Appendix E.1. Pipe Support Calculation - PS-CP-01
Appendix E.1. Pipe Support Calculation - PS-CP-01
Appendix E.1. Pipe Support Calculation - PS-CP-01
Beam 2
Beam 1
2. Design Loads
Based on Structural Analysis Result conducted by using SACS Software, it's found that Maximum Member
Stress Unity Check is 0.04 due to Bending Stress.
Therefore, it can be concluded that the pipe supports are still adequate to resist the considered loads.
ODW
Grade = E70XX
Ultimate Strength of Weld (Fuw) = 48.200 KN/cm2
Yield Strength of Base Metal (Fy) = 24.800 KN/cm2
Allowable Bending Stress of Weld Fbyw (Same as base metal) * = 14.880 KN/cm2
Allowable Bending Stress of Weld Fbzw (Same as base metal) * = 14.880 KN/cm2
Allowable Shear Stress of Weld Fvw [Fvw = AMOD * 0.3 Fuw] = 14.460 KN/cm2
Allowable Compression Stress of Weld Fcw (Same as base metal) * = 14.880 KN/cm2
Thickness of Weld (twe) = 0.600 cm
Effective Thickness of Weld (twef) [twef = 0.707 twe] = 0.424 cm
Effective of Weld (ODw) [ODw = OD] = 16.830 cm
Effective of Weld for Shear (ODwv) [ODwv = OD] = 16.830 cm
Shear Stress Area of Weld (Avw) [Avw = 2 * PI() * Odwv * twef] = 44.857 cm2
Inertia of Weld (Iyw) [Iyw = PI() * r )] **
3
= 1872.028 cm4
Inertia of Weld (Izw) [Iyw = PI() * r3)] ** = 1872.028 cm4
Section Modulus of Weld (Syw) [Iyw = PI() * r )] **
2
= 222.463 cm3
Section Modulus of Weld (Szw) [Iyw = PI() * r2)] ** = 222.463 cm3
Bending Stress of Weld (σw y-y) [σw y-y = Myw / Syw] = 0.001 KN/cm2
Bending Stress of Weld (σw z-z) [σw z-z = Mzw / Szw] = 0.000 KN/cm2
Shear Stress of Weld (tyw) [tyw = Vyw / Avw] = 0.011 KN/cm2
Shear Stress of Weld (tzw) [tzw = Vzw / Avw] = 0.037 KN/cm2
Axial Compression Stress of Weld (σxw) [σxw = Cxw / Acw] = 0.393 KN/cm2
Conclusion :
The proposed welded connection is adequate to resist the considered loads.
The Base Plate for Pipe Support Type 01 is planned to use A36 Plate with dimension 23 cm x 23 cm x 0.9 cm.
Yield Strength of Base Plate Fy = 24.8 KN/cm2
Allow. Bending Stress of Base Plate Fbxb [Fbxb = 0.66Fy*AMOD] = 16.368 KN/cm2
Allow. Bending Stress of Base Plate Fbyb [Fbyb = 0.66Fy*AMOD] = 16.368 KN/cm2
Allow. Shear Stress of Base Plate Fvb [Fvb = 0.40Fy*AMOD] = 9.920 KN/cm2
Allowable Compression Stress of Base Plate Fcb = 14.880 KN/cm2
(Same as Beam 1 - Pls. see Attachment 3.10 for more detail description)
23 cm
23 cm
From SACS Output - Support Reactions Forces - Global Structure Coordinate, it's found :
Moment Force at Base Plate (Mxb) = 0.370 KN-m
Moment Force at Base Plate (Myb) = 0.110 KN-m
Shear Force at Base Plate (Vxb) = 0.510 KN
Shear Force at Base Plate (Vyb) = 1.660 KN
Compression Force at Base Plate(Czb) = 31.000 KN
Bending Stress of Base Plate (σb y-y) [σw y-y = Myb / Syb] = 0.000 KN/cm2
Shear Stress of Base Plate (txb) [txb = Vxb / Avb] = 0.025 KN/cm2
Shear Stress of Base Plate (tyb) [tyb = Vyb / Avb] = 0.080 KN/cm2
Comp. Stress of Base Plate (σzb) [σzb = Czb / Acb] = 0.059 KN/cm2
Bending Stress U.C. of Base Plate (σb x-x) [U.C. = σb x-x / Fbxb] = 0.000 OK
Bending Stress U.C. of Base Plate (σb y-y) [U.C. = σw y-y / Fbyb] = 0.000 OK
Shear Stress U.C. of Base Plate (txb) [U.C. =txb / Fvb] = 0.002 OK
Shear Stress U.C. of Base Plate (tyb) [U.C. =tyb / Fvb] = 0.008 OK
Comp. Stress U.C. of Base Plate (σzb) [U.C. = σzb / Fcb] = 0.0039 OK
Combined Compression and Bending Stress U.C. of Base Plate = 0.004 OK, U.C. < 1.0
Combined Shear Stress U.C. of Base Plate = 0.011 OK, U.C. < 1.0
Check All Bolts Combined Stress Unity Check
OK, All Combined Stress are less than 1.0
Conclusion :
The proposed Base Plate is adequate to resist the considered loads.
lwe = 7.00"
E70XX
7
16"
y
x
bwe = 7.00"
Grade = E70XX
Ultimate Strength of Weld (Fuw) = 48.200 KN/cm2
Yield Strength of Base Plate (Fy) = 24.800 KN/cm2
Allowable Bending Stress of Weld Fbxw (Same as base plate) = 16.368 KN/cm2
Allowable Bending Stress of Weld Fbyw (Same as base plate) = 16.368 KN/cm2
Allowable Shear Stress of Weld Fvw [Fvw = AMOD * 0.3 Fuw] = 14.460 KN/cm2
Allowable Tension Stress of Weld Ftw (Same as base plate) = 14.880 KN/cm2
Allowable Compression Stress of Weld Fcw (Same as base plate) = 14.880 KN/cm2
Shear Stress of Weld Lines with FRx [fvw-FRx = FRx / Aw] = 0.013 KN/cm2
Shear Stress of Weld Lines with FRy [fvw-FRy = FRy / Aw] = 0.043 KN/cm2
Comp. Stress of Weld Lines with FRz [ftw-FRz = FRz / Aw] = 0.794 KN/cm2
Bending Stress of Weld Lines with MRx [fbw-MRx = MRx / Sxw] = 0.001 KN/cm2
Bending Stress of Weld Lines with MRy [fbw-MRy = MRy / Syw] = 0.000 KN/cm2
Shear Stress U.C of Weld Lines with FRx [UC = fvw-FRx / Fvw] = 0.001 OK
Shear Stress U.C of Weld Lines with FRy [UC = fvw-FRy / Fvw] = 0.003 OK
Compres. Stress U.C of Weld Lines with FRz [UC = fcw-FRz / Fcw] = 0.053 OK
Bending Stress U.C. of Weld Lines with MRx [UC = fbw-MRx/Fbxw] = 0.000 OK
Bending Stress U.C. of Weld Lines with MRy [UC=fbw-MRy / Fbyw] = 0.000 OK
Conclusion :
The proposed Welding Profile is adequate to resist the considered loads.
2. Design Loads
Based on Structural Analysis Result conducted by using SACS Software, it's found that Maximum Member
Stress Unity Check is 0.04 due to Bending Stress.
Therefore, it can be concluded that the pipe supports are still adequate to resist the considered loads.
ODW
Grade = E70XX
Ultimate Strength of Weld (Fuw) = 48.200 KN/cm2
Yield Strength of Base Metal (Fy) = 24.800 KN/cm2
Allowable Bending Stress of Weld Fbyw (Same as base metal) * = 14.880 KN/cm2
Allowable Bending Stress of Weld Fbzw (Same as base metal) * = 14.880 KN/cm2
Allowable Shear Stress of Weld Fvw [Fvw = AMOD * 0.3 Fuw] = 14.460 KN/cm2
Allowable Compression Stress of Weld Fcw (Same as base metal) * = 14.880 KN/cm2
Thickness of Weld (twe) = 0.600 cm
Effective Thickness of Weld (twef) [twef = 0.707 twe] = 0.424 cm
Effective of Weld (ODw) [ODw = OD] = 16.830 cm
Effective of Weld for Shear (ODwv) [ODwv = OD] = 16.830 cm
Shear Stress Area of Weld (Avw) [Avw = 2 * PI() * Odwv * twef] = 44.857 cm2
Inertia of Weld (Iyw) [Iyw = PI() * r )] **
3
= 1872.028 cm4
Inertia of Weld (Izw) [Iyw = PI() * r3)] ** = 1872.028 cm4
Section Modulus of Weld (Syw) [Iyw = PI() * r )] **
2
= 222.463 cm3
Section Modulus of Weld (Szw) [Iyw = PI() * r2)] ** = 222.463 cm3
Bending Stress of Weld (σw y-y) [σw y-y = Myw / Syw] = 0.000 KN/cm2
Bending Stress of Weld (σw z-z) [σw z-z = Mzw / Szw] = 0.000 KN/cm2
Shear Stress of Weld (tyw) [tyw = Vyw / Avw] = 0.015 KN/cm2
Shear Stress of Weld (tzw) [tzw = Vzw / Avw] = 0.011 KN/cm2
Axial Compression Stress of Weld (σxw) [σxw = Cxw / Acw] = 0.324 KN/cm2
Conclusion :
The proposed welded connection is adequate to resist the considered loads.
The Base Plate for Pipe Support Type 01 is planned to use A36 Plate with dimension 39 cm x 39 cm x 0.9 cm.
Yield Strength of Base Plate Fy = 24.8 KN/cm2
Allow. Bending Stress of Base Plate Fbxb [Fbxb = 0.66Fy*AMOD] = 16.368 KN/cm2
Allow. Bending Stress of Base Plate Fbyb [Fbyb = 0.66Fy*AMOD] = 16.368 KN/cm2
Allow. Shear Stress of Base Plate Fvb [Fvb = 0.40Fy*AMOD] = 9.920 KN/cm2
Allowable Compression Stress of Base Plate Fcb = 14.880 KN/cm2
(Same as Beam 1 - Pls. see Attachment 3.10 for more detail description)
39 cm
39 cm
From SACS Output - Support Reactions Forces - Global Structure Coordinate, it's found :
Moment Force at Base Plate (Mxb) = 0.500 KN-m
Moment Force at Base Plate (Myb) = 0.670 KN-m
Shear Force at Base Plate (Vxb) = 0.660 KN
Shear Force at Base Plate (Vyb) = 0.490 KN
Compression Force at Base Plate(Czb) = 100.960 KN
Bending Stress of Base Plate (σb y-y) [σw y-y = Myb / Syb] = 0.000 KN/cm2
Shear Stress of Base Plate (txb) [txb = Vxb / Avb] = 0.019 KN/cm2
Shear Stress of Base Plate (tyb) [tyb = Vyb / Avb] = 0.014 KN/cm2
Comp. Stress of Base Plate (σzb) [σzb = Czb / Acb] = 0.066 KN/cm2
Bending Stress U.C. of Base Plate (σb x-x) [U.C. = σb x-x / Fbxb] = 0.000 OK
Bending Stress U.C. of Base Plate (σb y-y) [U.C. = σw y-y / Fbyb] = 0.000 OK
Shear Stress U.C. of Base Plate (txb) [U.C. =txb / Fvb] = 0.002 OK
Shear Stress U.C. of Base Plate (tyb) [U.C. =tyb / Fvb] = 0.001 OK
Comp. Stress U.C. of Base Plate (σzb) [U.C. = σzb / Fcb] = 0.0045 OK
Combined Compression and Bending Stress U.C. of Base Plate = 0.004 OK, U.C. < 1.0
Combined Shear Stress U.C. of Base Plate = 0.003 OK, U.C. < 1.0
Check All Bolts Combined Stress Unity Check
OK, All Combined Stress are less than 1.0
Conclusion :
The proposed Base Plate is adequate to resist the considered loads.
lwe = 7.00"
E70XX
7
16"
y
x
bwe = 7.00"
Grade = E70XX
Ultimate Strength of Weld (Fuw) = 48.200 KN/cm2
Yield Strength of Base Plate (Fy) = 24.800 KN/cm2
Allowable Bending Stress of Weld Fbxw (Same as base plate) = 16.368 KN/cm2
Allowable Bending Stress of Weld Fbyw (Same as base plate) = 16.368 KN/cm2
Allowable Shear Stress of Weld Fvw [Fvw = AMOD * 0.3 Fuw] = 14.460 KN/cm2
Allowable Tension Stress of Weld Ftw (Same as base plate) = 14.880 KN/cm2
Allowable Compression Stress of Weld Fcw (Same as base plate) = 14.880 KN/cm2
Shear Stress of Weld Lines with FRx [fvw-FRx = FRx / Aw] = 0.010 KN/cm2
Shear Stress of Weld Lines with FRy [fvw-FRy = FRy / Aw] = 0.007 KN/cm2
Comp. Stress of Weld Lines with FRz [ftw-FRz = FRz / Aw] = 1.526 KN/cm2
Bending Stress of Weld Lines with MRx [fbw-MRx = MRx / Sxw] = 0.000 KN/cm2
Bending Stress of Weld Lines with MRy [fbw-MRy = MRy / Syw] = 0.000 KN/cm2
Shear Stress U.C of Weld Lines with FRx [UC = fvw-FRx / Fvw] = 0.001 OK
Shear Stress U.C of Weld Lines with FRy [UC = fvw-FRy / Fvw] = 0.001 OK
Compres. Stress U.C of Weld Lines with FRz [UC = fcw-FRz / Fcw] = 0.103 OK
Bending Stress U.C. of Weld Lines with MRx [UC = fbw-MRx/Fbxw] = 0.000 OK
Bending Stress U.C. of Weld Lines with MRy [UC=fbw-MRy / Fbyw] = 0.000 OK
Conclusion :
The proposed Welding Profile is adequate to resist the considered loads.