIENTIFIC DRILLING INTERNATIONAL

TUBULAR INSPECTION SHEET Inspection Sheet No.: 2021-001 Approved JO No.:


Delivery Ref: MRR Received by: JOEL ANDRES MRR No.: 21-001
Date: JANUARY 7, 2021 Date Received: JANUARY 5, 2021 Page No.: 4 OF 4

Box Pin REMARKS


Item Qty. Description Serial No.
Connection Relief Features Tool Joint O.D. Connection Relief Features Tool Joint O.D. CENTER THREAD BOX PIN
7-7/8" INTEGRAL BLADE STABILIZER STRING GOOD CONDITION W/ THREAD GOOD CONDITION W/
4 1 155-073 4"IF BB 6.48" 4"IF N/A 6.48" N/A
(OAL: 1418 mm) PROTECTOR THREAD PROTECTOR
SCOPE OF WORK: REPAIR CRACK ON BLADE BASE AND REWELD. AFTER REWELD, CONDUCT NDT INSPECTION ON WELDED PARTS.

Pin Connection Box Connection

Area to be repaired

TOOLS URGENTLY NEEDS TO BE DONE IMMEDIATELY PRIOR TO WOR REMARKS Inspected By Reviewed By Approved By
ITEM NOS. : ALL SELECTED ITEMS ONLY (REFER BELOW)

CONFIRMED BY :
WITH THREAD PROTECTOR
PRINT NAME OVER SIGNATURE ALDRIN HERNANDEZ MARJUN ALOLOR JAYSON AGUSTINO
RE-FAX WITH THIS SECTION COMPLETELY FILLED-UP QA/QC Engineer QA/QC Supervisor SCO Manager
FM-WI-QAD-01-01 Rev. 1