Lats Hvac User's Manual: LG Electronics
Lats Hvac User's Manual: LG Electronics
Lats Hvac User's Manual: LG Electronics
LATS HVAC
User’s Manual
CAC model Selection & System Check Simulation Program’s Tutorial & Manual
Ver.13_2020.03.26
1
Contents
Environment .......................................................................................................................................................................................... 4
1) Menu ......................................................................................................................................................................................... 5
2) Pane ........................................................................................................................................................................................... 8
1) Multi V ................................................................................................................................................................................... 12
2) Multi ....................................................................................................................................................................................... 17
3) ERV ......................................................................................................................................................................................... 21
4) Single ..................................................................................................................................................................................... 23
Wrap-up .............................................................................................................................................................................................. 46
3
Environment
[Recommendation]
Windows 7/8/10, 32/64bit
MS office 2010, 2013, 2016, 2019 (Excel, Access are mandatory)
*Not support office 365.
[Requirement]
Windows 7, 32bit
MS office 2007 SP3 (Excel, Access are mandatory)
Working on standalone machines, not recommended for server usage.
4
Introducing menu and pane
1) Menu
.
1. Main
2. System
3. View
4. Language
6
5. Help
7
2) Pane
1. Properties Pane
To apply any modification, always use the Save button after each action.
[Common]
Unit Information: Available to change the Unit. To save the unit, click the disc button.
Display
Panel Position: Change Panel Position Top/Right
Buyer Model Name: Show Buyer Model Name
Pipe Diameter: On/Off Pipe Diameter
Pipe Length: On/Off Pipe length
Pipe Legend: On/Off Pipe Legend three pipe or two pipe
Controller Icon: On/Off icon of remote controller, dry contact, and group control kit
IDU Tag: On/Off IDU tag to display or not on tree diagram, schematic diagram and
validation property
Room Load On/Off Icon of room load
IDU Height: Show or not on tree diagram about height difference between ODU and IDU
Program Setting
Auto Save(minute): Set Auto Save time 3/5/10 min
Auto Update: On/Off Auto Update
[Multi V]
Discontinued Model: Show or not discontinued model on model selection windows.
Branch option: Available to select “0” series branch.
Elbow count: Show or not on tree diagram about pipe’s elbow count
Schematic
ODU Breaker: Available to select “total” or “each” outdoor breaker.
Conditional App: Select the conditional application option (Check the PDB)
Hydro kit
Lock Operation Mode: Check or not the Operation mode lock function.
Simulation
Diversity: Check or not the Diversity function.
FAU Simulation: Check or not the FAU simulation.
Altitude Factor: Apply Altitude Factor
8 for Multi V (Refer to Altitude Factor on Multi V
Menu)
Display
Block Load: Show Block Load on Tree Diagram
This pane shows an overview of your entire project containing all your created systems.
User can switch among systems by clicking on the desired one. User can create new systems
by right clicks or using the icons ( ) for various configurations.
3. Project Pane
At this pane user can work on his systems. Interface is easy to use either by drag and drop
function or double clicks and selection.
9
Creating a project
1. Click the “new” button
Check or change the project name and saving path. And then click the next.
Select and change the region climate data. User is allowed to modify temperatures and
humidity default values; an automatic calculation for WBT is done when inputting DBT and
humidity (RH).
When user click Add user can create new climate data by manual.
10
Figure 12 Add new climate data on design condition
For each section of equipment the user has the possibility to select dedicated accessories, function is
available for both outdoor unit selection as well as for indoor unit selection.
Select the indoor unit either by drag and drop or by double clicking the void square (a new pop-up
window will open)
12
Figure 17 Indoor unit selection
1
ESP: External Static Pressure
2
CMM: Cubic Meters per Minute
3
PDB: Product Data Book
13
Figure 18 Indoor unit type Duct selection
Change the pipe length: Click the pipe length and you can modify the length and add number of
elbows (piping turns).
Select the Outdoor Unit (by double clicking on your outdoor unit image)
Full models: User selects the model directly
Auto selection: Based on combination, program suggest the outdoor unit
Defrosting factor: In heating to under “0” degree, the capacity is calculated automatically
SLC mode: When this option is checked, the capacity is calculated as SLC mode capacity
table.
15
After configuration of system is completed, user can proceed to simulation of system by clicking the
system check. The view of the Project Pane is selected either on Tree mode (user can see refrigerant
diagram isometrically) or Schematic diagram (user can see electrical and communication sketch).
Auto piping: Selects the pipe diameter and y-branch size automatically
System check: Checks the designed configuration and calculates the additional refrigerant
Validation property: Shows the validation property based on PDB
Tree: Shows Tree diagram
Room Load: On/Off Room Load
Schematic Diagram: Shows Schematic diagram
Power Line, Control Line: On/Off Power Line, Control Line
Altitude Factor: Shows Altitude Factor table for reference
16
2) Multi
For each section of equipment the user has the possibility to select dedicated accessories,
function is available for both outdoor unit selection as well as for indoor unit selection
For Multi system, configuration has to start with the selection of Outdoor unit first. User has to
previously decide whether to use “Buyer Model Name” or “Factory Model Name” for his configuration
(and save). By double clicking on the outdoor unit image, user can select a specific unit
17
Figure 24 Multi selection (outdoor)
18
Check the branch and BD Unit information
Select the indoor unit either by drag and drop or by double clicking the void square (a new pop-up
window will open)
After configuration of system is completed, user can proceed to simulation of system by clicking the
system check. The view of the Project Pane is selected either on Tree mode (user can see refrigerant
diagram isometrically) or Schematic diagram (user can see electrical and communication sketch).
19
After system check and validation check, user is able to conclude if configuration is valid or not.
20
3) ERV
Select the system type (based on Hz, Location)
Select the model and accessories. And then, click the Heat recovery button
21
Check the PQ Curve
22
4) Single
This is the first page of Single model selection
23
5) Control System
24
[ODU Group Design]
There are many designed systems such as Multi V, Multi, Single and ERV. Making ODU Groups by
clicking the button, ‘ODU Group Design’.
Click the button, ‘ODU Group Design’.
Double clicking Group name and then change Group name as you want. Click the button, ‘Delete’, and
then deleted ODU Group.
25
Check systems on the System List to make group and then click the button, ‘<<’.
So, Group 1st floor contains systems, Multi V1, Multi V2, and MultiV3.
Click the button, ‘>>’, and the contained systems will be removed.
Step to design Control System depends on Controller designer starting Master (or Slave) to
ODU groups or starting ODU groups to Master (or Slave). Master central controller must be
selected. Master – ODU Group designs mainly.
* M: Master, S: Slave, C: Channel, M1C1: Channel 1 of Master1
Click the button, ‘Add’ on Central Controller (Master), and select M1 as ACP 5.
26
Click Channel 1 of M1.
Check the Group, 1st floor.
Click the button, ‘Connect’.
27
Connection between M1C2 and ODU Group, 2nd floor and 3rd floor is same method.
28
29
[Master to Slave to ODU Group]
Click the button, ‘Add’ on Central Controller (Master), and select M1 as ACP IV.
Click the button, ‘Add’ on Central Controller (Slave), and select S1, S2 as AC EZ.
30
Check S1,S2.
Click Channel 1 of M1.
Click the button,‘ Connect’
31
Check the Slave you want to disconnect from Master.
Click the button, ‘Disconnect’. Disconnection will be done.
32
Check each Group, 1st floor and 2nd floor.
Click Channel 1 of S1.
Click the button, ‘Connect’
33
Connect Group, 3rd floor to S2 is same method.
If there are something to disconnect, check the Group you want to disconnect from Slave.
Click the button, ‘Disconnect’. Disconnection will be done.
34
[How to connect ACS I/O Module]
35
36
[How to connect PDI]
There are 2 way to select PDI such as Master or Slave. PDI design mainly as Master Controller.
[PDI as Master]
Click the button, ‘Add’ on Central Controller (Master), and select M1 as PDI Premium.
37
M1C1 will be connected to groups, 1st floor, 2nd floor and 3rd floor.
M/S column for 1st floor, 2nd floor and 3rd floor will be noted M1C1.
38
Click the button, ‘OK’ to finish design for Control System.
39
[PDI as Slave]
Click the button, ‘Add’ on Central Controller (Slave), and select S3 as PDI Premium.
Check S3.
Click Channel 2 of M1. Click the button, ‘Connect’.
S3 will be connected to M1C2.
M column for S3 will be noted M1C2.
40
Click Channel 1 of S3 and Group 2, 2nd floor. Click the button, ‘Connect’.
Check PDI column to connect PDI Premium to Group, 2nd floor.
41
[Design for Integrated Controller]
42
*How to revise design
43
[How to set for control address by each indoor unit]
When after grouping outdoor units, click the “Control Address” button
You can insert control address by manually or by clicking “Auto Addressing” as each controller
When clicking “Auto Addressing”, the control address will be inserted by automatically for 00 to FF.
44
[How to update schematic diagram after design control system]
After design control system and control address, you can check the update of schematic diagram of
each system.
The central control will be shown, and the control address will be displayed at next of IDU tag on
IDU block.
45
6) Report output
After simulation successfully concluded, the user is able to export a summary in the form of an
Excel report with several sheets containing output information related to the simulated systems or
PDF report.
Wrap-up
For additional information on functions such as Diversity or Hydro kit, please contact your
Local LG Electronics representative.
46
LATS Agreement
Electronic Marketing
47
New Functions
1. Click the button, ‘Export to LATS HVAC’ on LATS CAD or LATS Revit.
48
2. Click the button, ‘Import shd File’ on LATS HVAC.
3. Select Import file that is the exported file from LATS CAD or LATS Revit (*.shd).
49
2. Select remote controller, dry contact on Accessory table.
50
3) Header, HR unit change
By clicking All, All Height difference from ODU to HR unit on Branch/Header Dialog
All Height difference from ODU to IDU on Indoor Unit Properties change at the same time.
It works same system.
51
5) Accessory All
If you want to select any accessory for every Indoor unit on same system, check All column and then
Click Add button.
If you want to remove any accessory for every Indoor unit on same system, check All column and
then Click Delete button.
Select Y branch, Header, HR Unit by drag and drop from panel to Tree same as Indoor units.
52
7) Cut, Copy unit system
53
9) Oil trap
Oil trap mark on Outdoor Multi Frame and Oil trap requirement on the report
[Report]
54
55
10) IDU Tag
56
Figure 33 IDU Tag on Schematic Diagram
57