Contoh Rencana Anggaran Biaya Rumah
Contoh Rencana Anggaran Biaya Rumah
Contoh Rencana Anggaran Biaya Rumah
site ww
(Tempat Download Data Teknik Sipil)
Luas Bangunan :
a. Bangunan Induk = 107.500 m2
b. Bangunan Teras :
100% = 25.500 m2
50% = 12.750 m2
m2
m2
m2
+
= 70.75 m2
PERHITUNGAN VOLUME
12.50 10.50
= 239.250 m2
12.50 10.50
= 54.000 m
b
3. Penyediaan Air Kerja 1.000 LS
b b. Pondasi Teras
b b (m) h (m) L (m) V = (bxh)xL
V total = 8.850 m3
4. Urugan Pasir Peninggi Lantai
L (m) h2 (m) VT = [ L x h2 ]
28.50 0.50
= 14.250 m2
Volume Total Pasangan Tembok Trasraam 35.850 m2
L (m) h (m) AT (m2) Agwl (m2) AK (m2) ATK (m2) A = [ ( L x h ) x2 - AT - Ak - ATK ] + Agwl
8. Acian Tembok
437.416
= 437.416 m2
PERHITUNGAN VOLUME
b b. Kaki Meja :
b (m) h (m) t (m) n (buah) V = [( b x h ) x t ] x n
0.920 2.000 3
= 5.520 m2
3. Pasangan Daun Pintu Double Teacwood 3 mm
0.720 2.000 2
= 2.880 m2
c. Type J 2
b (m) h (m) n (lubang) A = (bxh)xn
d. Type BV
b (m) h (m) n (lubang) A = (bxh)xn
BV 0.62 0.42 4
= 1.042 m2
64.50 2.00
= 129.000 m1
PERHITUNGAN VOLUME
A B L bubungan (m) L = L
14.5 = 14.500 m1
114.270 47.870
= 162.140 m2
B. Induk 139.600
= 239.600 m1
Emperan 100.000
As = ( b samping x h ) x n
a. Kaki Meja Dapur : = 0.72 m2
b samping (m) b depan (m) h (m) n (jml)
samping depan Ad = ( b depan x h ) x n
0.60 0.10 0.60
2.00 3.00 = 0.18 m2
b. KM/ WC :
Lw (m) P (m) h (m) A = ( Lw - P ) x h
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR 1 Pasangan Titik Lampu = 19 Buah
2 Pasangan Lampu TL 40 Watt = 2 Buah
3 Pasangan Lampu spiral 25 Watt = 9 Buah
4 Pasangan Lampu spiral 15 Watt = 2 Buah
5 Pasangan Saklar Tunggal = 6 Buah
6 Pasangan SaklarGanda = 3 Buah
7 Pasangan Stop Kontak = 7 Buah
8 Pasangan Sekring Cast = 1 Buah
9 Pasangan Arde Pembumian = 1 Buah
10 Pasangan Wastafel = 1 Buah
11 Pasangan Bak Air Porselin = 2 Buah
12 Pasangan Closed Jongkok = 2 Buah
13 Pasangan Septic Tank dan Peresapan = 2 Buah
14 Pasangan Instalasi Air Bersih = 1 Buah
15 Pasangan Instalasi Air Kotor = 1 Buah
16 Pasangan Floor Drain = 3 Buah
17 Pasangan Kran Air = 4 Buah
PERHITUNGAN VOLUME
437.416
= 437.416 m2
2. Cat Plafond
Apl (m2) A = APl
162.140
= 162.140 m2
3. Menie Kayu
a. Untuk Kosen :
b. Untuk Listplank :
P1 2.380 7 0.12 1
A = 1.540 m2
213.380
= 213.380 m2
6. Teac oil
Apn (m2) A = Apn x 2
5.520
= 11.040 m2
XI PEKERJAAN LAIN - LAIN 1. Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) = 46.000 m1
2. Pembersihan Kembali = 1 LS
REKAPITULASI VOLUME
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 2.8650 m3
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 1.1405 m3
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.2640 m3
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 3.0900 m3
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) 0.3960 m3
6 Cor Beton Neut (1pc : 2psr : 3krl) 0.0096 m3
IX PEKERJAAN FINISHING
1 Cat Tembok 437.4163 m2
2 Cat Plafond 162.1400 m2
4 Cat Kayu 72.6000 m2
5 Cat Seng 213.3800 m2
6 Teak Oil 11.0400 m2
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
A UPAH
1 Pekerja / buruh 8 Jam / Hari Org / Hari 25,000.00
2 Tukang Batu 8 Jam / Hari Org / Hari 40,000.00
3 Tukang Kayu 8 Jam / Hari Org / Hari 40,000.00
4 Tukang Besi 8 Jam / Hari Org / Hari 40,000.00
5 Tukang Cat 8 Jam / Hari Org / Hari 35,000.00
6 Tukang Listrik 8 Jam / Hari Org / Hari 37,500.00
7 Tukang Pipa 8 Jam / Hari Org / Hari 37,500.00
8 Tukang Las 8 Jam / Hari Org / Hari 37,500.00
9 Mandor 8 Jam / Hari Org / Hari 45,000.00
10 Mekanik 8 Jam / Hari Org / Hari 57,500.00
11 Pembatu Mekanik 8 Jam / Hari Org / Hari 35,000.00
12 Operator 8 Jam / Hari Org / Hari 52,500.00
13 Pembantu Operator 8 Jam / Hari Org / Hari 40,000.00
14 Supir 8 Jam / Hari Org / Hari 45,000.00
15 Pembantu Supir 8 Jam / Hari Org / Hari 42,500.00
16 Kepala Tukang 8 Jam / Hari Org / Hari 45,000.00
B BAHAN BANGUNAN
1 Agregat Kasar Bulat 2/3 Ret m3 187,500.00
2 Agregat Base Kls A Ret m3 208,333.33
3 Air bersih 3000 L Tangki liter 40,000.00
4 Air bersih 4000 L Tangki liter 47,500.00
5 Air bersih 5000 L Tangki liter 65,000.00
6 Angker Dok - - 10,000.00
7 Arde Pembumian - - 100,000.00
8 Atap Multiroof Sakura lbr 92,500.00
9 Atap Genteng Beton Pabrikan Bh 7,375.00
10 Bak cuci piring Stainless Steel Pabrikan Set 184,500.00
11 Bak air fiber Pabrikan Set 270,000.00
12 Bata Merah Pabrikan Bh 500.00
13 Batu Karang 5 / 7 Ret m3 51,667.00
14 Batuh Kali pecah 3 / 5 cm Ret m3 155,000.00
15 Batu kali Pecah 2 - 3 cm Ret m3 175,000.00
16 Batu Kali Pecah 1 / 2 (split) Ret m3 191,667.00
17 Batu Kali Ret m3 79,167.00
18 Batu Karang Ret m3 71,667.00
19 Batu Roster / Krawang Pabrikan Bh 30,000.00
20 Baut + Moer Kuda - kuda 0.12 mm Pabrikan Kg 10,000.00
21 Baut + Moer Angker f 12 mm Pabrikan Kg 10,000.00
22 Baut Sudut 0.16 f 16 mm Pabrikan Kg 10,000.00
23 Besi Beton Polos Ø 6 mm - Kg 6,695.00
24 Besi Beton Polos Ø 8 mm - Kg 6,130.00
25 Besi Beton Polos Ø10 mm - Kg 5,938.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
26 Besi Beton Polos Ø 12 mm - Kg 5,919.00
27 Besi Beton Polos Ø 16 mm - Kg 15,471.00
28 Besi Beton Ulir o 10 mm - Kg 34,125.00
29 Besi Beton Ulir o 12 mm - Kg 70,875.00
30 Besi Beton Ulir o 16 mm - Kg 117,375.00
31 Box sekring f 4" Pabrikan Bh 15,000.00
32 BRC T (90, 120, 150) 3m lbr 227,500.00
33 Bubungan Multiroof Sakura lbr 27,000.00
34 Bubungan Genteng Beton Pabrikan Bh 7,500.00
35 Cat Kayu Dasar Altex Kg 15,500.00
36 Cat Kayu Mengkilap Altex Kg 25,750.00
37 Cat Tembok merk Bell Mas Bell Mas Kg 26,000.00
38 Cat Tembok merk Altex Altex Kg 7,000.00
39 Dolken Ø 8 mm/4 m - Btg 2,000.00
40 Dumpul Altex Kg 46,500.00
41 Embol Box Pabrikan Bh 625.00
42 Engsel Pintu Merk Everbst Pabrikan Bh 11,875.00
43 Expagnolet/grendel pintu tanam Pabrikan Bh 25,000.00
44 Filer abu batu Pabrikan m3 475,000.00
45 Fitting tempel biasa Pabrikan Bh 2,250.00
46 Floor Drain Stainles Steel Pabrikan Set 18,750.00
47 Grendel pintu Pabrikan Bh 17,500.00
48 Grendel Jendela Pabrikan psg 12,250.00
49 Isolasi Listrik Pabrikan roll 3,000.00
50 Kabel NYY 1.5 mm Pabrikan m1 3,375.00
51 Kaca Bening 3 mm Pabrikan m2 47,500.00
52 Kaca Bening 5 mm Pabrikan m2 61,250.00
53 Kaca Bening 8 mm Pabrikan m2 165,000.00
54 Kaca Es 3 mm Pabrikan m2 40,250.00
55 Kaca Rayband 3 mm 60% m2 55,000.00
56 Kaca Rayband 5 mm 60% m2 68,750.00
57 Kait angin jendela Pabrikan Bh 8,250.00
58 Kait angin pintu Pabrikan Bh 22,500.00
59 Kapur padam - m3 300,000.00
60 Kawat Anyaman 5 cm Pabrikan Kg 10,000.00
61 Kawat Beton Pabrikan Kg 11,250.00
62 Kayu kls I Balok (Bayam) f 2" Bayam m3 4,625,000.00
63 Kayu kls I Usuk (Bayam) f3" Bayam m3 5,500,000.00
64 Kayu kls I Reng (Bayam) f 4" Bayam m3 5,500,000.00
65 Kayu kls I Papan Tipis (Bayam) f6" Bayam m3 5,750,000.00
66 Kayu kls I Papan Tebal (Bayam) Bayam m3 6,000,000.00
67 Kayu kls II Balok f4" - m3 1,825,000.00
68 Kayu kls II Usuk f6" - m3 1,825,000.00
69 Kayu kls II Reng - m3 1,900,000.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
70 Kayu kls II papan tipis - m3 1,775,000.00
71 Kayu kls II papan tebal - m3 2,350,000.00
72 Keramik putih 40 x 40 cm m2 Bh 6,700.00
73 Keramik putih 30 x 30 cm m2 Bh 2,835.00
74 Keramik putih 20 x 20 cm m2 Bh 1,580.00
75 Kertas Pasir Besi Pabrikan lbr 2,750.00
76 Kertas Pasir Kayu Pabrikan lbr 2,250.00
77 Klem Kabel Pabrikan Bh 8,000.00
78 Kloset Jongkok Merk INA f 20 mm Pabrikan Bh 97,500.00
79 Kran air Stainlesstel f 25 mm Pabrikan Unit 42,500.00
80 Kunci Pintu Merk Top Pabrikan Bh 35,000.00
81 Kunci Pintu Merk Valencia 2x putar Pabrikan Bh 92,500.00
82 Kunci Pintu Merk Yuri 2x putar Pabrikan Bh 137,500.00
83 Kunci lemari dinding Pabrikan Bh 5,000.00
84 Kunci Alfa Pabrikan Bh 67,500.00
85 Kwas Pabrikan Bh 4,500.00
86 Lampu TL 40 watt merk Philips Philips Bh 14,000.00
87 Lampu TL 40 watt merk Philips Lengkap Philips Bh 64,000.00
88 Lampu TL 20 watt merk Philips Lengkap Philips Bh 56,500.00
89 Lampu TL Bundar 20 watt Pabrikan Bh 28,000.00
90 Lampu Pijar 40/60 watt merk Philips Philips Bh 3,900.00
91 Lampu Pijar 25 watt Pabrikan Bh 3,250.00
92 Lem Weber putih Kg 20,000.00
93 Lem Weber kuning Kg 30,000.00
94 List profil kayu Pabrikan m1 17,500.00
95 List Kaca Pabrikan m1 2,000.00
96 List Plafond Multipleks 6 mm Pabrikan m1 6,250.00
97 List Profil Gypsum Pabrikan m1 23,000.00
98 L Joint PVC Ǿ 2 " Pabrikan Bh 9,000.00
99 L Joint PVC Ǿ 3 " Pabrikan Bh 25,000.00
100 L Joint PVC Ǿ 4 " Pabrikan Bh 30,000.00
101 MCB Pabrikan Bh 27,500.00
102 Menie Kayu / Seng Altex Kg 46,750.00
103 Minyak Cat Super liter 6,750.00
104 Minyak Tanah - liter 2,500.00
105 Nako Lengkap ( 7 ssr ) Pabrikan set 92,750.00
106 Oli - liter 13,000.00
107 Paku halus (2-5 cm) Pabrikan Kg 12,500.00
108 Paku 5s /d 12 cm Pabrikan Kg 8,500.00
109 Paku Beton Halus (2 - 5 cm) Pabrikan Kg 16,250.00
110 Paku Seng Pabrikan Kg 28,250.00
111 Paku Beton 5 s / d 12 cm Pabrikan Kg 14,450.00
112 Paku Tripleks Pabrikan Kg 14,750.00
113 Paku Alumanium Pabrikan Kg 14,550.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
114 Paku Skrup Halus Pabrikan Kg 3,000.00
115 Paku Skrup Kasar Pabrikan Kg 10,000.00
116 Papan Gypsum Pabrikan lbr 49,000.00
117 Pasir Pasang - m3 95,833.00
118 Pasir Beton - m3 125,333.00
119 Pasir Urugan - m3 75,000.00
120 Paving Stone warna Pabrikan Bh 1,050.00
121 Pegangan Pintu Pabrikan Bh 75,000.00
122 Pegangan Jendela Pabrikan Bh 10,000.00
123 Pipa GIP MEDIUM B Ø 1/2 " 6m m 66,550.00
124 Pipa GIP MEDIUM B Ø 3/4 " 6m m 81,300.00
125 Pipa GIP MEDIUM B Ø 1" 6m m 116,450.00
126 Pipa GIP MEDIUM B Ø 1 1/2 " 6m m 365,300.00
127 Pipa GIP MEDIUM B Ø 2" 6m m 237,850.00
128 Pipa GIP MEDIUM B Ø 3 " 6m m 369,800.00
129 Pipa GIP MEDIUM B Ø 4 " 6m m 730,250.00
130 Pipa PVC Ǿ 2 " Pabrikan Btg 27,500.00
131 Pipa PVC Ǿ 3 " Pabrikan Btg 42,500.00
132 Pipa PVC Ǿ 4 " Pabrikan Btg 75,000.00
133 Pipa PVC 0.5" untuk listrik Pabrikan m1 4,500.00
134 Pipa Penguras Bak Mandi f 40 mm Pabrikan Unit 17,500.00
135 Plamuur Pabrikan Kg 33,500.00
136 Plamuur Tembok Pedang Pabrikan Kg 25,000.00
137 Plat Jepit 2 x 50.5 Pabrikan Kg 11,250.00
138 Plat inventarisasi jembatan (Marmer) - Bh 775,000.00
139 Plint Keramik 10 x 30 cm - Bh 1,350.00
140 Politur Pabrikan liter 32,500.00
141 Rangka Nako Pabrikan m2 7,750.00
142 Reducer Ǿ 4"3" Pabrikan Bh 7,500.00
143 Residu/Teer Pabrikan liter 75,000.00
144 Rool cat Pabrikan Bh 13,750.00
145 Saklar Tunggal merk Broco f 20 mm Broco Bh 10,750.00
146 Saklar Ganda merk Broco f 40 mm Broco Bh 14,250.00
147 Saklar Triple merk KJ Pabrikan Bh 13,250.00
148 Sekring cast 3 grup f 15 mm Pabrikan Bh 14,000.00
149 Semen Kupang (portland) - Kg 650.00
150 Semen Tonasa - Kg 706.00
151 Semen Bosowa - Kg 706.00
152 Semen Warna Kg Kg 2,050.00
153 Seng Gelombang BJLS 0.30 mm Gajahcalisco lbr 54,000.00
154 Seng Bubungan BJLS 0.30 mm Gajahcalisco lbr 33,750.00
155 Seng Plat BJLS 0.30 mm (60 cm) 60 cm lbr 21,500.00
156 Seng Plat BJLS 0.30 mm (90 cm) 90 cm lbr 30,000.00
157 Seng Gelombang BJLS 0.20 mm Gajahcalisco lbr 33,750.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
158 Seng Bubungan BJLS 0.20 mm Gajahcalisco lbr 28,250.00
159 Seng Plat BJLS 0.20 mm (60 cm) 60 cm lbr 11,675.00
160 Seng Plat BJLS 0.20 mm (90 cm) 90 cm lbr 13,650.00
161 Sirtu - m3 79,167.00
162 Socket Ǿ 3" Pabrikan Bh 6,750.00
163 Socket Ǿ 4" Pabrikan Bh 8,000.00
164 Stop Kontak merk Broco Broco Bh 12,750.00
165 Tanah Urug - m3 65,000.00
166 Tangki Fibre Glass 2.2 m3 Pabrikan Bh 1,150,000.00
167 Teakwood 3.8 mm Pabrikan lbr 82,250.00
168 Teakwood 2.8 mm Pabrikan lbr 70,000.00
169 Tegel Porselin - Buah 2,909.00
170 Tegel Mozaik - Buah 3,750.00
171 T Joint PVC Ǿ 2 " Pabrikan Bh 5,500.00
172 T Joint PVC Ǿ 3" Pabrikan Bh 8,750.00
173 T Joint PVC Ǿ 4 " Pabrikan Bh 12,500.00
174 Tripleks 9 mm Pabrikan lbr 108,750.00
175 Tripleks 2.8 mm Pabrikan lbr 44,500.00
176 Tripleks 3.8 mm Pabrikan lbr 56,250.00
177 Tripleks 6.0 mm Pabrikan lbr 77,500.00
178 Tripleks lapis aluminium foil Pabrikan lbr 70,000.00
179 Tripleks lapis melamine Pabrikan lbr 70,000.00
180 Wastafel f 75 mm Pabrikan Unit 162,500.00
DAFTAR HARGA UPAH TENAGA KERJA
UPAH
NO. NAMA TENAGA KERJA SATUAN
(Rp)
b. Tenaga
Pekerja 0.100 Oh x Rp. 25,000.00 ,- = Rp. 2,500.00 ,-
Tukang kayu 0.100 Oh x Rp. 40,000.00 ,- = Rp. 4,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.005 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Sub Jumlah (2) ,- = Rp. 7,175.00 ,-
Jumlah (1) + (2) ,- = Rp. 41,670.00 ,-
b. Tenaga
Pekerja 0.300 Oh x Rp. 25,000.00 ,- = Rp. 25,000.30 ,-
Mandor 0.010 Oh x Rp. 45,000.00 ,- = Rp. 45,000.01 ,-
Sub Jumlah (2) = Rp. 70,000.31 ,-
Jumlah (1) + (2) = Rp. 160,000.31 ,-
b. Tenaga
Pekerja 1.500 Oh x Rp. 25,000.00 ,- = Rp. 37,500.00 ,-
Tukang batu 0.600 Oh x Rp. 40,000.00 ,- = Rp. 24,000.00 ,-
Kepala tukang 0.060 Oh x Rp. 45,000.00 ,- = Rp. 2,700.00 ,-
Mandor 0.075 Oh x Rp. 45,000.00 ,- = Rp. 3,375.00 ,-
Sub Jumlah (2) = Rp. 67,575.00 ,-
Jumlah (1) + (2) = Rp. 286,941.85 ,-
6). 1 m3 Pasangan Pondasi Batu Kosong (Aanstamping)
a. Bahan
Batu belah 15/20 cm 1.200 M3 x Rp. 71,667.00 ,- = Rp. 86,000.40 ,-
Pasir urug 0.300 M3 x Rp. 75,000.00 ,- = Rp. 22,500.00 ,-
Sub Jumlah (1) ,- = Rp. 108,500.40 ,-
b. Tenaga
Pekerja 0.780 Oh x Rp. 25,000.00 ,- = Rp. 19,500.00 ,-
Tukang batu 0.390 Oh x Rp. 40,000.00 ,- = Rp. 15,600.00 ,-
Kepala tukang 0.039 Oh x Rp. 45,000.00 ,- = Rp. 1,755.00 ,-
Mandor 0.039 Oh x Rp. 45,000.00 ,- = Rp. 1,755.00 ,-
Sub Jumlah (2) = Rp. 38,610.00 ,-
Jumlah (1) + (2) = Rp. 147,110.40 ,-
b. Tenaga
Pekerja 0.320 Oh x Rp. 25,000.00 ,- = Rp. 8,000.00 ,-
Tukang batu 0.100 Oh x Rp. 40,000.00 ,- = Rp. 4,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Sub Jumlah (2) = Rp. 13,125.00 ,-
Jumlah (1) + (2) = Rp. 61,298.82 ,-
b. Tenaga
Pekerja 0.320 Oh x Rp. 25,000.00 ,- = Rp. 8,000.000 ,-
Tukang batu 0.100 Oh x Rp. 40,000.00 ,- = Rp. 4,000.000 ,-
Kepala tukang 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.000 ,-
Mandor 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.000 ,-
Sub Jumlah (2) = Rp. 13,125.000 ,-
Jumlah (1) + (2) = Rp. 58,729.49 ,-
b. Tenaga
Pekerja 0.200 Oh x Rp. 25,000.00 ,- = Rp. 5,000.000 ,-
Tukang batu 0.150 Oh x Rp. 40,000.00 ,- = Rp. 6,000.000 ,-
Kepala tukang 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.000 ,-
Mandor 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.000 ,-
Sub Jumlah (2) = Rp. 12,125.000 ,-
Jumlah (1) + (2) = Rp. 18,157.827 ,-
10). 1 m2 Plesteran Tembok Biasa 1 Pc : 5 Ps, tebal 15 mm
a. Bahan
Semen portland 4.320 Kg x Rp. 650.00 ,- = Rp. 2,808.00 ,-
Pasir pasang 0.022 M3 x Rp. 95,833.00 ,- = Rp. 2,108.33 ,-
Sub Jumlah (1) ,- = Rp. 4,916.33 ,-
b. Tenaga
Pekerja 0.200 Oh x Rp. 25,000.00 ,- = Rp. 5,000.00 ,-
Tukang batu 0.150 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Sub Jumlah (2) = Rp. 12,125.00 ,-
Jumlah (1) + (2) = Rp. 17,041.33 ,-
b. Tenaga
Pekerja 0.200 Oh x Rp. 25,000.00 ,- = Rp. 5,000.00 ,-
Tukang batu 0.150 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Sub Jumlah (2) = Rp. 12,125.00 ,-
Jumlah (1) + (2) = Rp. 15,705.95 ,-
b. Tenaga
Pekerja 0.200 Oh x Rp. 25,000.00 ,- = Rp. 5,000.00 ,-
Tukang batu 0.150 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Sub Jumlah (2) = Rp. 12,125.00 ,-
Jumlah (1) + (2) = Rp. 17,041.33 ,-
13). 1m3 Membuat sloof & Ringbalk beton bertulang (150 kg besi + bekesting)
a. Bahan
Kayu terentang 0.270 M3 x Rp. 1,775,000.00 ,- = Rp. 479,250.00 ,-
Paku biasa 2"-5" 2.000 Kg x Rp. 8,500.00 ,- = Rp. 17,000.00 ,-
Minyak bekesting 0.600 lt x Rp. 13,000.00 ,- = Rp. 7,800.00 ,-
Besi beton polos 150.000 Kg x Rp. 5,919.00 ,- = Rp. 887,850.00 ,-
Kawat beton 3.000 Kg x Rp. 11,250.00 ,- = Rp. 33,750.00 ,-
Semen portland 323.000 Kg x Rp. 650.00 ,- = Rp. 209,950.00 ,-
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16 ,-
Koral beton 0.780 M3 x Rp. 187,500.00 ,- = Rp. 146,250.00 ,-
Sub Jumlah (1) = Rp. 1,847,023.16 ,-
b. Tenaga
Pekerja 4.850 Oh x Rp. 25,000.00 ,- = Rp. 121,250.00 ,-
Tukang batu 0.350 Oh x Rp. 40,000.00 ,- = Rp. 14,000.00 ,-
Tukang kayu 1.560 Oh x Rp. 40,000.00 ,- = Rp. 62,400.00 ,-
Tukang besi 1.400 Oh x Rp. 40,000.00 ,- = Rp. 56,000.00 ,-
Kepala tukang 0.331 Oh x Rp. 45,000.00 ,- = Rp. 14,895.00 ,-
Mandor 0.175 Oh x Rp. 45,000.00 ,- = Rp. 7,875.00 ,-
Sub Jumlah (2) = Rp. 276,420.00 ,-
Jumlah (1) + (2) = Rp. 2,123,443.16 ,-
14). 1m3 Membuat kolom beton bertulang (200 kg besi + bekesting)
a. Bahan
Kayu terentang 0.400 M3 x Rp. 1,775,000.00 ,- = Rp. 710,000.00 ,-
Paku biasa 2"-5" 4.000 Kg x Rp. 8,500.00 ,- = Rp. 34,000.00 ,-
Minyak bekesting 2.000 lt x Rp. 13,000.00 ,- = Rp. 26,000.00 ,-
Besi beton polos 200.000 Kg x Rp. 5,919.00 ,- = Rp. 1,183,800.00 ,-
Kawat beton 4.500 Kg x Rp. 11,250.00 ,- = Rp. 50,625.00 ,-
Semen portland 323.000 Kg x Rp. 650.00 ,- = Rp. 209,950.00 ,-
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16 ,-
Koral beton 0.780 M3 x Rp. 187,500.00 ,- = Rp. 146,250.00 ,-
Kayu borneo balok 0.150 M3 x Rp. 1,825,000.00 ,- = Rp. 273,750.00 ,-
Tripleks 2.8 mm 3.500 lbr x Rp. 44,500.00 ,- = Rp. 155,750.00 ,-
Dolken Ø 8cm/4m 20.000 btg x Rp. 2,000.00 ,- = Rp. 40,000.00 ,-
Sub Jumlah (1) = Rp. 2,895,298.16 ,-
b. Tenaga
Pekerja 7.300 Oh x Rp. 25,000.00 ,- = Rp. 182,500.00 ,-
Tukang batu 0.350 Oh x Rp. 40,000.00 ,- = Rp. 14,000.00 ,-
Tukang kayu 3.300 Oh x Rp. 40,000.00 ,- = Rp. 132,000.00 ,-
Tukang besi 2.100 Oh x Rp. 40,000.00 ,- = Rp. 84,000.00 ,-
Kepala tukang 0.570 Oh x Rp. 45,000.00 ,- = Rp. 25,650.00 ,-
Mandor 0.250 Oh x Rp. 45,000.00 ,- = Rp. 11,250.00 ,-
Sub Jumlah (2) = Rp. 449,400.00 ,-
Jumlah (1) + (2) = Rp. 3,344,698.16 ,-
b. Tenaga
Pekerja 5.600 Oh x Rp. 25,000.00 ,- = Rp. 140,000.00
Tukang batu 0.350 Oh x Rp. 40,000.00 ,- = Rp. 14,000.00
Tukang kayu 2.300 Oh x Rp. 40,000.00 ,- = Rp. 92,000.00 ,-
Tukang besi 1.400 Oh x Rp. 40,000.00 ,- = Rp. 56,000.00 ,-
Kepala tukang 0.405 Oh x Rp. 45,000.00 ,- = Rp. 18,225.00 ,-
Mandor 0.202 Oh x Rp. 45,000.00 ,- = Rp. 9,090.00 ,-
Sub Jumlah (2) = Rp. 329,315.00 ,-
Jumlah (1) + (2) = Rp. 2,783,963.16 ,-
b. Tenaga
Pekerja 6.000 Oh x Rp. 25,000.00 ,- = Rp. 150,000.00 ,-
Tukang kayu 20.000 Oh x Rp. 40,000.00 ,- = Rp. 800,000.00 ,-
Kepala tukang 2.000 Oh x Rp. 45,000.00 ,- = Rp. 90,000.00 ,-
Mandor 0.300 Oh x Rp. 45,000.00 ,- = Rp. 13,500.00 ,-
Sub Jumlah (2) = Rp. 1,053,500.00 ,-
Jumlah (1) + (2) = Rp. 6,141,000.00 ,-
b. Tenaga
Pekerja 0.600 Oh x Rp. 25,000.00 ,- = Rp. 15,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 40,000.00 ,- = Rp. 80,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 45,000.00 ,- = Rp. 9,000.00 ,-
Mandor 0.030 Oh x Rp. 45,000.00 ,- = Rp. 1,350.00 ,-
Sub Jumlah (2) = Rp. 105,350.00 ,-
Jumlah (1) + (2) = Rp. 192,700.75 ,-
b. Tenaga
Pekerja 0.600 Oh x Rp. 25,000.00 ,- = Rp. 15,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 40,000.00 ,- = Rp. 80,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 45,000.00 ,- = Rp. 9,000.00 ,-
Mandor 0.030 Oh x Rp. 45,000.00 ,- = Rp. 1,350.00 ,-
Sub Jumlah (2) = Rp. 105,350.00 ,-
Jumlah (1) + (2) = Rp. 197,437.30 ,-
b. Tenaga
Pekerja 1.000 Oh x Rp. 25,000.00 ,- = Rp. 25,000.00 ,-
Tukang kayu 2.500 Oh x Rp. 40,000.00 ,- = Rp. 100,000.00 ,-
Kepala tukang 0.250 Oh x Rp. 45,000.00 ,- = Rp. 11,250.00 ,-
Mandor 0.050 Oh x Rp. 45,000.00 ,- = Rp. 2,250.00 ,-
Sub Jumlah (2) = Rp. 138,500.00 ,-
Jumlah (1) + (2) = Rp. 378,500.00 ,-
21). 1 m3 Pasang konstruksi kuda - kuda/ kayu kelas II
a. Bahan
Kayu borneo 1.1000 M3 x Rp. 1,825,000.00 ,- = Rp. 2,007,500.00 ,-
Besi strip 15.0000 Kg x Rp. 10,000.00 ,- = Rp. 150,000.00 ,-
Paku baisa 2" - 5" 0.8000 Kg x Rp. 8,500.00 ,- = Rp. 6,800.00 ,-
Sub Jumlah (1) ,- = Rp. 2,164,300.00 ,-
b. Tenaga
Pekerja 4.000 Oh x Rp. 25,000.00 ,- = Rp. 100,000.00 ,-
Tukang kayu 12.000 Oh x Rp. 40,000.00 ,- = Rp. 480,000.00 ,-
Kepala tukang 1.200 Oh x Rp. 45,000.00 ,- = Rp. 54,000.00 ,-
Mandor 0.200 Oh x Rp. 45,000.00 ,- = Rp. 9,000.00 ,-
Sub Jumlah (2) = Rp. 643,000.00 ,-
Jumlah (1) + (2) = Rp. 2,807,300.00 ,-
b. Tenaga
Pekerja 0.100 Oh x Rp. 25,000.00 ,- = Rp. 2,500.00 ,-
Tukang kayu 0.200 Oh x Rp. 40,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.025 Oh x Rp. 45,000.00 ,- = Rp. 1,125.00 ,-
Mandor 0.005 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Sub Jumlah (2) = Rp. 11,850.00 ,-
Jumlah (1) + (2) = Rp. 29,195.00 ,-
b. Tenaga
Pekerja 0.800 Oh x Rp. 25,000.00 ,- = Rp. 20,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 40,000.00 ,- = Rp. 80,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 45,000.00 ,- = Rp. 9,000.00 ,-
Mandor 0.040 Oh x Rp. 45,000.00 ,- = Rp. 1,800.00 ,-
Sub Jumlah (1b) = Rp. 110,800.00 ,-
Sub Jumlah (1) + (2) = Rp. 320,800.00 ,-
b. Tenaga
Pekerja 0.015 Oh x Rp. 25,000.00 ,- = Rp. 375.00 ,-
Tukang ka yu 0.150 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.00075 Oh x Rp. 45,000.00 ,- = Rp. 33.75 ,-
Sub Jumlah (2) = Rp. 7,083.75 ,-
Sub Jumlah (1) + (2) = Rp. 67,583.75 ,-
Jumlah (1) + (2) = Rp. 388,383.75 ,-
25). 1 m2 Memasang Atap Seng Gelombang BJLS 0.30 mm
a. Bahan
Seng gelombang 3" x 6" bjls 28 0.7000 Lbr x Rp. 54,000.00 ,- = Rp. 37,800.00 ,-
Paku biasa 1/2" - 1" 0.0200 Kg x Rp. 28,250.00 ,- = Rp. 565.00 ,-
Sub Jumlah (1) ,- = Rp. 38,365.00 ,-
b. Tenaga
Pekerja 0.120 Oh x Rp. 25,000.00 ,- = Rp. 3,000.00 ,-
Tukang kayu 0.060 Oh x Rp. 40,000.00 ,- = Rp. 2,400.00 ,-
Kepala tukang 0.006 Oh x Rp. 45,000.00 ,- = Rp. 270.00 ,-
Mandor 0.006 Oh x Rp. 45,000.00 ,- = Rp. 270.00 ,-
Sub Jumlah (2) = Rp. 5,940.00 ,-
Jumlah (1) + (2) = Rp. 44,305.00 ,-
b Tenaga
Pekerja 0.150 Oh x Rp. 25,000.00 ,- = Rp. 3,750.00 ,-
Tukang kayu 0.070 Oh x Rp. 40,000.00 ,- = Rp. 2,800.00 ,-
Kepala tukang 0.008 Oh x Rp. 45,000.00 ,- = Rp. 360.00 ,-
Mandor 0.008 Oh x Rp. 45,000.00 ,- = Rp. 360.00 ,-
Sub Jumlah (2) = Rp. 7,270.00 ,-
Jumlah (1) + (2) = Rp. 18,525.00 ,-
b Tenaga
Pekerja 0.150 Oh x Rp. 25,000.00 ,- = Rp. 3,750.00 ,-
Tukang kayu 0.070 Oh x Rp. 40,000.00 ,- = Rp. 2,800.00 ,-
Kepala tukang 0.008 Oh x Rp. 45,000.00 ,- = Rp. 360.00 ,-
Mandor 0.008 Oh x Rp. 45,000.00 ,- = Rp. 360.00 ,-
Sub Jumlah (1b) = Rp. 7,270.00 ,-
Jumlah (1) = Rp. 50,520.00 ,-
2). 1m2 Pasang langit - langit tripleks (30 x 60) cm, tebal 4 mm
a. Bahan
Tripleks 4 mm 0.3600 Lbr x Rp. 56,250.00 ,- = Rp. 20,250.00 ,-
Paku 0.0300 Kg x Rp. 12,500.00 ,- = Rp. 375.00 ,-
Sub Jumlah (1) ,- = Rp. 20,625.00 ,-
b. Tenaga
Pekerja 0.0700 Oh x Rp. 25,000.00 ,- = Rp. 1,750.00 ,-
Tukang kayu 0.1000 Oh x Rp. 40,000.00 ,- = Rp. 4,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.0035 Oh x Rp. 45,000.00 ,- = Rp. 157.50 ,-
Sub Jumlah (2) = Rp. 6,357.50 ,-
Jumlah (1) + (2) = Rp. 26,982.50 ,-
Jumlah (1) + (2) = Rp. 77,502.50 ,-
28). 1 m1 List plafond - kayu profil
a. Bahan
Kayu profil 1.050 M x Rp. 6,250.00 ,- = Rp. 6,562.50 ,-
Sub Jumlah (1) ,- = Rp. 6,562.50 ,-
b. Tenaga
Pekerja 0.021 Oh x Rp. 25,000.00 ,- = Rp. 525.00 ,-
Tukang kayu 0.021 Oh x Rp. 40,000.00 ,- = Rp. 840.00 ,-
Kepala tukang 0.002 Oh x Rp. 45,000.00 ,- = Rp. 90.00 ,-
Mandor 0.001 Oh x Rp. 45,000.00 ,- = Rp. 45.00 ,-
Sub Jumlah (2) = Rp. 1,500.00 ,-
Jumlah (1) + (2) = Rp. 8,062.50 ,-
b. Tenaga
Pekerja 0.2500 Oh x Rp. 25,000.00 ,- = Rp. 6,250.00 ,-
Tukang batu 0.1200 Oh x Rp. 40,000.00 ,- = Rp. 4,800.00 ,-
Kepala tukang 0.0120 Oh x Rp. 45,000.00 ,- = Rp. 540.00 ,-
Mandor 0.0125 Oh x Rp. 45,000.00 ,- = Rp. 562.50 ,-
Sub Jumlah (2) = Rp. 12,152.50 ,-
Jumlah (1) + (2) = Rp. 52,820.66 ,-
b. Tenaga
Pekerja 0.2500 Oh x Rp. 25,000.00 ,- = Rp. 6,250.00 ,-
Tukang batu 0.1200 Oh x Rp. 40,000.00 ,- = Rp. 4,800.00 ,-
Kepala tukang 0.0120 Oh x Rp. 45,000.00 ,- = Rp. 540.00 ,-
Mandor 0.0125 Oh x Rp. 45,000.00 ,- = Rp. 562.50 ,-
Sub Jumlah (2) = Rp. 12,152.50 ,-
Jumlah (1) + (2) = Rp. 62,885.66 ,-
b. Tenaga
Pekerja 0.0900 Oh x Rp. 25,000.00 ,- = Rp. 2,250.00 ,-
Tukang batu 0.0900 Oh x Rp. 40,000.00 ,- = Rp. 3,600.00 ,-
Kepala tukang 0.0090 Oh x Rp. 45,000.00 ,- = Rp. 405.00 ,-
Mandor 0.0045 Oh x Rp. 45,000.00 ,- = Rp. 202.50 ,-
Sub Jumlah (2) = Rp. 6,457.50 ,-
Jumlah (1) + (2) = Rp. 14,791.67 ,-
32). 1 m2 Memasang Tegel Porselin 20 x 20 cm, warna
a. Bahan
Porselin 20x20 cm warna 25.000 Bh x Rp. 1,580.00 ,- = Rp. 39,500.00 ,-
Semen abu-abu 9.300 Kg x Rp. 650.00 ,- = Rp. 6,045.00 ,-
Pasir pasang 0.018 M3 x Rp. 95,833.00 ,- = Rp. 1,724.99 ,-
Semen warna 1.500 Kg x Rp. 2,050.00 ,- = Rp. 3,075.00 ,-
Sub Jumlah (1) ,- = Rp. 50,344.99 ,-
b. Tenaga
Pekerja 0.0900 Oh x Rp. 25,000.00 ,- = Rp. 2,250.00 ,-
Tukang batu 0.0900 Oh x Rp. 40,000.00 ,- = Rp. 3,600.00 ,-
Kepala tukang 0.0090 Oh x Rp. 45,000.00 ,- = Rp. 405.00 ,-
Mandor 0.0045 Oh x Rp. 45,000.00 ,- = Rp. 202.50 ,-
Sub Jumlah (2) = Rp. 6,457.50 ,-
Jumlah (1) + (2) = Rp. 56,802.49 ,-
b. Tenaga
Pekerja 1.000 Oh x Rp. 25,000.00 ,- = Rp. 25,000.00 ,-
Tukang batu 1.500 Oh x Rp. 40,000.00 ,- = Rp. 60,000.00 ,-
Kepala tukang 1.500 Oh x Rp. 45,000.00 ,- = Rp. 67,500.00 ,-
Mandor 0.160 Oh x Rp. 45,000.00 ,- = Rp. 7,200.00 ,-
Sub Jumlah (2) = Rp. 159,700.00 ,-
Jumlah (1) + (2) = Rp. 262,058.33 ,-
34). 1 Bh Wastafel
a. Bahan
Wastafel 1.000 Bh x Rp. 162,500.00 ,- = Rp. 162,500.00 ,-
Semen abu-abu 6.000 Kg x Rp. 650.00 ,- = Rp. 3,900.00 ,-
Pasir pasang 0.010 M3 x Rp. 95,833.00 ,- = Rp. 958.33 ,-
Sub Jumlah (1) ,- = Rp. 167,358.33
b. Tenaga
Pekerja 1.200 Oh x Rp. 25,000.00 ,- = Rp. 30,000.00 ,-
Tukang batu 1.450 Oh x Rp. 40,000.00 ,- = Rp. 58,000.00 ,-
Kepala tukang 0.150 Oh x Rp. 45,000.00 ,- = Rp. 6,750.00 ,-
Mandor 0.100 Oh x Rp. 45,000.00 ,- = Rp. 4,500.00 ,-
Sub Jumlah (2) = Rp. 99,250.00 ,-
Jumlah (1) + (2) = Rp. 266,608.33 ,-
b. Tenaga
Pekerja 2.100 Oh x Rp. 25,000.00 ,- = Rp. 52,500.00 ,-
Tukang batu 0.750 Oh x Rp. 40,000.00 ,- = Rp. 30,000.00 ,-
Kepala tukang 0.070 Oh x Rp. 45,000.00 ,- = Rp. 3,150.00 ,-
Mandor 0.110 Oh x Rp. 45,000.00 ,- = Rp. 4,950.00 ,-
Sub Jumlah (2) = Rp. 90,600.00 ,-
Jumlah (1) + (2) = Rp. 365,458.33 ,-
36). 1 Bh Kran air
a. Bahan
Kran air 1.000 Bh x Rp. 42,500.00 ,- = Rp. 42,500.00 ,-
Seal tape 0.025 Bh x Rp. 6,000.00 ,- = Rp. 150.00 ,-
Sub Jumlah (1) ,- = Rp. 42,650.00 ,-
b. Tenaga
Pekerja 0.010 Oh x Rp. 25,000.00 ,- = Rp. 250.00 ,-
Tukang batu 0.100 Oh x Rp. 40,000.00 ,- = Rp. 4,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.005 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Sub Jumlah (2) = Rp. 4,925.00 ,-
Jumlah (1) + (2) = Rp. 47,575.00 ,-
37). 1 Bh Floor drain
a. Bahan
Floor drain 1.000 Bh x Rp. 18,750.00 ,- = Rp. 18,750.00 ,-
Sub Jumlah (1) ,- = Rp. 18,750.00 ,-
b. Tenaga
Pekerja 0.010 Oh x Rp. 25,000.00 ,- = Rp. 250.00 ,-
Tukang batu 0.100 Oh x Rp. 40,000.00 ,- = Rp. 4,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.005 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Sub Jumlah (2) = Rp. 4,925.00 ,-
Jumlah (1) + (2) = Rp. 23,675.00 ,-
38). 1 m2 Pengecatan tembok baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
a Bahan
Plamir 0.100 Kg x Rp. 25,000.00 ,- = Rp. 2,500.00 ,-
Cat dasar 0.100 Kg x Rp. 15,500.00 ,- = Rp. 1,550.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 25,750.00 ,- = Rp. 6,695.00 ,-
Sub Jumlah (1) ,- = Rp. 10,745.00 ,-
b Tenaga
Pekerja 0.0200 Oh x Rp. 25,000.00 ,- = Rp. 500.00 ,-
Tukang cat 0.0630 Oh x Rp. 35,000.00 ,- = Rp. 2,205.00 ,-
Kepala tukang 0.0063 Oh x Rp. 45,000.00 ,- = Rp. 283.50 ,-
Mandor 0.0025 Oh x Rp. 45,000.00 ,- = Rp. 112.50 ,-
Sub Jumlah (2) = Rp. 3,101.00 ,-
Jumlah (1) + (2) = Rp. 13,846.00 ,-
39). 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
a. Bahan
Cat meni 0.200 Kg x Rp. 46,750.00 ,- = Rp. 9,350.00 ,-
Plamir 0.150 Kg x Rp. 25,000.00 ,- = Rp. 3,750.00 ,-
Cat dasar 0.17 Kg x Rp. 15,500.00 ,- = Rp. 2,635.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 25,750.00 ,- = Rp. 6,695.00 ,-
Sub Jumlah (1) ,- = Rp. 22,430.00 ,-
b. Tenaga
Pekerja 0.0700 Oh x Rp. 25,000.00 ,- = Rp. 1,750.00 ,-
Tukang cat 0.0090 Oh x Rp. 35,000.00 ,- = Rp. 315.00 ,-
Kepala tukang 0.0060 Oh x Rp. 45,000.00 ,- = Rp. 270.00 ,-
Mandor 0.0025 Oh x Rp. 45,000.00 ,- = Rp. 112.50 ,-
Sub Jumlah (2) = Rp. 2,447.50 ,-
Jumlah (1) + (2) = Rp. 24,877.50 ,-
40). 1 m2 Pelaburan bidang kayu dengan teak oil
a. Bahan
Teak oil 0.360 Ltr x Rp. 13,000.00 ,- = Rp. 4,680.00 ,-
Sub Jumlah (1) ,- = Rp. 4,680.00 ,-
b. Tenaga
Pekerja 0.0400 Oh x Rp. 25,000.00 ,- = Rp. 1,000.00 ,-
Tukang cat 0.0630 Oh x Rp. 35,000.00 ,- = Rp. 2,205.00 ,-
Kepala tukang 0.0630 Oh x Rp. 45,000.00 ,- = Rp. 2,835.00 ,-
Mandor 0.0025 Oh x Rp. 45,000.00 ,- = Rp. 112.50 ,-
Sub Jumlah (2) = Rp. 6,152.50 ,-
Jumlah (1) + (2) = Rp. 10,832.50 ,-
41) 1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat muktahir
dengan tebal 200um
a. Bahan
Cat 0.300 Kg x Rp. 26,000.00 ,- = Rp. 7,800.00 ,-
Sub Jumlah (1) ,- = Rp. 7,800.00 ,-
b. Tenaga
Pekerja 0.0060 Oh x Rp. 25,000.00 ,- = Rp. 150.00 ,-
Tukang cat 0.0600 Oh x Rp. 35,000.00 ,- = Rp. 2,100.00 ,-
Kepala tukang 0.0120 Oh x Rp. 45,000.00 ,- = Rp. 540.00 ,-
Mandor 0.0060 Oh x Rp. 45,000.00 ,- = Rp. 270.00 ,-
Sub Jumlah (2) = Rp. 3,060.00 ,-
Jumlah (1) + (2) = Rp. 10,860.00 ,-
b. Tenaga
Pekerja 0.0150 Oh x Rp. 25,000.00 ,- = Rp. 375.00 ,-
Tukang kayu 0.1500 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.0150 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.00075 Oh x Rp. 45,000.00 ,- = Rp. 33.75 ,-
Sub Jumlah (1b) = Rp. 7,083.75 ,-
Sub Jumlah (1) = Rp. 18,958.75 ,-
43). 1 Bh Pasang kait angin
a. Bahan
kait angin 1.000 Bh x Rp. 8,250.00 ,- = Rp. 8,250.00 ,-
Sub Jumlah (1) ,- = Rp. 8,250.00 ,-
b. Tenaga
Pekerja 0.0150 Oh x Rp. 25,000.00 ,- = Rp. 375.00 ,-
Tukang kayu 0.1500 Oh x Rp. 40,000.00 ,- = Rp. 6,000.00 ,-
Kepala tukang 0.0150 Oh x Rp. 45,000.00 ,- = Rp. 675.00 ,-
Mandor 0.00075 Oh x Rp. 45,000.00 ,- = Rp. 33.75 ,-
Sub Jumlah (1) = Rp. 7,083.75 ,-
Jumlah (1) + (2) = Rp. 15,333.75 ,-
44). 1 buah pasang Grendel
a. Bahan
Grendel Ekspagnolet 1.000 Bh x Rp. 25,000.00 ,- = Rp. 25,000.00 ,-
Sub Jumlah (1) = Rp. 25,000.00 ,-
b. Tenaga
Pekerja 0.0050 Oh x Rp. 25,000.00 ,- = Rp. 125.00 ,-
Tukang kayu 0.5000 Oh x Rp. 40,000.00 ,- = Rp. 20,000.00 ,-
Kepala tukang 0.0050 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Mandor 0.0025 Oh x Rp. 45,000.00 ,- = Rp. 112.50 ,-
Sub Jumlah (2) ,- = Rp. 20,462.50 ,-
Jumlah (1) + (2) = Rp. 45,462.50 ,-
a. Bahan
kunci tanam kamar mandi 1.000 Bh x Rp. 35,000.00 ,- = Rp. 35,000.00 ,-
Sub Jumlah (1) = Rp. 35,000.00 ,-
b. Tenaga
Pekerja 0.0050 Oh x Rp. 25,000.00 ,- = Rp. 125.00 ,-
Tukang kayu 0.5000 Oh x Rp. 40,000.00 ,- = Rp. 20,000.00 ,-
Kepala tukang 0.0050 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Mandor 0.0025 Oh x Rp. 45,000.00 ,- = Rp. 112.50 ,-
Sub Jumlah (2) ,- = Rp. 20,462.50 ,-
Jumlah (1) + (2) = Rp. 55,462.50 ,-
a. Bahan
kunci tanam biasa 1.000 Bh x Rp. 92,500.00 ,- = Rp. 92,500.00 ,-
Sub Jumlah (1) ,- = Rp. Rp 92,500.00 ,-
b. Tenaga
Pekerja 0.0100 Oh x Rp. 25,000.00 ,- = Rp. 250.00 ,-
Tukang kayu 0.5000 Oh x Rp. 40,000.00 ,- = Rp. 20,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 45,000.00 ,- = Rp. 450.00 ,-
Mandor 0.0050 Oh x Rp. 45,000.00 ,- = Rp. 225.00 ,-
Sub Jumlah (2) = Rp. 20,925.00 ,-
Jumlah (1) + (2) = Rp. 113,425.00 ,-
47). 1 m1 Memasang Pipa Beton, diameter 30 cm - 100 cm
a. Bahan
Pipa beton 1.100 Bh x Rp. 35,000.00 ,- = Rp. 38,500.00 ,-
Batu bata 0.550 Bh x Rp. 500.00 ,- = Rp. 275.00 ,-
Sement portland 10.300 Kg x Rp. 650.00 ,- = Rp. 6,695.00 ,-
Pasir pasang 0.061 Bh x Rp. 95,833.00 ,- = Rp. 5,845.81 ,-
Pasir urug 0.069 Bh x Rp. 75,000.00 ,- = Rp. 5,175.00 ,-
Sub Jumlah (1) = Rp. 56,490.81 ,-
b. Tenaga
Pekerja 0.380 Oh x Rp. 25,000.00 ,- = Rp. 9,500.00 ,-
Tukang batu 0.190 Oh x Rp. 40,000.00 ,- = Rp. 7,600.00 ,-
Kepala tukang 0.019 Oh x Rp. 45,000.00 ,- = Rp. 855.00 ,-
Mandor 0.019 Oh x Rp. 45,000.00 ,- = Rp. 855.00 ,-
Sub Jumlah (2) ,- = Rp. 18,810.00 ,-
Jumlah (1) + (2) = Rp. 75,300.81 ,-
REKAPITULASI
Bobot
No. Uraian Pekerjaan Harga
%
I. Pekerjaan Persiapan Rp 2,789,430.00 1.557
II. Pekerjaan Tanah dan Urugan Rp 6,961,681.39 3.887
III. Pekerjaan Pasangan dan Plesteran Rp 44,056,005.78 24.598
IV. Pekerjaan Beton Rp 18,449,204.44 10.301
V. Pekerjaan Kayu dan Kaca Rp 33,529,767.07 18.721
VI. Pekerjaan Atap dan Plafond Rp 24,220,443.75 13.523
VII. Pekerjaan Lantai Rp 8,382,666.93 4.680
VIII. Pekerjaan Instalasi Listrik dan Air Rp 19,268,966.65 10.759
IX. Pekerjaan Finishing Rp 12,544,459.94 7.004
X. Pekerjaan Penggantung dan Pengunci Rp 5,186,611.25 2.896
XI. Pekerjaan Lain - Lain Rp 3,713,837.40 2.074
Total = Rp 179,103,074.60 100.000
PPN 10 % = Rp 17,910,307.46
Jumlah = Rp 197,013,382.06
Pembulatan = Rp 197,013,000.00
Total Harga
Harga/ m2 bangunan =
Luas Bangunan
Rp 179,103,074.60
=
70.750
= Rp 2,531,492.22 /m2
RENCANA ANGGARAN BIAYA
No. Jenis Pekerjaan Sat. Volume Harga Satuan Total Harga Bobot
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m2 239.250 Rp 1,000.00 Rp 239,250.00 0.134
2 Pemasangan Bowplank m1 54.000 Rp 41,670.00 Rp 2,250,180.00 1.256
3 Penyediaan Air Kerja LS 1 Rp 300,000.00 Rp 300,000.00 0.168
Rp 2,789,430.00 1.557
II. PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi m3 68.700 Rp 34,040.00 Rp 2,338,548.00 1.306
2 Urugan Tanah Kembali m3 17.175 Rp 5,655.00 Rp 97,124.63 0.054
3 Urugan Pasir di Bawah Pondasi m3 8.850 Rp 160,000.31 Rp 1,416,002.74 0.791
4 Urugan Pasir Peninggi Lantai m3 19.438 Rp 160,000.31 Rp 3,110,006.03 1.736
TOTAL Rp 6,961,681.39 3.887
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping m3 17.700 Rp 147,110.40 Rp 2,603,854.08 1.454
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) m3 38.658 Rp 286,941.85 Rp 11,092,454.64 6.193
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 35.850 Rp 61,298.82 Rp 2,197,562.70 1.227
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 213.454 Rp 58,729.49 Rp 12,536,028.81 6.999
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 71.700 Rp 18,157.83 Rp 1,301,916.20 0.727
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 419.454 Rp 17,041.33 Rp 7,148,048.10 3.991
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) m2 17.963 Rp 17,041.33 Rp 306,104.82 0.171
8 Acian Tembok m2 437.416 Rp 15,705.95 Rp 6,870,036.44 3.836
TOTAL Rp 44,056,005.78 24.598
IV. PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 2.865 Rp 2,123,443.16 Rp 6,083,664.65 3.397
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 1.140 Rp 3,344,698.16 Rp 3,814,561.36 2.130
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 0.264 Rp 3,344,698.16 Rp 883,000.31 0.493
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m3 3.090 Rp 2,123,443.16 Rp 6,561,439.36 3.663
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) m3 0.396 Rp 2,783,963.16 Rp 1,102,449.41 0.616
6 Cor Beton Neut (1pc : 2psr : 3krl) m3 0.010 Rp 425,973.16 Rp 4,089.34 0.002
TOTAL Rp 18,449,204.44 10.301
V. PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 0.818 Rp 6,141,000.00 Rp 5,020,267.50 2.803
2 Pasangan Daun Pintu Panil Kayu m2 5.520 Rp 378,500.00 Rp 2,089,320.00 1.167
3 Pas. Daun Pintu Double Teacwood 3 mm m2 4.920 Rp 192,700.75 Rp 948,087.69 0.529
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng m2 2.880 Rp 197,437.30 Rp 568,619.42 0.317
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 22.668 Rp 388,383.75 Rp 8,803,882.85 4.916
6 Pas. Kayu Kap dan Gording m3 4.393 Rp 2,807,300.00 Rp 12,333,434.61 6.886
7 Pasangan Lisplank Papan m1 129.000 Rp 29,195.00 Rp 3,766,155.00 2.103
TOTAL Rp 33,529,767.07 18.721
VI. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 213.380 Rp 44,305.00 Rp 9,453,800.90 5.278
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 14.500 Rp 18,525.00 Rp 268,612.50 0.150
3 Pas. Plafond Tripleks 3 mm & Rangka m2 162.140 Rp 77,502.50 Rp 12,566,255.35 7.016
4 Pas. List Penutup Plafond (Berprofil) m1 239.600 Rp 8,062.50 Rp 1,931,775.00 1.079
TOTAL Rp 24,220,443.75 13.523
VII. PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 101.925 Rp 52,820.66 Rp 5,383,745.67 3.006
2 Pasangan Tegel Mozaik 30/30 m2 5.100 Rp 62,885.66 Rp 320,716.86 0.179
3 Pasangan Tegel Plint 10/20 m1 87.400 Rp 14,791.67 Rp 1,292,791.57 0.722
4 Pasangan Tegel Porselen 20/20 m2 24.390 Rp 56,802.49 Rp 1,385,412.83 0.774
TOTAL Rp 8,382,666.93 4.680
VIII. PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah 19 Rp 17,500.00 Rp 332,500.00 0.186
2 Pasangan Lampu TL 40 Watt Buah 2 Rp 64,000.00 Rp 128,000.00 0.071
3 Pasangan Lampu TL 20 Watt Buah 9 Rp 56,500.00 Rp 508,500.00 0.284
4 Pasangan Lampu Pijar 25 Watt Buah 2 Rp 3,250.00 Rp 6,500.00 0.004
5 Pasangan Saklar Tunggal Buah 6 Rp 10,750.00 Rp 64,500.00 0.036
6 Pasangan SaklarGanda Buah 3 Rp 14,250.00 Rp 42,750.00 0.024
7 Pasangan Stop Kontak Buah 7 Rp 12,750.00 Rp 89,250.00 0.050
8 Pasangan Sekring Cast Buah 1 Rp 14,000.00 Rp 14,000.00 0.008
9 Pasangan Arde Pembumian Buah 1 Rp 100,000.00 Rp 100,000.00 0.056
10 Pasangan Wastafel Buah 1 Rp 266,608.33 Rp 266,608.33 0.149
11 Pasangan Bak Air Porselin Buah 2 Rp 365,458.33 Rp 730,916.66 0.408
12 Pasangan Closed Jongkok Buah 2 Rp 262,058.33 Rp 524,116.66 0.293
13 Pasangan Septic Tank dan Peresapan Buah 2 Rp 7,500,000.00 Rp 15,000,000.00 8.375
14 Pasangan Instalasi Air Bersih LS 1 Rp 600,000.00 Rp 600,000.00 0.335
15 Pasangan Instalasi Air Kotor LS 1 Rp 600,000.00 Rp 600,000.00 0.335
16 Pasangan Floor Drain Buah 3 Rp 23,675.00 Rp 71,025.00 0.040
17 Pasangan Kran Air Buah 4 Rp 47,575.00 Rp 190,300.00 0.106
TOTAL Rp 19,268,966.65 10.759
IX. PEKERJAAN FINISHING
1 Cat Tembok m2 437.416 Rp 13,846.00 Rp 6,056,465.40 3.382
2 Cat Plafond m2 162.140 Rp 13,846.00 Rp 2,244,990.44 1.253
4 Cat Kayu m2 72.60 Rp 24,877.50 Rp 1,806,106.50 1.008
5 Cat Seng m2 213.380 Rp 10,860.00 Rp 2,317,306.80 1.294
6 Teak Oil m2 11.04 Rp 10,832.50 Rp 119,590.80 0.067
TOTAL Rp 12,544,459.94 7.004
X. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag Buah 6 Rp 113,425.00 Rp 680,550.00 0.380
2 Pasangan Kunci KM/ WC Buah 2 Rp 55,462.50 Rp 110,925.00 0.062
3 Pasangan Grendel Buah 31 Rp 45,462.50 Rp 1,409,337.50 0.787
4 Pasangan Engsel Buah 86 Rp 18,958.75 Rp 1,630,452.50 0.910
5 Pasangan Kait Angin Buah 31 Rp 15,333.75 Rp 475,346.25 0.265
6 Pasangan Anker Doc Buah 68 Rp 10,000.00 Rp 680,000.00 0.380
7 Pasangan Mur, Baut dan Beughel U LS 1 Rp 200,000.00 Rp 200,000.00 0.112
TOTAL Rp 5,186,611.25 2.896
XI. PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm m1 46.000 Rp 75,300.81 Rp 3,463,837.40 1.934
2 Pembersihan Kembali LS 1 Rp 250,000.00 Rp 250,000.00 0.140
TOTAL Rp 3,713,837.40 2.074
TIME SCHEDULLE & KURVA S
Bobot MINGGU
No. JENIS PEKERJAAN % 1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 0.134 0.134 Chart Title
2 Pemasangan Bowplank 1.256 1.256
3 Penyediaan Air Kerja 0.168 0.031 0.129 0.008
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 1.306 1.306
2 Urugan Tanah Kembali 0.054 0.021 0.033
3 Urugan Pasir di Bawah Pondasi 0.791 0.791
4 Urugan Pasir Peninggi Lantai 1.736 0.868 0.868
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping 1.454 1.454
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) 6.193 2.587 3.606
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 1.227 0.675 0.552
4 Pasangan Tembok Biasa (1 pc : 5 psr) 6.999 3.330 2.499 1.170
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 0.727 0.727
6 Plesteran Tembok Biasa (1 pc : 5 psr) 3.991 2.547 1.444
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) 0.171 0.171
8 Acian Tembok 3.836 1.312 1.607 0.917
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 3.397 0.306 1.593 1.498
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 2.130 0.586 1.152 0.392
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.493 0.493
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 3.663 0.493 2.996 0.174
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) 0.616 0.616
6 Cor Beton Neut (1pc : 2psr : 3krl) 0.002 0.002
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I 2.803 0.616 0.668 1.519
2 Pasangan Daun Pintu Panil Kayu 1.167 1.167
3 Pas. Daun Pintu Double Teacwood 3 mm 0.529 0.529
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng 0.317 0.317
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 4.916 3.282 0.968 0.666
7 Pas. Kayu Kap dan Gording 6.886 0.778 1.577 4.531
8 Pasangan Lisplank Papan 2.103 1.853 0.250
VI PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm 5.278 4.516 0.762
2 Pas. Atap Bubungan Seng Licin 0.30 mm 0.150 0.150
3 Pas. Plafond Tripleks 3 mm & Rangka 7.016 5.443 0.417 1.156
4 Pas. List Penutup Plafond (Berprofil) 1.079 1.079
VII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 3.006 1.825 0.553 0.628
2 Pasangan Tegel Mozaik 30/30 0.179 0.179
3 Pasangan Tegel Plint 10/20 0.722 0.722
4 Pasangan Tegel Porselen 20/20 0.774 0.091 0.683
VIII PEKERJAAN INSTALASI LISTRIK & AIR
1 Pasangan Titik Lampu 0.186 0.186
2 Pasangan Lampu TL 40 Watt 0.071 0.071
3 Pasangan Lampu TL 20 Watt 0.284 0.284
4 Pasangan Lampu Pijar 25 Watt 0.004 0.004
5 Pasangan Saklar Tunggal 0.036 0.036
6 Pasangan SaklarGanda 0.024 0.024
7 Pasangan Stop Kontak 0.050 0.050
8 Pasangan Sekring Cast 0.008 0.008
9 Pasangan Arde Pembumian 0.056 0.056
10 Pasangan Wastafel 0.149 0.149
11 Pasangan Bak Air Porselin 0.408 0.408
12 Pasangan Closed Jongkok 0.293 0.293
13 Pasangan Septic Tank dan Peresapan 8.375 1.566 3.350 3.459
14 Pasangan Instalasi Air Bersih 0.335 0.335
15 Pasangan Instalasi Air Kotor 0.335 0.335
16 Pasangan Floor Drain 0.040 0.040
17 Pasangan Kran Air 0.106 0.106
IX PEKERJAAN FINISHING
1 Cat Tembok 3.382 2.114 0.303 0.965
2 Cat Plafond 1.253 1.253
4 Cat Kayu 1.008 0.958 0.050
5 Cat Seng 1.294 1.294
6 Teak Oil 0.067 0.067
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag 0.380 0.380
2 Pasangan Kunci KM/ WC 0.062 0.062
3 Pasangan Grendel 0.787 0.787
4 Pasangan Engsel 0.910 0.910
5 Pasangan Kait Angin 0.265 0.265
6 Pasangan Anker Doc 0.380 0.053 0.185 0.142
7 Pasangan Mur, Baut dan Beughel U 0.112 0.047 0.065
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 1.934 1.934
2 Pembersihan Kembali 0.140 0.140
Parsil 100.000 3.505 5.159 6.100 7.626 8.353 9.571 11.167 10.061 9.095 8.617 8.172 7.503 5.071
RENCANA Kumulatif 0.000 3.505 8.664 14.764 22.390 30.743 40.314 51.481 61.542 70.637 79.254 87.426 94.929 100.000
Chart Title
ANALISA TENAGA KERJA
I. PEKERJAAN PERSIAPAN
1. 1 m1 Pemasangan Bowplank
pekerja = 0.1000 x 54.000 / 6 = 0.900 orang
tukang kayu = 0.1000 x 54.000 / 6 = 0.900 orang
kepala tukang = 0.0100 x 54.000 / 6 = 0.090 orang
mandor = 0.0050 x 54.000 / 6 = 0.045 orang
TOTAL :
pekerja = 134.3003 orang
mandor = 6.5963 orang
tukang batu = 76.7702 orang
kepala tukang = 7.6770 orang
TOTAL :
pekerja = 19.2971 orang
mandor = 0.6881 orang
tukang batu = 1.2806 orang
tukang besi = 5.5508 orang
tukang kayu = 6.8237 orang
kepala tukang batu = 1.3624 orang
kepala tukang besi = 1.3624 orang
kepala tukang kayu = 1.3624 orang
TOTAL :
pekerja = 24.2691 orang
mandor = 1.2135 orang
tukang kayu = 65.0457 orang
kepala tukang kayu = 6.7196 orang
TOTAL :
pekerja = 27.5717 orang
mandor = 1.4183 orang
tukang kayu = 19.0573 orang
kepala tukang kayu = 1.3367 orang
TOTAL :
pekerja = 14.9958 orang
mandor = 0.7498 orang
tukang batu = 8.2602 orang
kepala tukang batu = 0.8260 orang
TOTAL :
pekerja = 1.2450 orang
mandor = 0.1125 orang
tukang batu = 1.1083 orang
TOTAL :
pekerja = 6.8956 orang
mandor = 0.8928 orang
tukang cat = 17.9486 orang
kepala tukang cat = 2.2360 orang
TOTAL :
pekerja = 0.3300 orang
mandor = 0.0334 orang
tukang kayu = 6.1750 orang
kepala tukang kayu = 0.3300 orang
TOTAL :
pekerja = 2.913 orang
mandor = 0.146 orang
tukang batu = 1.457 orang
kepala tukang batu = 0.146 orang
MINGGU KE
NO. TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank
Pekerja 0.900 0.900
Tukang kayu 0.900 0.900
Kepala Tukang 0.090 0.090
Mandor 0.045 0.045
TOTAL pekerja 0.900
Tukang kayu 0.900
Kepala Tukang 0.090
mandor 0.045
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi
Pekerja 14.313 14.313
Mandor 0.710 0.710
2 Urugan Tanah kembali
Pekerja 1.099 1.099 1.099
Mandor 0.109 0.109 0.109
3 Urugan Pasir di Bawah Pondasi
Pekerja 0.443 0.443
Mandor 0.015 0.015
4 Urugan Pasir Peninggi Lantai
Pekerja 1.944 1.944 1.944
Mandor 0.065 0.065 0.065
TOTAL pekerja 14.313 1.542 3.043 1.944
mandor 0.710 0.124 0.174 0.065
III PEKERJAAN PASANGAN DAN PLESTERAN
1 1 m3 Pasangan Aanstamping
pekerja 2.301 2.301
Tukang Batu 1.151 1.151
kepala tukang batu 0.115 0.115
mandor 0.115 0.115
2 1 m3 Pasangan Pondasi Batu Karang (1pc : 5psr)
pekerja 19.329 19.329 19.329
mandor 0.966 0.966 0.966
tukang batu 7.732 7.732 7.732
kepala tukang batu 0.773 0.773 0.773
3 1 m2 Pasangan Tembok Trasraam (1pc : 3psr)
pekerja 3.824 3.824 3.824
mandor 0.179 0.179 0.179
tukang batu 1.195 1.195 1.195
kepala tukang batu 0.120 0.120 0.120
4 1 m2 Pasangan Tembok Biasa (1pc : 5psr)
pekerja 34.153 34.153 34.153 34.153
mandor 1.601 1.601 1.601 1.601
tukang batu 10.673 10.673 10.673 10.673
kepala tukang batu 1.067 1.067 1.067 1.067
Rp 29,155,000.00
PERSENTASE =
Rp 179,103,074.60
= 16.28 %
5 1 m2 Teak Oil
teak oil = 0.3600 x 11.0400 = 3.9744 liter
6 1 m2 Cat Seng
cat seng = 0.3000 x 213.3800 = 64.0140 kg
K
L M
H
F G
E
D
C
A
10.6200
23.3250
5.3100 21.2400
21.0297 42.5233 131.4355
1.4340 2,509.5000 12.8791
9.6054 14,941.7625 51.6558
1.3623 11.6154
9.2280 45.3010
0.3952 1.9400
3.9367
1.7072
0.9994 0.9994
58.3704
1.0800
1.4760 1.4760
0.8640 0.8640
24.9348
3.5147
6.4500
4.2676 149.3660
0.5800 4.3500
24.3210 4.8642
7.1880 251.5800
101.9250
1253.3460 25.3732 54.0816 4.8476 14.3922 2.3400 24.9348 149.3660 4.3500 251.5800 101.9250
1254.0 26.0 55.0 5.0 15.0 3.0 25.0 150.0 5.0 252.0 102.0
5.1000
8.7400
24.3900
5.1000 8.7400 24.3900 70.8456 113.7282 42.1564 72.2976 64.0140 14.5200 18.8760 3.9744
6.0 9.0 25.0 71.0 114.0 43.0 73.0 65.0 15.0 19.0 4.0
19
2
9
2
6
3
7
1
1
1
50.6000
50.6000 19 2 9 2 6 3 7 1 1 1
51.0 19 2 9 2 6 3 7 1 1 1
2
2
2
3
4
6
2
31
86
31
68
2 2 2 3 4 6 2 31 86 31 68
2 2 2 3 4 6 2 31 86 31 68
Liter Btg Kg
1.7190
2.2810 228.0960
0.5280 52.8000
1.8540 228.0960
65.9002
6 509 66
7 509 66