0% found this document useful (0 votes)
4K views2 pages

Rate Analysis For MS Work

The document provides a cost estimate for steel work and welding required for a staircase. It includes the supply of structural steel, wastage, cartage, welding and cutting materials, labor costs for blacksmiths, helpers and material lifting, and application of primer and paint coats. The total cost is estimated to be Rs. 120,828.2 including sundries, water charges and contractor profit overhead charges.

Uploaded by

Mohd Israil Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4K views2 pages

Rate Analysis For MS Work

The document provides a cost estimate for steel work and welding required for a staircase. It includes the supply of structural steel, wastage, cartage, welding and cutting materials, labor costs for blacksmiths, helpers and material lifting, and application of primer and paint coats. The total cost is estimated to be Rs. 120,828.2 including sundries, water charges and contractor profit overhead charges.

Uploaded by

Mohd Israil Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Steel Work Welded in built up section framed work, including cutting, hoisting, fixing in

positionapplying a priming coat of approved steel primer etc as required. In Stringers,


Treads, Landings, etc. of staircase.
Code No Description Unit Qty Rate Amount
A Material
1 Detail Cost for 1.0 MT
Structer Steel such as ISMC (Base Rate
48+18% GST=54.28) MT 1.0 56640.0 56640.0
2 Add Wastage 5% MT 0.05 56640.0 2832.0
3 Cartage L.S. 3000.0
4 Welding Rod, cutting & Grinding L.S. 8000.0
B Labour
1 Blacksmith Days 12 550.0 6600.0
2 Helper Days 12 350.0 4200.0
3 Helper for Material Lifting MT 1 10000.0 10000.0

4 Applying a Priming Coat with Labour MT 1 5000.0 5000.0


Applying Pint Two or more Coat with
5 Labour MT 1 7000.0 7000.0
TOTAL 103272.0

Sundries @1% (Like sand pper, Cloth


etc.) 1032.7
Add Water charges@1% 1032.7
ADD CPOH@15% 15490.8
G.Total 120828.2