Monthly Progress Report May 2021
Monthly Progress Report May 2021
(ABSTRACT)
20.000
OG: 2 2 - 12.740 - 5.000 - 5.000
Compact
New: - - - - - - - -
NADP - - - - - - - -
20.000
TOTAL 2 2 - 12.740 - 5.000 - 5.000
Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. 2 Nos Stores 40'x20' 34% 1. Completed & Handed Over. (Blo
01 2. Implement Shed 70'x30' 2. Completed. (Block B)
3. Implement shed = completed.
OG Main Building:
25
i. Dispensary 14’x16’
ii. Office 14x16
iii. Store 14x20.9”
iv. Bath 2 Nos 6x8
v. Boundary Wall
vi. Internal Water Supply 410 Rft
vii. Intl: Electrification
70.351
OG: 4 4 3 21.845 30.096 - 10.350 - 10.016
Compact
New: - - - - - - -
NADP - - - - - - - -
70.351
TOTAL 4 4 3 21.845 30.096 - 10.350 - 10.016
Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. 20% - - 1. 55% work completed.
136 2. 2. Finishing in progress.
3. 3. G Lavatories and Finishing w
progress.
OG
137
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Developmental works. 100% -- -- 100% Completed.
151
OG
153
1 Reconstruction of Mosque. 50% 50% 80% 95% Completed & Handed Over.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
154
1a. 1
2a.
3a.
4b.
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi
xii.
xiii
xiv.
Sector: Auqaf, Hajj, Religious & Minority Affairs PROGRESS REPORT/ REVIEW
Sub Sector: Religious Affair
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
5c Darul Uloom Taqwa Nisatta Road 2.00
Hassan Kalay P/O Kandar PK-53.
6d. UC Manga, UC Bage E irum, UC 4.50
Maho Dheri, UC Chamtar, UC
Khazana Dheri PK-53.
7e. Construction of Jamia Masjid at 1.00
Mohalla Asrat Colony Sher Abad
District Mardan.
8f. Akka Khel Village Mayar. 2.00
9g. Construction of Jamia Madrasa 5.00
Taleem Ul-Quraan Wal Sunnah
Village Behram Dheri Qutab Garh
Takht Bhai District Mardan.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
5c
6d.
7e.
8f.
9g.
10h.
11i.
Sector: Auqaf, Hajj, Religious & Minority Affairs PROGRESS REPORT/ REVIEW
Sub Sector: Religious Affair
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
New 190077 - Construction of Eid Gah & 8.000
156 Janazagah in Khyber Pakhtunkhwa.
1 i. Sub Head: UC Khazana Dheri Rev.
PK˗53. 4.000
07-09-20
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
156
1 1. 80% i. Grey structure completed.
ii. Site identified and work will b
soon.
Non
ADP
MONTHLY PROGRESS REPORT
(ABSTRACT)
New:
NADP - -
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Solar System. 100% -- -- 100% Completed & Handed Over.
169 CCTV system.
Net work system.
OG
184
1 Site not yet cleared.
10.000
OG: 1 1 1 206.858 206.421 - - - -
Compact
New: - - - - - - -
NADP: - - - - - -
TOTAL: 10.000
1 1 206.858 206.421 - - - -
1 Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Main Bldg. 100% -- -- 100% Completed & Handed Over.
180 G. Floor
F. Floor
2nd Floor
2. DSP office
3. Mosque
4. Parking
5. Repair to old building
Dev: work
B/Wall
6. Judiciary Building
MONTHLY PROGRESS REPORT
(ABSTRACT)
1328.213
OG: 7 5 4 1105.408 969.408 75.756 3.562 60.478
Compact
New: - - --
NADP
TOTAL: 1328.213
5 4 1105.408 969.408 75.756 3.562 60.478
7 Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG
205
i.
OG 1. 06 Nos. Class Rooms. 25x16 85% 15% - 85% No of In
2. 1 Staff Room. 12x20 N/S Dispute
387 Units Prog:
3. Head Master Room. 10x16
4. Bath Room. 6x5.7 1/2 8 1 -
5. Stair Hall. Completed. PC-IV submitted to Ed
6. Veranda = 9' O/A
7. Internal Electrification.
8. Internal Water Supply.
9. Boundary Wall = 382'
10. Group Latrine = 4 Nos
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1-06 05 Class Rooms. 25x16 91% 9% 50% 95% No of In
Staff Room. 12x20 N/S Dispute
388 Units Prog:
3- Head Master Room. 10x12
4- Bath Room. 6x5.7 1/2 18 2 -
5- Stair Hall.
Internal Electrification.
Internal Water Supply.
Boundary Wall.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
9 50% 50% 40% 90%
Finishing in progress.
10
Completed & Handed Over.
11
Completed & Handed Over.
12
Completed & Handed Over.
13
Completed & Handed Over.
14 50% 50% 20% 90% MB = Finishing in progress. B/Wall =
progress. Developmental work in progr
15
Completed & Handed Over.
16
Completed & Handed Over.
17
Completed & Handed Over.
18
Completed & Handed Over.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Primary Education
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1-06 Nos. Class Rooms. 25x16
Staff Room. 12x20
75% 25% 50% 80% No of In
N/S Dispute
389 6- Head Master Room. 10x12 Units Prog:
7- Bath Room. 6x5.7 1/2
8- Stair Hall. 16 5 -
Internal Electrification.
Internal Water Supply.
Boundary Wall.
1
Completed & Handed Over.
2
Completed & Handed Over.
3 1. Main Building Finishing in pr
2. B/Wall = Finishing in progres
4 100%
Completed & Handed Over.
5
Completed & Handed Over.
6
Completed & Handed Over.
7
Completed & Handed Over.
8 Completed, PC-IV Submitted.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Primary Education
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
9 Main Building = Completed.
B/ Wall = Completed. PC-IV in
10
Completed & Handed Over.
11 Main Building = Flooring in Com
B/W = Completed.
F/F = Plastering in progress.
12
Completed & Handed Over.
13
Completed & Handed Over.
14
Completed & Handed Over.
15
Completed & Handed Over.
16
Completed & Handed Over.
PROGRESS REPORT/ REVIEW
Sub Sector: Primary Education
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1-08 Nos- Class Rooms. 25x16 46% 54% 25% 71% No of In
Staff Room. 12x20 N/S Dispute
390 Units Prog:
9- Head Master Room. 10x12
10- Bath Room. 6x5.7 1/2 10 5 -
11- Stair Hall. Internal Electrification.
Internal Water Supply.
Boundary Wall.
11 GPS Gujrat Moh: Kashmir Abad PK- 20.019 17.488 04-09-19 6.413
50. 11-01-18
12 GPS Zargar Killi Babeni PK-50. 18.721 16.296 15.703
18-04-16 14-04-17
13 GPS Kot Daulat Zai No.2 PK-50. 21.523
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
9 1. B/Wall DPC Level.
2. Tube well completed.
10
13
14
16
PROGRESS REPORT/ REVIEW
Sub Sector: Primary Education
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1-06 Nos. Class Rooms. 25x16 - - - -
391 Staff Room. 12x20
12- Head Master Room. 10x12
13- Bath Room. 6x5.7 1/2
14- Stair Hall.
Internal Electrification.
Internal Water Supply.
Boundary Wall.
1
OG 1-06 Nos. Class Rooms. 25x16 26% 74% 30% 56% No of In
Staff Room. 12x20 N/S Dispute
392 Units Prog:
15- Head Master Room. 10x12
16- Bath Room. 6x5.7 1/2 9 9 -
17- Stair Hall.
Internal Electrification.
Internal Water Supply.
Boundary Wall.
1 100% Completed.
3 FF Roofing in progress.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
6 1. MB = Finishing in progress.
2. B/Wall completed.
7
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG G/f C/Room 4 Nos 25x16 No of In
F/F C/Room 4 Nos 25x16 N/S Dispute
393 Units Prog:
B/ Wall
G. Latrine 1 - 1
Water supply
Int. Elect.
OG
397
3
MONTHLY PROGRESS REPORT
(ABSTRACT)
3739.455
OG: 20 16 8 4593.998 2760.730 592.824 29.209 417.070
Compact
New: - --
NADP -
TOTAL 3739.455
16 8 4593.998 2760.730 592.824 29.209 417.070
20 Compact
2395.677
10-10-17
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Package-I (M/S Takht Bhai)
1. Administration Block
10% 30% 25% 25% Package-I
1. Roof Level.
401 2. Academic Block 2. G/F Roof laid. F/F Roofing in progress.
3. Plastering in progress.
3. Mess Block 4. Foundation in Progress.
4. Gymnasium Blocks 5. Roof Level.
5. Common Facilities
Package-II
Package-II (M/S Zahir Shah & Brother) 1. 06 Beded Hostels (5 Nos):
1. 06 Bed Hostel Blocks (05 Nos) i. = Hostel No. 1 = G/F Roof laid.
2. Cafeteria Block ii. = Hostel No. 2 = DPC Level.
iii. = Hostel No. 3 = Roof Laid.
3. Masjid & Prayer Hall. iv. = Hostel No. 4 = G/F Roof Laid. F/F in progress.
4. Dispensary Block. v. = Hostel No. 5 = Flooring in progress.
2. DPC Level
Package-III (M/S Zain Ul Abideen) 3. DPC Level.
1. Senior Teacher Flats. 4. Not yet started.
2. Junior Teacher Flats.
3. Principal Residence. Package-III
1. SSR:
4. Residence for House Mistress. i. G/F Roof Laid. F/F Roof laid.
5. Guest House. ii. G/F & F/F = Roof laid.
6. Staff Club. iii. Roof Laid.
7. Bachelor Staff Barracks (03 Nos). iv. G/F & F/F = Roofing in progress.
8. Staff Flats (06 Blocks) BPS-1. 2. JSR
i. DPC Level.
Package-IV (Mr. Sher Niaz Khan) ii. DPC Level
iii. F/F = Roofing in progress.
1. B/Wall
iv. Structure completed.
2. OHT 3. DPC Level.
3. Tube Well 4. DPC Level.
4. Turfing of lawn 5. Not yet started.
5. Drain. 6. DPC Level.
7. -do-
8. -do-
Package-IV.
1. East, North and West side B.B completed.
2. Roof in progress.
3. Work not yet started.
4. -do-
5. -in progress.
East Side + North Side = Finishing in Progress.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 140197 - Up-gradation of 100 Govt: -- 199.617 121.378 -- 157.333
409 High Schools to Higher Secondary 01-09-16
level in Khyber Pakhtunkhwa (B&G)
on need basis (SBSE). Sub Head:
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Lab 4 Nos 25x30 78% 22% 5% 83% No of In
2. Room 4 Nos 30x20 N/S Dispute
409 Units Prog:
3. store 2 Nos 10x7
4. office 2 Nos 10x10 8 3 -
5. office 1 No 10x14
6. store 1 No 10x10
7. wash 1 no 10x25
8. Intl: Electn:
9. Intl; Water supply
10. Ext: W/S
11. G.Lev: 12. B/Wall
12. Ext: Electn:
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Reconstruction of existing building. 88% 12% 5% 95% No of In
N/S Dispute
411 Units Prog:
19 2 -
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
11 Completed.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. G.F C/Room 6 Nos 24'x20'
i. Lab with Office & Store 20x30 30% 40% 15% 45% No of In
N/S Dispute
413 ii. Principal 1 No. 14x20
iii. Clerk 1 No. 14x20
Units Prog:
iv. Hall 1 No. 40x70
v. Ver. 11.25 O/All 5 5 -
2. F.F
i. Lab with Office & Store 20x30
ii. Store 20x20
iii. Staff Room 1 No. 14x20
vi. Ver. 11.25 O/All
v. Lav; Block 1 No.
vi. Boundary Wall
vii. Chowkidar Hutt
viii. Internal Water Supply
ix. Internal Electrification
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 2 Nos C/R 24x20 35% 65% - 35% No of In
Drg: Room 30x20 N/S Dispute
414 Units Prog:
Lab: Store, Staff Room & H/M office,
4 3 -
Clerk Bath, Int. Elect. & Int. W/S, B/W
2 GGHS Sher Dil Khan Killi PK-54. 33.665 26.105 24-10-17 21.930
28-11-16 22-5-19
3 GGHS Pir Abad PK-54. 34.000 24.432 22-06-17 14.020
28-11-16 20-9-18
4 GGHS Takkar PK-55. 28.653 19.857 14-05-18 15.800
14-06-17 22-11-19
5 GGHS Babeni PK-50. 32.315 29.035 20-11-17 31.433
14-06-17 28-03-19
6 GGHS Bahi Khan PK-50. 35.637 -- -- --
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG G/F C/R 2 Nos 24'x20' 2 Nos Lab 30'x20' 48% 52% - 48% No of In
Lab Office 4 Nos 10'+9.5' Veranda 10' N/S Dispute
415 Units Prog:
First Floor 2 Nos 24'x20' 2 Nos Lab 30'x20'
Lab Office 4 Nos 10'+9.5' Veranda 10' 5 3 -
4 Finishing in progress.
7
PROGRESS REPORT/ REVIEW
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1- G.F C/Room 6 Nos 24’x20’.
i- Lab with Office & Store 20x30.
- 100% - - No of In
N/S Dispute
416 ii- Principal 1 No. 14x20. Units Prog:
iii- Clerk 1 No. 14x20.
iv- Hall 1 No. 40x70. 3 - 3
v- Ver; 11.25 O/All.
2- F.F.
i- Lab with Office & Store 20x30.
ii- Store 20x20.
iii- Staff Room 1 No. 14x20.
vi- Ver; 11.25 O/All.
v- Lav; Block 1 No.
vi- Boundary Wall.
vii- Chowkidar Hutt.
viii- Internal Water Supply.
ix- Internal Electrification.
4 Excavation in progress.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG C/Room 3 Nos 25x16 34% 66% - 34% No of In
H/M Office 10x14 N/S Dispute
417 Units Prog:
Bath, G/L
Int: Elect: 2 1 1
Int: W/S
B/W
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG C/Room 4 Nos. 24x20 No of In
N/S Dispute
419 Lab 4 Nos. 33x20 Units Prog:
Pr, Room 4 Nos. 9x20 1 1 -
1
2
3 1. Main building = Finishing in progre
2. B/Wall in Finishing.
OG No of In
N/S Dispute
420 Units Prog:
1
2
3
OG
421
1
3
4
6
PROGRESS REPORT/ REVIEW
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG C/Room 4 Nos. 24x20 No of In
N/S Dispute
422 Lab 4 Nos. 33x20 Units Prog:
Pr. Room 4 Nos. 9x20 8 5 2
I
1
2 G/F - Filling in progress.
F/F - Shuttering in progress.
3
4
5
6
7
II C/Room 3 Nos 25x16.
H/M Office 10x14.
Bath, G/L.
Int: Elect:.
Int: W/S.
B/W.
1
2 95% Main Building Completed. Group L
Completed. B/Wall Completed. De
Work in progress. Electrical Work
3
4
5
6
7
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
III Construction of Examination Hall: 42.064 30.011
02-04-18
1 GGHS Saro Shah PK-54 shifted to 10.516 Submitted 27-02-20 3.163
GGHS Dako Baba. 02-04-18 9.756
2 GGHS Pirsadi PK-55. 10.516 10.110 24-07-19 4.401
02-04-18
3 GGHS Bala Garhi PK-51. 10.516 9.936 13-09-19 7.604
02-04-18 06-12-19
4 GGHS Babeni PK-50. 10.516 9.965 26-09-19 6.723
02-04-18 06-12-19
5 GGHS Lundkhwar PK-54. 13.380
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
III E-Hall 40x70.
Internal Water Supply.
Internal Electrification.
1 80% Flooring in progress.
Plaster in progress.
2 Roof laid.
Plastering in progress.
3 Completed & Handed over.
9
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
IV Up-gradation of Middle School to 81.62 11.879
High level: 02-04-18
1 GGMS Kaudari Bala PK-55. 40.681 Submitted 15-11-19 3.834
02-04-18
2 GGMS Matha Jadeed PK-48. 40.681 Submitted 02-01-20 8.045
02-04-18
3 GGMS Khan Pur PK-53. 39.681
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
IV C/Room 3 Nos. 24x20 No of In
Library. 1 No. 24x20 N/S Dispute
Units Prog:
Lab 2 Nos. 30x20
Pr; Room 2 Nos. 24x20 2 2 -
Hall 1 No. 40x70 1. Main Building G/F Finishing
Staff Room 1 No. 16x12
Clerk Office 1 No. 8x10 2. F/F Flooring in progress.
Head Master 1 No. 12x10 3. B/W in progress.
Internal Water Supply 4. Plaster in progress.
Internal Electrification 5. Exam Hall Roof Level.
New
425
1
2
3
4
5
New
426
i.
ii.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
New 200026 - Up gradation of 150 Primary
434 Schools to Middle Level (B&G) on
need basis in Khyber Pakhtunkhwa.
Sub Head:
i. GGPS Khadi Killi U/C Maho Dheri. 13.064
ii. GPS Hisar Banda Lund Khwar PK-55. 14.430
iii. GPS Ikram Pur Baizo Kharki PK-48. 11.709
iv. GGPS Salak Banda. 12.841
v GPS Sar Bata U/C Bazaar. 13.250
vi. GGPS Gumbat Hayat Gul Koroona PK-51. 13.129
vii. GGPS Shad Ali Khan Gumbat PK-51. 13.130
viii. GGPS Jaba Mayar 13.148
ix. GPS Beroch PK-49. 13.120
x. GPS Khat Killi PK-55. 18.630
xi. GPS Baro Banda PK-50. 19.466
xii. GGPS Sharif Abad U/C Pat Baba. 17.286
xiii. GGPS Soor Pul U/C Ghaladher PK-52. 18.364
xiv. GGPS Swato Baido Saro Shah. 14.726
xv. GGPS Maho Narai PK-53. 13.064
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
434
i.
ii.
iii.
iv.
v
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
xv.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
New 200027 - Up gradation of 100 Middle
435 Schools to High Level (B&G) on need
basis in Khyber Pakhtunkhwa. Sub
Head:
i. GMS Kandary No. 2 U/C Khazana 34.582
Dheri District Mardan.
ii. GGMS Safoor Banda PK-48 District 46.190
Mardan.
iii. GMS Gunjai PK-54. 44.386
iv. GMS Anwar Khan Killi PK-54. 36.137
v. GGMS Narshak PK-50. 34.590
vi. GMS Muhammad Din Killi PK-55. 36.220
vii. GGMS Duryal Moti Banda PK-55. 43.906
viii. GGMS Gad Bano Killi PK-51. 34.673
New 200028 - Up gradation of 100 High
436 Schools to Higher Secondary Level
(B&G) on need basis in Khyber
Pakhtunkhwa. Sub Head:
i. GGHS Manga in District Mardan. 48.660
ii. GHS Shah Baig PK-54. 33.869
iii. GGHS Sheikhano Banda (Redi Baba). 33.501
iv. GHS Gumbat PK-51. 33.810
v. GHS Sokai PK-52. 33.680
vi. GHS Garhi Daulat Zai PK-51. 33.780
vii. GGHS Maday Baba. 41.523
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
435
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
New
436
i.
ii.
iii.
iv.
v.
vi.
vii.
Sector: Elementary & Secondary Education PROGRESS REPORT/ REVIEW
Sub Sector: Secondary Education
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
New 200131 - Reconstruction of 300 Govt.
438 Schools (100 Primary, 100 Middle &
100 High) (B&G) on need basis in
Khyber Pakhtunkhwa. Sub Head:
i. GHS Pati Kalan PK-54. 44.082
ii. GPS Ward No. 03 Takht Bhai PK-55. 21.680
iii. GPS Qutub Garhi Takht Bhai PK-55. 21.648
iv. GGPS Lundkhwar PK-55. 22.612
v. GGPS Jandar Par Gujar Garhi PK-54. 28.627
vi. GHS Dako Baba Takht Bhai PK-54. 50.706
vii. GHS Lundkhwar PK-55. 34.908
viii. GPS Sohbat Abad U/C Ghaladher PK- 21.658
52.
ix. GPS Ghaladher No. 1 PK-52. 22.596
x. GMS Hoti Landaki. 24.336
xi. GHSS Ghaladher No. 1 PK-52. 57.984
xii. GPS Machi PK-49. 20.008
Non Establishment of GGPS Surkh Dheri 22.050
ADP PK-52 Mardan.
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
438
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
Non
ADP
MONTHLY PROGRESS REPORT
(ABSTRACT)
30.000
OG: 1 1 1 74.967 57.000 - 6.875 - 6.300
Compact
New: - - - - - - -
NADP: - - - - - -
TOTAL: 30.000
1 1 74.967 57.000 - 6.875 - 6.300
1 Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Bachelor suits 10 Nos. 68% 32% 12% 80% 1. Completed and Handed Over.
626 2. Type-III Residence 2 Nos 2. Finishing in progress.
MONTHLY PROGRESS REPORT
(ABSTRACT)
60.00
OG: 2 2 2 11.962 5.229 - - - -
compact
New: - - - - - - - -
NADP - - - - - - - - -
60.00
TOTAL 2 2 2 11.962 5.229 - - - -
compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG
660
1 100% B/Wall = Completed & Handed
OG 1- Bed Room 14'x16' 90% 10% 5% 95% Completed & Handed Over
661 2- Bed Room 12'x13'
3- Toilet 7'x5'
4- Kitchen 10'x9'-6''
5- Lounge 12'x15'
6- Bed Room 12'x14'
7- Bath 9'x5'
MONTHLY PROGRESS REPORT
(ABSTRACT)
933.338
OG: 10 10 4 8881.73 4085.338 1051.885 198.584 413.468
Compact
Non
ADP : -
III deposit
- 9.689
New: -
TOTAL 933.338
10 4 8881.73 4085.338 1051.885 198.584 413.468
10 Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG
722
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Main Bldg: G/Ist Floor.
2. Gynae OT Labour Room.
67% 33% - 67% No of In
N/S Dispute
725 3. Mortuary. Units Prog:
4. Mosque.
5. Catt: III Resd: 3 Nos. 4 4
6. Catt: IV & V 5 Nos.
7. Developmental Works
3 B/Wall = completed
Main bldg: G/F flooring completed, FF flooring
O.T finishing in progress
Catt: V 03 Nos qtr: finishing g in progress
Catt III Residence = roof level
Cat: IV Roof laid
Over Head Tank 1000 gh = completed
Road= sub base in progress.
Drain = completed
Mortuary =Roof laid, Romp = Roof laid
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Main Building 50% 50% - 50% 1. Main Building Finishing in pr
733 2. Mortuary = Not started (
3. Guard Room = ----do--
2. Mortuary 4. Public Lav. = ----do—
3. Guard Room 5. Garages = ----do—
4. Public Lav. 6. Type III = ----do—
5. Carriage 7. Type-IV = ----do—
6. Type - III (4 Nos) 8. Type V = ----do—
7. Type - IV Flats (4 Nos) 9. Boundary wall = work in pro
8. Type - V Flats (4 Nos) 10. OHT = Not started (S
9. Boundary Wall 11. Site preparation & Drain in p
10. Over Head Tank
11. Site preparation & Drain
Sector: Health PROGRESS REPORT/ REVIEW
Sub Sector: General Hospital
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 100183 - Establishment of Shaheed C 1448.629 22-09-11 703.699
756 Mohtarma Benazir Bhutto Children R 712.716
2161.345
Hospital in Mardan PK-52. 19-9-2011
1st Rev:
C 1474.237
R 716.596
8-9-16
2nd Rev:
C 1698.285
R 908.716
T 2607.001
02-10-19
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Civil Works. 47% 53% - 47% 1. Civil Works
756 i. Main Hospital Bldg. i. Joinery in progress/ Ceiling/ Pain
ii. Doctor Hostel. progress.
iii. Nurses Hostel. ii. Completed & Handed Over.
2. Public Health 9 Gas works. iii. - do -
2. Public health work in main build
3. Electrification works. progress.
4. Telephone System. 3. Electrification work in main bui
5. Nurse Call system works. progress
6. Public Address 4. to 8 piping work completed, bala
7. security system + CCTV works yet started.
8. Fire Alarm system work. 9. Not yet started.
9. Fire fighting system works. 10. Bank guarantee submitted by co
10. Lifts Works (5 Nose). 11. Ducting completed. Out/Indoor
11. Air Conditioner Works. supplied.
12. Landscaping Works 12 = Work in progress
13. External Dev: works. 13 = under ground over head water
finishing in progress, boundary wal
line in progress.
Road work in progress.
HVAC work strated.
Sector: Health PROGRESS REPORT/ REVIEW
Sub Sector General Hospital
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 120333 - Improvement & 1830.680 Submitted 15-02-13 1708.220
757 Standardization of District Head 20-04-12
Quarters Hospital Phase-III Mardan.
1st Rev.
2939.590
07-01-20
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG A: Package-I (Male Section).
1. OPD/IPD.
84% 16% - 84% A: Package-I
1. Finishing in progress.
757 2. Admin Block. 2. Finishing in progress.
3. Doctor Hostels. 3. 80% completed.
4. Mosque. 4. Finishing in progress.
5. Cafeteria. 5. Finishing in progress.
6. General Store. 6. Plastering/ Flooring in progress.
7. Sarey. 7. Site not yet handed over.
8. Electrical Sub Station. 8. Completed.
9. Developmental Work:- 9. (i). Completed.
i. Under Ground Water Tank. (ii). 60% Completed.
ii. Sewerage Line. (iii) 80% completed.
iii. Car Park. 10. Work stopped due to shifting of Electric
10. Sky Bridge.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Construction of Boundary Wall & 72% 28% 10% 82% No of In
N/S Dispute
771 Repair work. Units Prog:
11 1 1
1 Completed.
2nd Rev:
C=1582.570
R = 84.99
19-11-2015
3rd Rev:
C 1765.493
R 81.734
1847.570
01-01-2020
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Bacha Khan Medical College Mardan 70% 30% - 70%
1. Academic Block 1. Finishing in progress.
800 2. Admn: Block 2. Completed & Handed Over, except Ai
3. Auditorium 3. Finishing in progress.
4. Mosque 4. Completed & H/O.
5. Girls Hostel 5. Completed & H/O.
6. Gymnasium 6. Completed & H/O.
7. Security office. 7. Completed & H/O.
8. Guest House 8. Completed & H/O.
9. Covered Arcade 9. Deleted in Revised PC-I.
10. Boys Hostel 10. Completed & H/O.
Developmental Work Developmental Work.
1. Over Head Water Tank. 1. Completed.
2. Underground Water Tank 2. Completed.
3. Boundary Wall. 3. Completed.
4. Sewerage Line. 4. Completed.
5. Road Work. 5. Completed.
6. Land Scapping. 6. In progress.
7. Lift Work 7. Procurement under process.
8. Air Condition Work. 8. Work on hanging ans support system f
and drainage system in Auditorium and Ac
Ground Floor in progress.
New
806
i.
Sector: Health PROGRESS REPORT/ REVIEW
Sub Sector: Medical Education and Training
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 120888 - Integration of Health 10.450 10.037 9.689
807 Services Delivery with Special Focus 06-06-17
on MNCH, LHW, EPI and Nutrition
Programme (Aus-Aid & DFID
Assisted). Sub Head (Deposit work):
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Repair Work. 93% 7% - 93% No of In
N/S Dispute
807 Units Prog:
7 - -
5 Completed.
7 Completed.
MONTHLY PROGRESS REPORT
(ABSTRACT)
767.299
OG: 5 4 2 1570.182 1535.047 - 172.302 18.228 134.385
Compact
New - - -
NADP - - - - - -
767.299
TOTAL 5 4 2 1570.182 1535.047 - 172.302 18.228 134.385
Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Main Building
i. G/Floor 20354 Sft
100% 100%
909 ii. F/Floor 26354 Sft
No of
Units
In
Prog:
N/S Dispute
2. Admn: Block 3688 Sft
3. Hostel i.G/Floor 9347 Sft ii. F/Floor
4. Cafeteria 2870 Sft
5. Guard Room 1995 Sft 4 - -
6. Developmental Works
i. B/Wall ii. Internal road iii. Drain.
iv. Leveling dressing v. Foot Path
vi. Ext: W/S sewerage system
vii. Street light viii. Tube well boring
ix. Pumping chamber
x. Constn: of Over Head Tank
xi. Main Supply line & Hosting
xii. Pumping Machinery
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Main Building 4% 96% 20% 24%
i. G. Floor 1. G/F = Brick work in progress.
910 ii. F. Floor 2. Roof in progress.
2. Multi purpose Hall 3. Roof level.
3. Administration
4. Staff suits 4. Not yet started.
5. Day Care Center 5. Brick work in progress.
6. Cafeteria 6. Not yet started.
7. Guard Room 7. Not yet started.
8. Watch Tower 8. Not yet started.
9. Boundary Wall 9. - do -
10. Parking & Foot Path 10. North side B/Wall = Finishing in p
11. Sewerage South side = DPC Level.
12. Open Drain
13. Over Head Tank
14. Retaining Wall
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG - 50% - -
912
1 Site not cleared.
OG Class Room 6 No
Water Supply No of In
Boundary wall N/S Dispute
914 BS Block Units Prog:
Class Room 5 Nos
Class Room 6 Nos 8 7 1
BS Block
1 06 Nos Class Rooms 30' x 20' with G/F & F/F = Finishing in progre
Vernadah.
2 1. OHT. Completed.
2. Tubewell boring
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
5 Main Building Ground & First Floor. 75% G/F = Flooring in progress.
F/F = Flooring in progress.
6 05 Nos Class Rooms 30'x20' with F/F = Group Laterine Column in
Verandah. G/F = Completed.
7 06 Nos Class Rooms 30'x20' with G/ F & F/F = Floring in progres
Verandah.
8 Main Building Ground & First Floor. 75% G/ F & F/F = Finishing in progr
OG:
New: 1
NADP
TOTAL:
1
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
1028
MONTHLY PROGRESS REPORT
(ABSTRACT)
OG:
New: 3
NADP
TOTAL:
3
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
New
1134
1
MONTHLY PROGRESS REPORT
(ABSTRACT)
94.629
OG: 4 4 1 1378.443 278.689 - 75.504 - 50.256
compact
New
- - - -
NADP - - - -
94.629
TOTAL 4 4 1 1378.443 278.689 - 75.504 - 50.256
compact
OG 140301 - F/S & Master Planning for 250.000 Submitted 19-02-18 96.850
1164 Construction of Model Anti-Terrorism 22-05-17
Court (PC-II) approved on 30-9-2014.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Civil work GF& F/F 100% -- - 100% Completed & Handed Over.
1143 2. Boundary wall /Dev: work.
3. Internal water supply.
4. Internal Electrification.
OG 1. Judicial complex (main building).Ground to third floor. 5% 95% 15% 20% 1. Main Building Revised PC-I in prog
2. Lockup Building.
1153 3. Bar Room.
4. FF = flooring in progress
4. Bachelor Officer Hostel. B/Wall in progress.
5. Common Facility Building. 9. Judges apartments = G/F = plasterin
6. Lawyers / agent sheds. F/F = Plaster
7. Public Toilets (2 Blocks).
8. Senior Judges Residence.
8. Plinth level
9. Judge Residence (02 Nos) 14. Work in Superstructure.
10. Security Guard Barracks/Building. Road work in progress.
11. Security Public Facilitation Building. 15. Drain in progress.
12. Watch Tower (08 Nos.)
13. Guard Room Cum Watch Tower (06 Nos.)
14. OHT, 15. Drain
OG Construction of Masjid. 27% 71% 71% 100% Completed & Handed Over.
1168
MONTHLY PROGRESS REPORT
(ABSTRACT)
153.998
OG: 2 2 142.376 44.272 91.900 1.264 83.492
compact
New:
NADP
153.998
TOTAL 2 2 142.376 44.272 91.900 1.264 83.492
compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG Total Scope of work in ADP 736 8% 92% - 8% No of In
N/S Dispute
1416 i. Ground Floor. Units Prog:
ii. First Floor.
iii. Second Floor. 3 3 -
iv. Boundary Wall.
v. Internal Elec.
vi. Internal Water Supply & SI.
vii. Fire Brigade post.
viii. Tube Well boring & pumping machinery.
ix. Pumping chamber.
x. Over head water tank 10000 gallons.
xi. Service deck for vehicles.
xii. External Elec:
317.356
OG: 6 4 2 357.247 379.098 58.821 2.399 31.465
Compact
New: 1 - - -
NADP - - - -
317.356
TOTAL 7 4 2 357.247 379.098 58.821 2.399 31.465
Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1. Play Ground. 33% 67% 50% 50% Boundary wall = 80% completed.
Football Pavilion = 70%
2014 2. Pavilion. Toilet = Finishing in progress
3. Toilets. Ground: Cut/Fill in progress
Cricket Pavilion in progress Plastering in Progre
4. Squash Court. portions + Flooring in progress.
Hostel/ Offices Roof Laid. Squash Court Floorin
5. Hostel/ Office.
6. Developmental Works.
i.
OG 92% 8% - 92% No of In
N/S Dispute
2019 Units Prog:
3 1
1 1. Filling, setting area. Completed & Handed Over
2. Chowkidar Huts.
3. Internal Electrification.
4. External Electrification.
2 1. Pavilion & Steps. Completed & Handed Over
2. Internal Water Supply.
3. Internal Electrification.
3 1. Pavilion & Steps. Cricket Pavilion = Completed.
2. Boundary Wall. Boundary wall = Completed.
3. Internal Water Supply.
4. Internal Electrification.
4
PROGRESS REPORT/ REVIEW
Sector: Tourism, Sub Sector: Sports
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 140745 - Improvement, Restoration & 21.600 22.203 27.198
2020 Rehabilitation of Existing Sports 20-2-15
Facilities in Khyber Pakhtunkhwa.
Sub Head:
1 Rehabilitation of Badminton Court at 1.200 1.295 14-05-15 1.295
Pirano Park PK-53 Mardan. 21-02-15 30-06-16
2 Improvement and Rehabilitation of 2.898 3.139 25-03-16 3.300
Sports Complex PK-52 Mardan. 21-02-15 22-02-17
3 Play Ground Pir Abad PK-54. 5.966
21-02-15
4 Sports Stadium Hathian PK-55. 5.306 4.809 5.202
21-02-15 23-08-16
5 Construction of Stadium at Shamozai 6.230 Submitted 4.230
PK-48. 21-02-15 6.487
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 86% 14% - 86% No of In
N/S Dispute
2020 Units Prog:
9 4 2
1 1. Repair Works. 100% Completed & Handed Over.
2 1. Tuff Tiles.
2. Internal Water Supply.
100% Completed & Handed Over.
3. Internal Electrification.
3 1. Changing Room.
2. Valley Ball Court.
Work stopped due to stay order.
3. Basket Ball Court.
4. Small Setting pavilion.
5. Leveling of ground.
6. Internal Electrification.
7. Water Supply.
4 1. Changing Room.
2. Valley Ball Court.
100% Completed & Handed Over.
3. Basket Ball Court.
4. Small Setting pavilion.
5. Leveling of ground.
6. Internal Electrification.
7. Water Supply.
5 1. Changing Room
2. Group Latrine.
1. Flooring in progress.
2. Not yet started.
3. Multi Purpose Halls. 3. Not yet started.
4. Foot Ball poll. 4. Not yet started.
5. Valley Ball Poll 5. Completed.
6. Basket Ball Court. 6. Completed.
7. Bed men ton Court. 7. Floor laid.
8. Leveling of ground. 8. Partially completed
9. Internal Electrification. 9. Not started.
10. Water Supply. 10. In Progress.
PROGRESS REPORT/ REVIEW
Sector: Tourism, Sub Sector: Sports
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
6 Lundkhwar College Sports Stadium 9.00 TS
PK-55. Submitted
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
6 Volley Ball/ Badminton/ Basketball
Court - Seating Steps, Football Goal
Post.
7 Leveling of Ground/ Filling 1. Badminton Hall = Completed.
2. Athletic Track Leveling, Completed.
Badminton Hall + Athletic Track. Playground = Completed. Balance Work - B/Wa
10
Sector: Tourism PROGRESS REPORT/ REVIEW
Sub Sector: Sports
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 180552 - Standardization and 258.771 - - -
2023 Up˗gradation of Sports Complex at 01-09-20
D.I.Khan, Bannu, Haripur & Mardan.
Sub Head:
1 Athletic Tartan Track at Sports 89.792
Complex Mardan. 01-09-20
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG -- -- -- --
2023
4
Sector: Tourism PROGRESS REPORT/ REVIEW
Sub Sector: Sports
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 180553 - Development of 1000 49.155
2024 Playing Facilities in Khyber 20-04-20
Pakhtunkhwa. Sub Head:
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG
2024
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
11 80% Completed.
14 1. Pitches Completed.
2. Lavatory Block Completed.
3. Parking shed Completed.
15
16
18
19
20
21
Sector: Tourism PROGRESS REPORT/ REVIEW
Sub Sector: Sports
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
OG 180561 - F/S and Establishment of -- 82.971 Submitted 15-09-19 45.123
2027 Female Indoor Sports Facilities at 26-6-19
Divisional Head Quarters in Khyber
Pakhtunkhwa.
Sub Head: Construction of
Gymnasium for Female & Multi
Purpose Hall at District Mardan.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG i. Gymnasium 100% 40% 50% i. Plastering in progress.
2027 ii. Multipurpose Hall = 04 Nos ii. Plastering in progress.
iii. Boundary wall in progress.
OG
2000
New
2056
1 Shekre Baba. Site not cleared.
2 Shaheeda Sar. - do -
3 Sar Malang. - do -
4 Babuzai. - do -
5 Katti Garhi. - do -
MONTHLY PROGRESS REPORT
(ABSTRACT)
700.00
OG: 2 2 229.750 156.753 15.627 47.000 8.087 43.584
Compact
New - - -
NADP - - -
700.00
TOTAL 2 2 229.750 156.753 15.627 47.000 8.087 43.584
Compact
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
OG 1-Main Building
2- Boundary Wall
45% 55% 20% 65% 1. GF Finishing in progress.
F/F Finishing in progress.
2172 3- Road Walk Way 2. Completed.
4- Ext; Elec 3. In progress.
5- Bore Hole + pump 4. OHT = Work in progress.
6- Wapda (Transformer) 6. Payment made to WAPDA.
7. Bus Bay 7. Bus Bay Roofing Completed.
OG
2173
ii 1- Main Building
i- G.Floor
100% Completed and Handed Over.
ii- F.Floor
2- Boundary Wall
3- E Gaming Equipment
4- Int; Elect
5- Int; Water Supply
MONTHLY PROGRESS REPORT
(ABSTRACT)
OG: 1
IIIrd 1 1 17.000 59.567 - - 292.206 2.396 31.426
Deposit
New:
District 1 180.655 97.685 - - 37.063
Govt:
AOM&R
1 12.826 - - -
NADP
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
II
2 Completed
5 Finishing in progress
6 Completed.
PROGRESS REPORT/ REVIEW
Sector: District Development Programme
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
7 Solarization System at RHC Shergarh R-2.000 Submitted
PK-55. 29-6-20
8 Solarization System at RHC Manga 2.000
PK˗53.
9 Solarization System at Cat-D Hospital 2.000
Lund Khwar.
10 Solarization System at Cat-D Hospital 2.000
Shahbaz Garhi PK-51.
11 Solarization System at Cat-D Hospital 2.000
Katlang PK-49.
12 Solarization System at Cat-D Hospital 2.000
Rustam PK-49.
13 Construction of Parking sheds at DHO 1.500 1.485
Office Mardan.
14 Providing installing & Fixing of 1.200 1.200 09-12-18 1.180
submersible Electric motor 40 HP etc.
complete at Cat-D Hospital Katlang.
15 Construction of Building for Distt: O 10.112 10.992 18-12-17 10.970
Resource Center for women Mardan. R 11.614 26-8-19
16 Construction of Boundary wall 1.500 1.262 16-5-18 1.243
Renovation and electricity work in the 11-11-20
Office of the AD-LG Mardan.
17 Construction of Janazgah at Bakhshali 0.850 0.717 0.717
Union Council Bakhshali PK-50
(Balance Work).
18 Reconstruction of Civil Dispensary 3.058 1.838 01-03-19 1.574
Garhi Kapoora PK-51.
19 Reconstruction of Additional Deputy 10.453 18.04-20 6.456
Commissioner Court/ Office Mardan. 14-11-19
Rev: 12.136
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
7 Completed.
10 Completed.
11 Work in progress.
12 Completed.
17 Completed.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
20
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
11 Lead protection. Lead protection in X-Ray Room
13 LHV Training hall, Bathroom, Waiting 100% Completed & Handed Over.
area.
14 Training hall, Bathroom, Boundary Completed & Handed Over.
wall.
15 Waiting area. Finishing in progress.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
19 Repair work. 100% Completed & Handed Over.
20
i. Finishing in progress.
ii.
iii.
v.
vi.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
21 95% work completed.
22
23
ii. Completed.
iii. Completed.
iv. In progress.
v. 70% Completed.
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
2 Maintenance & Repair (M&R) Fund 5.564 6.726 5.033
2017-18. Sub Head: 25-5-17
i Deputy Commissioner’s Residence 0.507 0.084
Mardan.
ii Bungalow No. 5 Tehsildar Rustam 0.200
Shamozai Road Mardan.
iii Bungalow No. 8 (Tahir) Shamsi Road 0.200 0.125
Mardan.
iv Bungalow No. 4 (PA to DC) Qazi 0.398 0.320
Bashir Road Mardan.
v Office of the District Officer (F&P) 1.302 0.791
Mardan.
vi Bungalow No. 3 (DO F&P) Qazi 0.400
Bashir Mardan.
vii Bungalow No. 2 (Medical Officer) 0.300
Qazi Bashir Road Mardan.
viii Bungalow No. 5 (Finance Officer) 0.500 0.403
Qazi Bashir Road Mardan.
ix Bungalow No. 9 (Nazim District Govt) 1.419
Qazi Bashir Road Mardan.
x Bungalow (Qaisar Khan) Malakand 0.300 0.195
Road Mardan.
xi Circuit House Mardan. 1.200 0.528
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
2
i Completed.
ii Completed.
iii
iv Completed.
v Work Completed.
vii In progress.
viii Completed.
ix Completed.
x Completed.
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
3 AOM&R/Special Repair & 0.500 0.422 0.450
i Maintenance of Office Building of 01-6-17 17-4-19
Senior Civil Judge Mardan.
ii AOM&R/Special Repair & 0.500 0.422 0.450
Maintenance of Residential Building 01-6-17 17-4-19
of Senior Civil Judge Mardan.
4 Repair of Office Building of District & 0.600 Submitted 0.600
i Session Judge, Mardan. 14-6-17
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
3 Completed.
i
ii 75 % Work Completed.
4 Completed.
i
ii Completed.
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
5 Maintenance & Repair (M&R) Fund 2.100 1.317
2017-18. Sub Head: 31-8-17
i Bungalow No. 6 (Acc Katlang). 0.400
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
5 Work in progress.
ii Completed.
iii
iv Completed.
v Completed.
vi Completed.
vii Completed.
1 Completed.
2 Completed.
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
3 AOM&R Special Repair of all Govt. 5.506 5.400
Residential/Non-Residential Buildings 30-3-18
in District Mardan (2017-18).
4 AOM&R Special Repair of all Govt. 5.500 5.450 4.555
Residential/Non-Residential Buildings 24-12-19
in District Mardan (2019-20).
5 AOM&R (2019-20).
i Repair and Maintenance of Offices of 1.00
DS Mardan. 11-5-19
ii Repair and Maintenance of Residential 1.00
Building of DS Mardan. 11-5-19
6 AOM&R (2019-20).
i AOM&R of Residential Building of 0.500
SCJ Mardan. 9-5-19
ii AOM&R of Office Building of SCJ 0.500
Mardan. 9-5-19
7 AOM&R (2019-20). 25-5-19
i Repair and Maintenance of Office 0.100
Building of ATC-IV Matta Swat at
Mardan.
ii Repair and Maintenance of Residential 0.500
Building of ATC-IV Matta Swat at
Mardan.
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
3
ii
ii
ii
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
8 Rehabilitation Work of Khyber 3.821 2.158
Pakhtunkhwa House Mardan (2019- 24-5-19
20).
9 M&R ATC Judge Non Residential
Building Mardan. Sub Head:
i. Car Parking Shed at Judge Office 0.203 14-01-20
Building.
ii. JFC-I/ JFC-II/ Record Room/ Senior 5.500 2.814
Civil Judge/ Khurshed Iqbal, ADJ/
Sheraz Tariqm Magistrate/ Civil
Judge-XII/ Quratulain Mardan.
10 Maintenance & Repair of Residential/
Non-Residential Building during
2019-20 District Mardan.
Sub Head:
i. Maintenance & Repair of Office 3.000 2.554
Building of District & Session Judge
Mardan.
ii. Maintenance & Repair of Residential 3.000
Building of District & Session Judge
Mardan.
iii. Maintenance & Repair of Office 3.000 2.540
Building of Senior Civil Judge
iv. Mardan.
Maintenance & Repair of Residential 3.000
Building of Senior Civil Judge
11 Mardan.
Repair/ Rehabilitation work in Tehsil 10.015
Complex Takht Bhai District Mardan.
FOR THE MONTH OF MAY, 2021
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
8 In progress.
i.
ii.
10
i.
ii.
iii.
iv.
11
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
12 AO M&R Reconsrtruction/ Special
Repair to All Govt. Residential/ Non
Residential Buildings in District
Mardan During 2020-21. Sub Head:
i. Residential/ Non Residential Buildings 3.300
in District Mardan. 10-11-2020
13 AO M&R Emergent Nature Work in
Commissioner Office Mardan. Sub
Head:
i. 02 Posts at Commissioner Office 1.678
Mardan. 10-11-2020
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
12
i.
13
i.
14
15
16
17
PROGRESS REPORT/ REVIEW
Sector: AOM&R (District Govt:)
Status of Scheme Date of Expenditure the
ADP Sl. Total
Name of Scheme Commenc end of Previous
No. Cost A.A With T.S With ement Year
Date Date
1 2 3 4 5 6 7
18 Maintenance & Repair of Residential
Building during 2020-21 in Dsitrict
Mardan. Sub Head:
i. Repair & Maintenance of Office 2.005
Building of SCJ District Mardan.
ii. Repair & Maintenance of Residential 2.004
Building of SCJ District Mardan.
iii. Repair & Maintenance of Office 1.000
District Session Judge Mardan.
iv. Repair & Maintenance of Session
Judge Residence/ ADJS Residence
Building in Dsitrict Mardan.
19 Repair & Maintenance Work in BHU 1.144
Koragh.
Achieveme Total
nt to the Physical Achievem Achievem
ADP Sl.
Scope of the Scheme end of Target Dg. ent Dg. ent Since Physical Progress
No.
previous CFY CFY Commenc
year ement
14 15 16 17 18 19
18
i.
ii.
iii.
iv.
19
20
21
22
i.
1
S REPORT
PROVINCIAL PROGRAMME
District: Mardan. (Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - - - - - -
- - - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
16.800 1.500 1.500 1.500 8.938 100%
Compact
- - 2.680 6.982
-
-
- 2.320 3.320 -
3
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed & Handed Over. (Block A) Beyond
Completed. (Block B) 2020-21
mplement shed = completed.
2020-21
PROVINCIAL PROGRAMME
(Rupees in million)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - - - - - -
- - - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
12.000 5.000 4.000 5.000 5.000 17%
Compact
0.00 -- -- -- --
Compact
6
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
55% work completed. Beyond No. 3471/2-CHD
Finishing in progress. 2020-21
G Lavatories and Finishing work in Hall in
gress.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
13.690 0.440 - 0.184 0.434 42%
Compact 02-09-2020
- - - 4.000 -
- - 2.000 2.000
8
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted. 2020-21 Sanctioned
mpleted. 2020-21
Beyond
2020-21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
15.000 6.000 0.671 2.671 2.671 35%
Compact
- 2.000 2.000
10
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
11
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
12
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Sent to So (Dev) Auqaf Department Pehsawar
No.1133/2-W dated: 06-04-2021
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
8.430 7.170 1.108 2.700 2.700 100%
Compact
1.108 1.108 -
1.592 1.592
14
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
Grey structure completed. Roof level.
Site identified and work will be started
n.
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
10.766 -
10.766 -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
7.000 -- -- -- --
Compact
10.766
-- -- -- -- --
3.029
-- -- -- -- --
4.744
-- -- -- -- --
2.993
20.000
Compact
17
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted & Handed Over. Beyond
2020-21
Beyond
2020-21
e not yet cleared. Work order issued.
District: Mardan.
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- 206.421 - - - - -
- - - - - - -
- - - - - - -
- 206.421 - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
10.000 206.421
Compact
20
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted & Handed Over. 2020-21
21
S REPORT
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
292.885 - - - 115.992 -
Compact
16.576
- - 10.143
15.066
- - 13.949
12.820
13.574
14.570
14.371
23
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Sent to DEO (M) No. 930/2-W dated 01-
03-2021.
Completed 2020-21
N/S Dispute Total
Com H/O
- - 7 8
mpleted. PC-IV submitted to Education Deptt.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
480.167 0.880 0.542 1.55 247.881 80%
+ 0.400
1.280
+ 1.000
2.280
13.054
11.834
13.501
13.829
14.895
12.365
14.717
18.048
25
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- - 16 18
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
15.096
11.473
12.982
13.75
11.407
- - 15.190
13.072
- 0.051 12.797
13.577
27
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
T-S-S
ishing in progress.
- do -
mpleted & Handed Over.
- do -
mpleted & Handed Over.
- do -
mpleted & Handed Over.
- do -
mpleted & Handed Over.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
450.720 6.395
+ 2.183
- 7.586 263.997 65%
Compact 8.578
+ 3.017
11.595
+ 8.226
19.821
- 0.059 17.015
17.572
- 0.561 13.549
- 2.855 17.004
18.524
17.821
10.170
- 0.006 12.436
29
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- 1 10 16
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- 1.714 1.714
- 0.155 18.199
- 4.858 11.271
14.573
16.959
14.947
- - 15.766
- - 15.611
31
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
in Building = Completed.
Wall = Completed. PC-IV in progress.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
123.883 4.641 2.457 25.071 151.515 86%
+ 9.623
Compact 14.264
+ 8.350
22.614
+ 3.650
26.264
+ 9.238
35.502
- - 15.636
- - 17.169
- - 14.679
- -
- -
- 1.804 18.168
33
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- - 5 10
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- 3.034 3.034
15.703
- - 14.153
35
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
B/Wall DPC Level. 32/2-CHD dated 06-02-2020.
Tube well completed.
A.A awaited
- do -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
--
399.080
Compact
--
1.987 15.015
- 1.313 6.578
- 1.384 7.208
- -
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
2020-21
A.A Awaited
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- - - 9
mpleted.
Roofing in progress.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
1.112 2.295 16.677
- 4.327 17.912
- 0.224 18.020
39
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
MB = Finishing in progress.
B/Wall completed.
Sent to DEO (M) vide No. 326/2-
W dated 17-12-2020.
DCE sent T/O No. 541/2-W dated
03-04-18.
in Building. G/F = Finishing in progress.
= Plaster in progress. Sent to SE vide letter No. 04/3-
wall = 95% Completed. AB dated 02-12-2019.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
479.508 5.755 - - - 65%
+ 0.193
Compact 5.948
+ 6.395
12.343
+8.605
20.948
+ 23.302
44.250
- 8.447 14.682
- 9.119 9.119
41
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21 Sent to SE 151/3AB dated 20-11-
N/S Dispute Total
Com H/O 2020.
1 - - 1
in Building = Completed.
undary Wall = Completed.
DCE sent t/o No.3845/2-W dated 15-12-
17
Main Building G/F Marble work in progress. TS Sent to SE vide 350/3AB dt 21-12-
Boundary Plastering in progress. 2020.
2020-21
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
500.00 510.000 4.253 286.545 894.746 63%
44
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
age-I
of Level. Beyond Sent to SE vide letter No. 4728/3-
F Roof laid. F/F Roofing in progress.
stering in progress.
2020-21 AB dated 18-09-2019.
undation in Progress.
of Level.
age-II
Beded Hostels (5 Nos):
ostel No. 1 = G/F Roof laid.
Hostel No. 2 = DPC Level.
Hostel No. 3 = Roof Laid.
Hostel No. 4 = G/F Roof Laid. F/F in progress.
Hostel No. 5 = Flooring in progress.
C Level
C Level.
t yet started.
age-III
R:
Roof Laid. F/F Roof laid.
F & F/F = Roof laid.
of Laid.
F & F/F = Roofing in progress.
R
C Level.
C Level
F = Roofing in progress.
ucture completed.
C Level.
C Level.
t yet started.
C Level.
-
-
age-IV.
t, North and West side B.B completed.
of in progress.
rk not yet started.
-
progress.
Side + North Side = Finishing in Progress.
45
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
334.221 1.695
+ 2.508
3.288 5.789 163.122 36%
Compact 4.203
+ 2.692
6.895
+ 12.000
18.895
18.701
19.884
22.156
- 2.501 19.336
19.676
24.068
19.244
46
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- - 5 8
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
171.418 - - - 380.253 -
Compact
14.702
25.125
- - 50.541
- - 11.812
15.135
14.597
27.054
25.790
- - 20.883
19.818
48
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- 1 16 19
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- - 18.492
26.935
17.106
15.123
25.657
12.505
14.825
12.360
9.729
50
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted.
-- - 5.551 24.408
-- -
-- - 5.731 77.093
-- --
-- --
-- --
-- 8.692 --
52
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- - - 5
-- - - 16.330
-- - 4.784 11.731
-- - - 14.944
54
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- - 1 4
-- - - 21.930
-- 14.020
-- - 0.203 15.800
-- - 1.068 32.501
-- --
-- --
56
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
- 1 1 5
& F/F = C/R Finishing in progress. Sent to SE vide letter No. 411/3-
Wall Completed. Lab = 4 Floor Roof Laid. AB dated 20-01-2020.
mpleted PC-IV Submitted. TS
ishing in progress. TS
- 32.337 32.337
- 2.909 2.909
- 26.933 26.933
58
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
3 - - 3
250.00 7.348
Compact +
12.652
19.910
60
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
1 - - 2
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
250.00 1.119 5.586 14.232 22.999 100%
+ 3.530
Compact 4.649
+ 4.000
8.649
+ 0.456
+ 0.544
9.649
+ 6.000
15.649
528.892
Compact
591.600
Compact
62
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- - - 1
DCE sent T/o 2846/8-W dt 15/8/17
3090/2W dated 18/9/17
Main building = Finishing in progress. TS sent SE vide No. 352/3AB dated 21-
/Wall in Finishing. 12-2020.
Completed 2020-21
N/S Dispute Total
Com H/O
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
2 1 -- 8
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- 7.059 10.222
- 4.394 8.795
- 2.733 10.337
- 3.664 10.387
66
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- 27.086 38.965
- 12.087 15.921
- 20.361 28.406
150.00
Compact
0.000
Compact
68
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed
N/S Dispute Total
Com H/O
- - - 2
Main Building G/F Finishing in progress.
F/F Flooring in progress.
B/W in progress.
Plaster in progress.
Exam Hall Roof Level.
Beyond
2020-21
Sent to DEO M No. 1070/2-W dt. 22-03-2021
Beyond
2020-21
Sent to Project Director of School Construction &
Rehabilitation Program, PIU, KPK 411/2-W dated
28-12-2020
69
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
70
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
2020-21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
72
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
2020-21
2020-21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
74
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
2020-21
District: Mardan.
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
6.300 63.300 - - - - -
- - - - - - -
- - - - - - -
6.300 63.300 - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
30.000 6.875 - 6.300 63.300 97%
Compact + 2.500
9.375
77
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed and Handed Over. Beyond
Finishing in progress. 2020-21
78
S REPORT
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- 5.229 - - - - -
- - - - - - -
- - - - - - -
- 5.229 - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
51.000
Compact
15.000 - - - 5.229 -
Compact
80
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
2020-21
looring completed.
90 Completed.
-
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
9.689
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
- 61.350
85
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- - 4
all = completed
bldg: G/F flooring completed, FF flooring in progress
Sent to CE vide letter No. 377/2-
inishing in progress CHD dated 03-12-2018.
V 03 Nos qtr: finishing g in progress
III Residence = roof level
IV Roof laid
Head Tank 1000 gh = completed
= sub base in progress.
n = completed
uary =Roof laid, Romp = Roof laid
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Main Building Finishing in progress. Beyond
Mortuary = Not started (Site not cleared) 2020-21
Guard Room = ----do--
Public Lav. = ----do—
Garages = ----do—
Type III = ----do—
Type-IV = ----do—
Type V = ----do—
Boundary wall = work in progress.
OHT = Not started (Site not cleared)
Site preparation & Drain in progress.
88
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
50.000 270.000 5.377 193.341 897.040 80%
89
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Civil Works Beyond Diesel Generator:
oinery in progress/ Ceiling/ Painting in 2020-21 Work order issued to contractor
gress. vide No. 735/10-W dated 04-02-
Completed & Handed Over. 2021.
- do -
ublic health work in main building in
gress.
Electrification work in main building in
gress
o 8 piping work completed, balance work not
started.
Not yet started.
Bank guarantee submitted by contractor.
Ducting completed. Out/Indoor units
plied.
= Work in progress
= under ground over head water tank,
shing in progress, boundary wall & sewerage
in progress.
ad work in progress.
AC work strated.
90
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
100.000 187.220 2.477 127.408 1835.628 75%
91
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
ackage-I
. Finishing in progress.
Beyond 1. HVAC Work:
. Finishing in progress. 2020-21 Sent to Chief Engineer (North)
. 80% completed. for approval.
. Finishing in progress.
. Finishing in progress.
. Plastering/ Flooring in progress.
. Site not yet handed over.
2. Diesel Generator:
. Completed. Sent to SE vide letter No. 918/10-
. (i). Completed.
(ii). 60% Completed.
W dated 25-02-2021.
(iii) 80% completed.
0. Work stopped due to shifting of Electric Line.
ackage-II
. (i). Completed & PC-IV Submitted.
(ii). -do-
(iii). -do-
. PC-IV Submitted.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
73.161 3.885 - 1.266 27.120 32%
Compact + 1.118
2.767
0.738
0.929
0.962
0.665
0.874
0.769
0.897
3.370
- - 1.266 16.426
0.981
93
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed 2020-21
N/S Dispute Total
Com H/O
1 1 8 11
mpleted.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
195.000 48.000 41.128 149.482 1311.875 65%
+
30.000
78.000
300.00
378.00
0
+
21.581
399.58
1
229.47
1
-
95
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond 3rd Revised TS pending.
Finishing in progress.
Completed & Handed Over, except Air Conditioning. 2020-21
Finishing in progress. 1. Lift Work:
Completed & H/O. Sent to Chief Engineer (North)
Completed & H/O.
Completed & H/O. for approval.
Completed & H/O. 2. Allied Works:
Completed & H/O. Sent to Chief Engineer (North)
Deleted in Revised PC-I.
. Completed & H/O. for approval of Technical
elopmental Work. Evaluation.
Completed.
Completed.
Completed.
Completed.
Completed.
In progress.
Procurement under process.
Work on hanging ans support system for upper piping
drainage system in Auditorium and Academic Block
und Floor in progress.
2020-21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
0.000 9.689
1.580
1.100
0.992
0.976
1.020
1.218
2.026
97
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond III-deposit Allot; 10.450 (M).
N/S Dispute Total
Com H/O 2020-21
- 2 5 7
mpleted. "
mpleted. "
98
S REPORT
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - - - -
- - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
215.545 8.000 - 8.000 874.680 100%
Compact
- 8.000 181.662
221.684
208.000
263.340
100
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
Completed
N/S Dispute Total 2020-21
Com H/O
- 1 3 4
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
230.00 5.000 2.040 20.040 64.864 32%
Compact + 3.000
8.000
+ 10.000
18.000
+ 40.000
58.000
300.00 243.443
Compact
102
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond Pending to SPO
/F = Brick work in progress. 2020-21
oof in progress.
oof level.
ot yet started.
rick work in progress.
ot yet started.
ot yet started.
ot yet started.
do -
North side B/Wall = Finishing in progress.
outh side = DPC Level.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
290.00
Compact
400.210 20.000
+ 34.000
- 60.146 124.745 75%
Compact 54.000
+ 22.395
76.395
+ 2.925
79.320
- - - 9.370 -
- - 0.145 1.252 -
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
e not cleared. DCE for Rs. 220.152 M sent to Director
Higher Education Peshawar VTO No.
2968/2-W dated 03-8-2017.
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
1 - - 8
% Completed.
ishing in progress.
105
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
20.000 - 26.969 41.970 -
+
5.000
25.000
+
2.000
27.000- - 1.999 8.563 -
200.00 5.000
+ 25.000
- 38.566 41.976 90%
Compact 30.000
+ 15.000
45.00
+ 15.000
60.000
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
F = Flooring in progress. Sent to SE Mardan vide No.
= Flooring in progress. 1913/3-AB dated 07-10-2020.
= Group Laterine Column in progress.
F = Completed.
F & F/F = Floring in progress.
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
5.000
109
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond Tender in process.
2020-21
110
S REPORT
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
52.260 10.420
112
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - - -
- - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
22.000 24.699
Compact
50.000 12.500
+ 10.500
12.301 42.395 139.245 85%
23.000
+ 5.000
+ 12.000
40.000
+12.000
52.000
50.000 - - - 2.939 -
Compact
115
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted & Handed Over. Beyond
2020-21
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
65.000 11.000 - 83.492 137.164 97%
+
20.000
31.000
86.172
- 8.425 29.427
- 9.967 31.778
- 8.706 14.782
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- - - 3
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - -
- - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
20.000 5.000 - 13.095 138.142 75%
+
10.000
15.000
40.00 41.443
Compact
13.121
14.308
- 14.015
121
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
dary wall = 80% completed.
ball Pavilion = 70%
Beyond
t = Finishing in progress 2020-21
nd: Cut/Fill in progress
ket Pavilion in progress Plastering in Progress. Roof laid at 3
ons + Flooring in progress.
el/ Offices Roof Laid. Squash Court Flooring in progress.
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
- 2 3
mpleted & Handed Over
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
10.000 0.560 - 0.534 27.732 -
Compact + 5.000
5.560
1.295
3.300
5.202
4.230
123
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Completed Beyond
N/S Dispute Total
Com H/O 2020-21
2 2 1 9
mpleted & Handed Over.
mpleted & Handed Over.
ooring in progress.
ot yet started.
TS sent to SE Mardan vide No.
ot yet started. 493/3-AB dated 05-01-2021.
ot yet started.
mpleted.
mpleted.
oor laid.
rtially completed
ot started.
n Progress.
124
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- - 0.534 13.705 -
125
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Work order issued
AA Awaited
126
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
20.000 - -
Compact
127
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
65.824 15.278 0.083 17.293 17.210 61%
Compact 8
+ 8.983
24.261
8
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Beyond
2020-21
PC-I
% work completed.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
0.99 0.078 2.714 2.714 97%
0
+
1.72
1.254 - 3.588 3.588 92%
2.710
+4
2.33
88 2.336 - 2.336 2.336 100%
3.58
88 1.250 - 1.250 1.250
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted.
% Work Completed.
% Work Completed.
Pitches Completed.
Lavatory Block Completed.
Parking shed Completed.
DCE sent to Regional Sports Office Mardan
vide t/o No. 625/2-W dated 18-02-2020.
% Work Completed.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
75.000 15.000 - 19.000 64.123 100%
Compact +
4.000
19.000
0.000
Compact
0.000
Compact
133
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
lastering in progress. Beyond TS Sent to SE 802/3AB dated 17-
Plastering in progress. 2020-21 03-2020.
Boundary wall in progress.
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
- - - - -
- - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
50.000 12.500 - 47.000 197.911 100%
Compact +
12.000
24.500
+
7.500
32.000
+
15.000
120.00
Compact
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
F Finishing in progress.
inishing in progress.
Beyond TS sent to SE Mardan No.
mpleted. 2020-21 1682/3AB dated 10-09-2020.
progress.
HT = Work in progress.
yment made to WAPDA.
s Bay Roofing Completed.
Beyond
2020-21
PROVINCIAL PROGRAMME
(Rupees in million)
% age
Expenditure Financial Utilization Addl Demand (+) Surrender (-)
(CFY)
Addl:
Allocatio Surrender Net
CFY Progressive Releases Demand
n (-) (+) (-)
(+)
97.685 - - - - -
- - - - - -
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
13.571 93.831
0.740 3.070
1.272
- 0.730 -
139
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted
ishing in progress
mpleted.
140
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
8.040 - 1.540 1.540 19%
1.340
1.340
1.340
1.340
1.340
1.340
1.327 1.243
0.717
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted. Work order issued.
-do-
mpleted. -do-
rk in progress. -do-
mpleted. -do-
mpleted.
mpleted. Beyond
2020-21
mpleted & Handed Over.
142
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Work order issued to contractors
mpleted.
- do -
ishing in progress.
- do -
ishing in progress.
- do -
mpleted and Handed Over
- do -
mpleted and Handed Over
- do -
mpleted and Handed Over
- do -
mpleted.
- do -
% Work Completed.
- do -
mpleted.
- do -
ad Protection wall completed.
- do -
144
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
0.749 - 0.641 0.641 86%
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
ad protection in X-Ray Room Completed.
mpleted.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
1.560 - 1.554 1.554 100%
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted & Handed Over.
ishing in progress.
ishing in progress.
148
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
2.360 - 0.814 2.360 100%
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
% work completed.
mpleted.
mpleted.
progress.
% Completed.
150
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
-- 5.033
-- 0.084
0.125
0.320
0.791
0.200
0.403
0.195
0.528
151
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted.
mpleted.
mpleted.
rk Completed.
% Work Completed.
progress.
mpleted.
mpleted.
mpleted.
152
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- - - 0.450 -
- - - 0.450 -
- - - 0.600 -
153
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
mpleted.
% Work Completed.
mpleted.
mpleted.
154
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
0.522 1.317
0.150
0.400
0.150
--
0.100
0.300
0.300
0.17
2.622 - - 1.657
2.745 - - 2.536
155
(Rupees in Million)
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
rk in progress.
mpleted.
mpleted.
mpleted.
mpleted.
mpleted.
mpleted.
mpleted.
156
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- - - 4.555 -
0.100
0.500
157
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
- do -
- do -
158
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
- - - 2.158 -
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
progress.
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
4.500
1.690 0.618
161
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
Tender in process.
Tender in process.
162
District Mardan
Expenditure during Financial
Allocation Dg. CFY
the Progressiv Utilization
e Expdr: During
Original Releases Month Year CFY
8 9 10 11 12 13
163
Scheduled
date of
Physical Progress Remarks
Completio
n
19 20 21
10
11
12
13
14
15
16
17
SECTORS
AGRICULTURE
BOARD OF REVENUE
PRIMARY EDUCATION
SECONDARY EDUCATION
FOOD
HEALTH
HIGHER EDUCATION
HOME
INFORMATION
URBAN DEVELOPMENT
1 ----------- 3
4 ----------- 14
15 ----------- 17
18 ----------- 20
21 ----------- 41
42 ----------- 74
75 ----------- 77
78 ----------- 80
81 ----------- 97
98 ----------- 106