This document summarizes the shift handover logbook from 00:00-08:00 on July 3rd at the Pakse Substation in Laos. It details the status of transmission lines and equipment, daily inspection and maintenance activities, voltage and current readings, and any faults or issues that occurred during the shift. Key events included abnormal coloration of the silicagel for Shunt Reactor 2, relay errors for SR1&2, and incorrect temperature readings for Shunt Reactor 2. The incoming and outgoing shift supervisors signed to acknowledge the handover.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
57 views1 page
03-July-2021 Shift B Logbook Operator Pakse
This document summarizes the shift handover logbook from 00:00-08:00 on July 3rd at the Pakse Substation in Laos. It details the status of transmission lines and equipment, daily inspection and maintenance activities, voltage and current readings, and any faults or issues that occurred during the shift. Key events included abnormal coloration of the silicagel for Shunt Reactor 2, relay errors for SR1&2, and incorrect temperature readings for Shunt Reactor 2. The incoming and outgoing shift supervisors signed to acknowledge the handover.
Close Open Close Open Close Open Close Open CB 80212 CB 80222 CB 80232 FUSE 603 Close Open Close Open Close Open Close Open
Service Voltage (kV) Current (A)
KW1A TR 21.74 0.7 12.62
Record Time Note
I. Transmission Line Status 00:00-08:00 Transmission Line 1 During Pakse Substation to Xepian Switchyard 00:00-08:00 Transmission Line 2 During Pakse Substation to Xepian Switchyard Normal Conditions 00:00-08:00 Transmission Line 1 During Pakse Substation to Ubon3 Substation 00:00-08:00 Transmission Line 2 During Pakse Substation to Ubon3 Substation II. Daily Activities 0:00 Receiving and Sending information to power house (call) 2:00 DCMS, Equipment Room inspection 4:00 DCMS, Equipment Room and Switch Yard inspecction 6:00 230kV Main Bus 1 230kV Main Bus 2 𝑈𝑎𝑏 = 240.0 kV 𝑈𝑎𝑏 = 240.0 kV 𝑈𝑏𝑐 = 241.0 kV 𝑈𝑏𝑐 = 241.0 kV 𝑈𝑐𝑎 = 239.0 kV 𝑈𝑐𝑎 = 239.0 kV F = 50.0 Hz F = 50.0 Hz III. Switching Order Activities Don't have anything IV. Fault and Alarm Event Log 00:00-08:00 1. Air chiller control building does not work//Waiting Air Conditioner comes to check 00:00-08:00 2. In the inspection Switch yard was seeing the color Silicagel of Shunt reactor No2 is also abnormal//Daily Recording Switch Yard 00:00-08:00 3. In Fault Recording System Panel has Relay of SR1&2 "ERROR" 00:00-08:00 4. The Sensor Shunt Reactor No.2 oil temparature BT2 on SCADA is working "Values Incorrectly"//it calculates lower than normal V. Special Activities Don't have anything VI. Work Permit Activivties Don't have anything VII. Issue Trouble Memo Don't have anything 7:55 VIII. Handover Activities 1. Observation Scada, Protection systems, Voltage Transmission line 1&2 2. Follow to record daily record and check list 3. Inspection every panel that is hotting or not // for the reason that Air chiller not working or not cooling
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
(Sengsouvanh) (Thonglone) Pakse Sub Operation Supervisor Signature: ………………………………………….. (ChanthaJohn)