At a glance
Powered by AI
The key takeaways are that the CWOR system aims to enable efficient operations by reducing interface complexities and minimizing operational risk through system integration. Well integrity and fatigue management were also key drivers in the system design.

The main components of the CWOR system include the Intervention Workover Control System, surface equipment like the Surface Flow Tree and swivel, the riser system, and the CWOR valve package equipment.

Some of the functions of the Well Control Package include serving as a subsea tree running and retrieval tool, acting as a fail safe main safety barrier towards the well, providing cutting and sealing capability, and facilitating circulation of the CWOR string.

Completion Workover

Riser System
Enabling efficient operations by reducing interface
complexities and minimizes operational risk
Well integrity with fatigue management were key drivers
for our system design enabling efficient operations.
Our full system integration of CWOR with the subsea
equipment and vessel reduces interface management
complexities and minimizes operational risk.

Technical description
The CWOR system is available in pressure ranges
from 5,000 psi to 15,000 psi and bore sizes
from 5 1/8" to 7 1/16". A 20,000 psi system with a
5 1/8" bore size is currently in development.

The system complies with ISO13628-7, has the


capability for Safety Integrity Level 2 (SIL-2) control
of both emergency shutdown (ESD) and emergency
quick disconnect (EQD), whilst delivering accelerated
response times, and is configurable to suit anchored,
Dynamically Positioned and Jack-up vessels.
Operators benefit from our CWOR system with:

Minimal operational costs with


``
less offshore personnel
Minimal third party equipment on the vessel Minimal
``
operational risk through system integration
Minimal operational risk through Safety
``
Integrity Level 2 (SIL-2) rated fast response
control system Minimal risk and maximum
operating envelope through use of optional
Riser Monitoring and Management

2 Completion Workover Riser System


System specification

Intervention Workover Control System:


Multimode Hydraulic Power Unit/Master
``
Control Panel rated for SIL-2 ESD and EQD
Tree umbilical and reel system with
``
umbilical disconnect system
Landing String umbilical and reel system
``
Lubricator Valve umbilical and reel system
``
Surface Flow Tree jumper
``
Umbilical Deck Jumpers and
``
Emergency Shutdown Panels
Electro Hydraulic Workover
``
Control Module (WOCM)
Riser Monitoring and
``
Management – optional

Surface equipment:
Surface Flow Tree (SFT) - Available in
``
7 1/16" 10,000 psi and 5 1/8" 15,000 psi
Wire Line / Coil Tubing adapter
``
Swivel
``
Riser Slick Joint – also called
``
Cased Wear Joint
Upper Tension and Stress Joints
``
Tension Frame
``

Riser system (available in):


5 1/8" 10,000 psi drill pipe style
``
5 1/8" to 7 1/16" casing riser style
5 1/8" to 7 1/16" union nut style
``
Dual bore and mono bore
``
Safety joint protection system
``

CWOR valve package equipment:


All products available in 5 1/8"
``
10,000/15,ooo psi and 7 1/16" 10,000 psi
Single or Dual Lubricator Valves
``
EDP system with High Angle Release
``
Connector and Retainer Valve
WCP configurable with safety heads, Grip
``
Seal Rams and Shear Seal Rams rated
Annulus access via dual bore riser or
``
via independent flexible hoses

Completion Workover Riser System 3


Completion Workover Riser System overview

4 Completion Workover Riser System


Lubricator Valve (LV)

Functions:
The LV is a ball valve controlled by a
``
separate control umbilical which can be
configured as single or dual assemblies.
It is a working valve which allows long
``
wireline or perforating assemblies to be
rigged up and run into the well.
The LV allows the Landing String to be used in
``
lieu of very long wireline lubricator assemblies
above the surface flowhead. It therefore
saves time and improves job safety.
Designed to withstand dropped object
``
impact from above (i.e. tools).
Chemical injection porting is also provided both
``
between and below the valves if required.

Emergency Disconnect Package (EDP)

Functions:
The EDP contains a Retainer Valve (RV) which closes
``
(cuts and seals wireline and/or coil tubing) just
prior to unlatching the EDP connector, preventing
hydrocarbon leakage to the environment.
Provides a high angle release Emergency
``
Quick Disconnect (EQD) connector which
can unlatch under applied bending moments
from a vessel drift or drive off scenario.

Completion Workover Riser System 5


Well Control Package (WCP)

Functions:
Together with the EDP, the WCP serves as a
``
subsea tree running and retrieval tool and
remotely controlled fail safe main safety barrier
towards the well during vertical intervention.
It can be configured with a combination of Safety
``
Heads, Grip Seal Rams (GSR) and Shear Seal Rams (SSR).
It can be left in a secure status at any time when the
``
CWOR is disconnected from the subsea tree system.
It provides cutting and sealing capability for small
``
drill pipe, coiled tubing, wireline & slickline.
Pressure test capability from above.
``
The LRP also facilitates circulation of the
``
CWOR string and cut coil tubing if fitted with
a combination of grip seal and shear rams.
Can be configurable for multiple subsea tree upper
``
hub interfaces (both monobore and dual bore).

Workover Control Module (WOCM)

Functions:
Operation of valves and connectors on the EDP,
``
LRP and workover valve on the subsea tree.
Operation of connectors on the choke module.
``
Monitoring of the PT/TT in the main
``
and annulus bore on the LRP.
Close the defined barrier envelopes
``
required for ESD and EQD.
SIL-2 rated system which includes redundant electronic
``
modules and a manifold block for solenoid valves.

6 Completion Workover Riser System


IWOCS HPU/MCP

Functions:
No single failure in the IWOCS will cause an unintended
``
system shut-down, unacceptable risk for personnel
safety, environment or loss of financial assets.
HPU/HDU/MCP can be one or several containers,
``
typical 12-35ft. They are DNV 2.7-1 certified
and A6o fire rated containers, with a control
room section and a hydraulic section.
Shutdown, PSD/ESD/EQD panels are included in system.
``
Remote control panel for installation in driller cabin will
``
show the same information as HMI in MCP control room.
Redundant communication, A and B side with WOCM
``
on EDP and SCM on Tree, is typically signal on power.
SIL-2 rated safety system.
``

Umbilicals and reels

Functions:
In riser Landing String (Electro Hydraulic comms)
``
and Lubricator Valve (Hydraulic comms) umbilicals
are optimized for size to minimize risk of damage.
Open water umbilicals (Electro Hydraulic and Optic
``
comms) are multifunction standardized designs that
maximize flexibility towards TechnipFMC and other
suppliers’ subsea tree production control systems.
Umbilical reels can be delivered electrical or pneumatic
``
driven with a local and remote control panel.
They can all be run manually or have a constant tension.
``

Completion Workover Riser System 7


TechnipFMC
11740 Katy Freeway
Houston, Texas 77079
Tel: +1 281 870 1111
© TechnipFMC plc 2018
TechnipFMC.com SS0XX

You might also like