Application Information: Reference Only
Application Information: Reference Only
Application Information: Reference Only
285
Installation of a Barber-Colman 2500 electric linear actuator on a John Deere 6081 engine. The
DYNC-10502 linear actuator controls the engine through the stop lever to give isochronous speed
control. The stop solenoid needs to be removed and discarded. It is also necessary to set the
mechanical governor 10 to 12% above the rated run speed. This kit will work for engines having
either the Bosch in-line fuel pump or the Nippondenso in-line fuel pump.
This bulletin contains the following:
I. Installation Instructions
II. Parts List
III. Layout Drawing
Read all instructions and review the layout drawing before attempting this installation.
I. Installation Instructions 3. t y
Install the clevis (Item 4) on the actuator shaft
n
e l
and tighten the M6 nut against the back side of the
n
A. Engine Preparation clevis.
u m O
4. c Assemble the linkage rod by placing one hex
onut (Item 9) andconee rod end bearing (Item 6) to each
1. Disconnect the battery
nc r
B. Actuator Installation and the opposite end of the rod lines up with the hole
Refer to theU
o
t and mount the
in the clevis (Item 4) on the actuator shaft.
1.
i s
layout drawing
actuator bracket (Item 3) to the engine using two 7. When the length of the rod is correct, turn the
screws and two washers H (Items 13 and 14). The rod end bearing on the rod CW one full turn. Install
2. Mount the actuator (Item 1) on to the bracket 8. Tighten both rod jam nuts against the rod end
(Item 3) with the four lock washers, hex nuts, and bearings while holding the clevis in the correct posi-
socket head cap screws (Items 7, 8 and 9). tion as shown in the layout drawing.
NOTE
C. Linkage Installation
Make sure that full fuel position can be achieved.
1. Install the shut off lever (Item 11) using the
existing screw.
DYNA 198-1
D. Magnetic Pickup Installation
NOTE
1. Remove the inspection plate from the bottom Wire the controller according to Barber-Colman wir-
of the flywheel housing. ing diagrams.
nt
Barber-Colman
2 turn. This will be approximately .02 clearance.
y
Item Description Qty.
Part Number
l
me
1 Governor actuator DYNC-10502 1
E. Throttle Lever Tie Down Installation 2 Controller n
DYN1-10704 1
c u O
1. Mount the tie down bracket under the top fuel
pump mounting screw. Refer to the layout drawing. o c e
D e n
ed r
2. Install one jam nut and one rod end bearing on
e
to one end of the threaded rod. Tighten the jam nut B. Table 2. Installation Kit
l
l ef
against the rod end bearing. B-C Part Number DYNK-10399
o R
tr
Barber-Colman
Item Description Qty.
3. Remove the throttle lever and connect the rod
l Part Number
on a
end bearing to the throttle lever using one M6 x 16 3 Bracket - mounts on engine DYNK-304-3 1
U t o 6
7
Rod end bearing (1/4)
Lock washer (1/4)
DYNZ-47-1
CYRD-558
2
6
o r
stalled so they are between the throttle lever and the
fuel pump housing. Refer to layout drawing.
11
12
Fuel shut off lever
Magnetic pickup
DYNK-304-1
DYNT-17200
1
1
F 13
14
Hex head screw (5/16 - 18 x 3/4)
Lock washer (5/16)
BYRF-1350
CYRD-559
2
2
15 Tie down kit DYNK-10398 1
4. Reinstall the throttle lever on the fuel pump.
4 9
10
AAA
AA
6
1 Linkage
AA
9 Side
AA
View
3 8 5
9
AA 11
AA AA AAA
6
7 9
10
AA
9
7
AA
1313 14
n t y
l
Tie Down Kit
AA m e n
DYNK-10398
15 Tie Down
AA AA AAAAAAAAAAAAA u O Bracket
oc
AAAAAAAAAAAAA c e
AA AA D e n
e d r
l f e
o l e
r R
n t a l
c o i c Top View
r
11
n o
Fuel Pump
U t AA
is AA AAAAAA
H AA AAAAAA
r AA Throttle
Lever
F o