Daily Dredging Report

The daily dredger report summarizes activities from a dredging project on a given date. It includes information on crew, visitors, production quantities, a daily log of dredging activities coded by time and location, and notes. Fuel, oil, and water consumption levels are also reported. The document is signed by representatives from the subcontractor, contractor, engineer, and client.

Uploaded by

uygarkoprucu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views1 page

Daily Dredging Report

The daily dredger report summarizes activities from a dredging project on a given date. It includes information on crew, visitors, production quantities, a daily log of dredging activities coded by time and location, and notes. Fuel, oil, and water consumption levels are also reported. The document is signed by representatives from the subcontractor, contractor, engineer, and client.

Uploaded by

uygarkoprucu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Date:

 DREDGER DAILY REPORT

Location: Designation #
Project: Master
INTRO.

Client: Chief Mate
Proj. Start Date: Project Calendar Day: 2nd Officer
Weather: Chief Engineer
2nd Engineer
Shift Shift dur. 3rd Engineer

CREW
DAILY ACTIVITY DESC.

Trip target Active hr Electrician


Actual trip/day Idle hr Fitter
Oiler
Able Seaman
Bosun
Ordinary Seaman

TOTAL: 0

Visitor 1, Eng Rep.
Grand 
Σ  PRODUCTION

Activity Prev. Prod. Daily Prod. Σ Prod. % Visitor 2, Client Rep.


Total

VISITORS
Visitor 3, Owner Rep.
Est. Volume Dredged Visitor 4, Ship Mng.
Est. TDS Visitor 5, Other
Linear Meters TOTAL: 0
Reclamation GRAND TOTAL: 0

CODES
Time
Chainage / Location 1 DREDGING
Start Finish Code Oper. Idle 2 PIPELINE HANDLING
3 PIPELINE FLUSHING/CLEARANCE
4 CUTTER / SUCTION HEAD CLEANING
5 WAITING FOR ATTENDANT PLANT
6 TO/FROM ANCHORAGE
7 WORK LOCATION CHANGE
DAILY LOG

8 LOSS DUE TO NATURAL MATERIAL
9 LOSS DUE TO UNNATURAL MATERIAL
10 THIRD PARTY WORKS
11 MINOR OPERATING REPAIRS
12 TOW PREPARATION
13 MARINE TRAFFIC STOPPAGES
14 BREAKDOWN
15 SUNDAY/HOLIDAY
16 END OF SHIFT
0 0 17 MISCELLANEOUS
CONSUMPTION & L

Prev.  Daily  Curr. 


Cpct
Type Level Cons. Level %
REQUESTS

NOTES

m3 m3 m3 m3
MGO
OIL
FW

SUBCONTRACTOR CONTRACTOR ENGINEER CLIENT