Barmer Sewerage CLC Meeting Presentation-Final
Barmer Sewerage CLC Meeting Presentation-Final
Barmer Sewerage CLC Meeting Presentation-Final
1
(UNDER RUIDP Phase-IV)
2
Barmer
3
Ward Division of Barmer
4
Demographic View
S. No. Particular BARMER
1. Wards 55
2. Area 1465 Ha.
Intermediate
2036 129640
Year
5
RUIDP Phase-IV
Work To be consider in this work Approach
6
DETAIL PROJECT REPORT
OF
SEWERAGE
FOR
BARMER TOWN
7
POPULATION & SEWAGE GENERATION
Per Capita
Sewerage Load Sewerage Load
Year Pop Sewage Flow
KLD MLD
(LPCD)
8
DETAIL PROJECT REPORT OF
SEWERAGE FOR BARMER TOWN
Cost
S. No. Particular
(Rs. Crores)
9
Details of Sewer Lines Laid By RUIDP
Ward No.
02, 03, 04, 16, 27, 30, 31, 32, 33, 34, 35, 47, 48, 49,
50, 51, 52, 53 and 54
Total: 19 Wards Covered
10
Details of Sewer Lines Laid By TCIL
Ward No.
42, 44, 45 & 46
Total: 4 Wards Covered
11
Details of Sewer Lines Laid By NF Infra
Ward No.
17, 18, 20, 22, 25 & 26
Total: 6 Wards Covered
12
EXISTING SEWERAGE LAYOUT PLAN
13
Details of Sewer Lines Covered Under new Proposal
Ward No.
1, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 19, 21, 23,
24,28, 29, 36, 37, 38, 39, 40,
41, 43 & 45
Total: 26 Wards Covered under the proposal
14
PROPOSED SEWRAGE LAYOUT PLAN
15
DETAIL PROJECT REPORT OF SEWERAGE FOR
BARMER TOWN
COVERAGE OF WARDS
Under RUIDP Under
S. No. Particulars By TCIL By NF Infra Total
Ph-II New Proposal
No. of Wards
1 covered in Barmer 19 4 6 26 55
Town (Nos.)
Sewer Length in
2 27 10 20 110 167
Barmer Town (Km)
16
PROPOSED SEWERAGE WORKS
17
PROPOSED SEWERAGE WORKS
DWC PIPE ABSTRACT
Total
DWC Pipe Dia
(M)
200 mm 86942.00
250 mm 6607.00
300 mm 1209.00
Total 94758.00
SAY 94.76 KM
18
PROPOSED SEWERAGE WORKS
HDPE PIPE ABSTRACT
Total
HDPE PIPE DETAILS
(M)
250 mm dia HDPE pipe 1268.00
315 mm dia HDPE pipe 452.00
400 mm dia HDPE pipe 853.00
500 mm dia HDPE pipe 552.00
630 mm dia HDPE pipe 952.00
TOTAL 4077.00
SAY 4.07 KM 19
PROPOSED SEWERAGE WORKS
RCC PIPE ABSTRACT
Total
RCC PIPE DETAILS
(M)
350 mm Dia 816.00
400 mm Dia 1480.00
450 mm Dia 1647.00
500 mm Dia 169.00
600 mm Dia 7177.00
Total 11289.00
SAY 11.28 KM
20
Sewerage Treatment Plant
21
Location of STP
25°44'53.7"N, 71°28'20.4"E
23
Sewerage Treatment
25
ABSTRACT OF COST
General Abstract of Cost
Amount
S. No. Description
in Lakhs
1.0 Sewer Network 10744.32
2.0 Sewage Treatment Plant 1139.00
3.0 House Sewer Connections 1633.39
4.0 Provisional Sum 306.00
Total Project Cost of works 13822.71
5.0 Add Contingencies@ 2% of Project Cost 276.57
Operation and Maintenance Cost for 10 years
6.0 999.93
period in Lakhs
Total Project Cost Including O&M & Contingencies 15099.21
In Rs. Cr. 150.99
26
THANK YOU
27