Benguet Second District Engineering Office: Republic of The Philippines
Benguet Second District Engineering Office: Republic of The Philippines
Benguet Second District Engineering Office: Republic of The Philippines
TOTAL
TOTAL DAYS IN Total Number of Repairs per System Top 10 Failure Modes
DPWH CODE MAINTENANCE
YEAR MAJOR REPAIR
PROPERTY BRAND MODEL COST
ACQUIRED (SINCE
NO. (SINCE
ACQUISITION) ENG PTR COL ACS AIE FUE STR BRK LUB ELC SUS CAM SPA TIR 1 2 3 4 5 6 7 8 9 10
ACQUISITION)
1 L2 1467 CATERPILLAR 924 HZ 2013 2,973,528.80 2 2 1 8 8 1 4 FM46 FM21 FM25 FM28 FM81 operational
2 F17 85 VOLVO EW145B 2013 3,897,832.00 0 15 15 1 1 4 FM46 FM21 FM1 FM81 operational
3 H3 6512 HYUNDAI HD270 2013 2,139,384.00 1 2 11 1 2 11 2 4 FM46 FM21 FM4 FM1 operational
4 H3 6512 HYUNDAI HD270 2013 1,599,983.00 1 2 11 1 2 11 2 4 FM46 FM21 FM4 FM1 operational
5 H3 6762 HINO HINO 300 2019 64,000.00 0 4 4 FM46 operational
6 H3 6870 FOTON TORNADO 2019 48,091.00 1 2 1 2 FM4 operational
4.4