Business Continuity, BIA DRP

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 39

A Professional’s Guide

to the Contents of a
Business Continuity Plan

by William M. Adney
InfoSolutions, Inc.
3642 Racquet Club Drive
Grand Prairie, TX 75052-6107
Phone: 972-642-4549
Email: [email protected]

Reviewed by:
Kelley Goggins, MBCP
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________

TABLE OF CONTENTS

EXECUTIVE SUMMARY...........................................................................................................1
Objectives............................................................................................................................1
Business Continuity Plan (BCP) Overview......................................................................1
Chapter 1 – Overview and General Information................................................2
Chapter 2 – Critical Business Continuity Plan Information.............................2
Chapter 3 – Plan Administration and Maintenance...........................................2
Chapter 4 – Plan Testing and Test Reports.........................................................2
Chapter 5 – Appendices.........................................................................................3
The Crisis Management Plan (CMP) and the BCP........................................................3
About the Author...............................................................................................................3

Contents of a Business Continuity Plan.......................................................................................5


Chapter 1 – Overview and General Information............................................................5
1.0 Before You Begin.......................................................................................5
1.0.1 Cover page...........................................................................6
1.0.2 Confidentiality Statement...................................................6
1.0.3 Distribution/Update List.....................................................6
1.0.4 Table of Contents................................................................6
1.1 Business Continuity Plan Overview.........................................................7
1.1.1 Objectives............................................................................7
1.1.2 Scope...................................................................................7
1.2 Business Continuity Plan Policy...............................................................8
1.3 Business Continuity Plan Assumptions....................................................8
1.4 Business Impact Analysis (BIA) Summary.............................................9
1.5 Business Continuity Strategy....................................................................9
1.5.1 Emergency Operations Center (EOC) Locations/Contacts
9
1.5.2 Alternate Site Locations and Contacts.............................10
1.6 BCP Team Description and Organization Chart..................................10
1.6.1 BCP Team Responsibilities..............................................10
1.6.2 BCP Team Organization Chart........................................12
Chapter 2 – Critical Business Continuity Plan Information.......................................13
2.1 Executive Management Team.................................................................13
2.1.1 Executive Management Team Call List...........................13
2.1.2 Executive Management Team Task List..........................13
2.1.3 Executive Management Team Customer List..................13
2.1.4 Executive Management Team Equipment List...............13
2.1.5 Executive Management Team Software List...................13
2.1.6 Executive Management Team Supplies List....................14
_______________________________________________________________________________________
___
54312050.docx Page ii
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
2.1.7 Executive Management Team Telecommunications List
14
2.1.8 Executive Management Team Vendor List.....................14
2.1.9 Executive Management Team Vital Records List...........14
2.2 Business Continuity Coordinator (BCC)...............................................14
2.3 Damage Assessment/Salvage Team........................................................14
2.4 Logistics/Transportation Team..............................................................14
2.5 PR/Communications Team.....................................................................14
2.6 Facilities/Security Team..........................................................................14
2.7 Accounting Team.....................................................................................14
2.8 Telecommunications Team.....................................................................14
2.9 Information Technology Team...............................................................14
2.10 Marketing Team.......................................................................................14
Chapter 3 – Plan Administration and Maintenance.....................................................15
3.1 Business Continuity Coordinator (BCC)...............................................15
3.1.1 Responsibilities.................................................................15
3.2 Business Continuity Plan Administrators (BCA).................................16
3.2.1 Responsibilities.................................................................17
3.3 Business Continuity Plan Administration.............................................17
3.3.1 BCP Awareness and Training..........................................17
3.3.2 Exercising (Testing) the BCP...........................................17
3.4 Business Continuity Plan Maintenance.................................................18
3.4.1 When and How to Update the BCP..................................18
3.4.2 Business Impact Analysis (BIA) Maintenance................18
3.5 BCP Approvals.........................................................................................19
3.5.1 Senior Management Approval.........................................19
3.5.2 Board of Directors Approval (if applicable)....................20
Chapter 4 – Plan Exercises and Exercise Reports........................................................21
4.1 BCP Exercise (Testing) Methodology....................................................21
4.2 When to Exercise (Test) the BCP...........................................................21
4.3 Developing the Exercise (Test) Scenario or Plan..................................22
4.4 Exercise (Test) Evaluation......................................................................23
4.5 Exercise (Test) Reports............................................................................23
Chapter 5 – Appendixes..................................................................................................24
APPENDIX A – GLOSSARY.............................................................................25
APPENDIX B – HOT SITE INFORMATION (Sample).................................34
APPENDIX C – JCN Model 00 Server Recovery Procedure (Sample)..........35

List of Tables
Table 1 – BCP Distribution/Update List.....................................................................................6
Table 2 – BIA Summary Example...............................................................................................9

List of Figures
Figure 1 – BCP Team Organization Chart...............................................................................12
_______________________________________________________________________________________
___
54312050.docx Page iii
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________

_______________________________________________________________________________________
___
54312050.docx Page iv
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

EXECUTIVE SUMMARY

Objectives

If you have never created a Business Continuity Plan (BCP), it seems to be one of the most difficult
tasks based on my observations and experience, and there always seems to be a lot of questions
about what should and should not be included in the BCP.

This document will help you determine and structure the basic information that should be in an
effective and viable BCP. Information in this document is based on DRI International’s
Professional Practices for Business Continuity Planners (see www.drii.org for the latest version)
and other references as documented in the footnotes.

The objectives of A Professional’s Guide to the Contents of a Business Continuity Plan are to:

 Document a structure for your Business Continuity Plan.

 Describe the general contents of each section and subsection.

 Provide guidelines, recommendations, and some examples of items that you may need in
your Business Continuity Plan.

 Suggest a structure to integrate a Crisis Management Plan (CMP) with your Business
Continuity Plan.

Business Continuity Plan (BCP) Overview

The Business Continuity Plan (BCP) is generally organized so that information required during a
recovery operation is closer to the beginning of the document, except for detailed recovery
procedures (e.g., Recovery Procedures for the Windows 2000 Server). The Table of Contents
contains five chapters as shown in the following sections.

One other important point: this document is intended as a guide, not an absolute requirement, to
help you determine the contents of a BCP that is most appropriate for your organization. For
example, I have shown five (5) chapters because it is easy to obtain 5-tab indexes, but I have
written BCPs that contain twenty (20) or more chapters. In general, how you organize your BCP
is not as important as being certain that you have all of the information required to effectively
implement your plan.

_______________________________________________________________________________________
___
54312050.docx Page 1
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 1 – Overview and General Information

Chapter 1 contains an overview of the BCP including the purpose, scope, objectives, and
assumptions made for the plan. Additional sections and subsections include, but are not limited
to, a company’s BCP Policy, BIA1 Summary, recovery strategy, EOC location(s), damage
assessment, escalation plans/procedures, and general information about the Crisis Management
Team in this chapter. The BCP team organization chart are also included in this chapter.

Chapter 2 – Critical Business Continuity Plan Information

Chapter 2 contains the call lists, task lists, and various resource inventories by team to make it
easier to execute the BCP, as well as improving the ease of distribution and updating.
Inventories include lists of Customers, Equipment, Software, Supplies, Telecommunications,
Vendors, and Vital Records that are required to support the BCP.

Chapter 3 – Plan Administration and Maintenance

Chapter 3 contains a variety of information related to administering and maintaining the BCP. It
includes sections and subsections on administration, training, maintenance, awareness programs,
education, and auditing the BCP. While most of this information is the responsibility of the
Business Continuity Coordinator, it also documents important procedures such as the Board of
Directors’ annual approval of the BCP for bank and other financial institution operations as
required by the Federal Financial Institutions Examination Council (FFIEC).2 This policy
applies to all FFIEC agencies including the Federal Deposit Insurance Corporation (FDIC), the
National Credit Union Administration (NCUA), Office of the Comptroller of the Currency
(OCC), and the Office of Thrift Supervision (OTS).

Chapter 4 – Plan Testing and Test Reports

Chapter 4 contains information on the various types and frequency of plan testing. New terms
will be added to the Glossary as required, such as tactical exercise (“war game”), etc. This
chapter also provides a repository for test reports, although some Business Continuity
Coordinators prefer to place test reports in an appendix.

1
DRII Professional Practices – Subject Area 3: Business Impact Analysis
2
FFIEC Corporate Business Resumption and Contingency Planning Policy Revised March 1997
_______________________________________________________________________________________
___
54312050.docx Page 2
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 5 – Appendices

Chapter 5 contains various appendixes, including detailed procedures, that support the BCP. For
example:
A Glossary
B Recovery Site Information (e.g., directions, maps, contract copies, etc.)
Other appendixes (for detailed procedures, etc.) as required.

Appendix A includes a glossary which is a substantial revision of the current DRII terminology
plus some new terminology, such as Business Continuity Coordinator, Business Continuity Plan,
and Business Continuity Planner. Some of the current terms are not consistent with DRII
Professional Practices and will be replaced in the glossary.

The Crisis Management Plan (CMP) and the BCP

Every organization has a variety of crises which may range from a simple building evacuation
for some reason (e.g., a bomb threat) to full-scale, easily recognized disaster. The objective of
the Crisis Management Plan (CMP) is to manage these crises, and provide a framework and
structure for activating the Business Continuity Plan (BCP).

For example, I normally include three essential teams in the CMP:

 Damage Assessment/Salvage Team


 Logistics/Transportation Team
 Public Relations/Communications Team

Also, I include an Escalation Plan in the CMP to provide the Crisis Management Team (CMT)
with a guideline on when a disaster declaration may be appropriate. A guideline is just that – a
guideline, and it is up to an organization’s most senior management (i.e., the CMT) to determine
what is appropriate based on the circumstances at the time of the specific event.

For purposes of this paper, all teams shown above and the Escalation Plan will be shown as part
of the BCP; however, you may need to adjust these teams and names for consistency in your own
BCP and/or CMP.

About the Author

Bill Adney has over 35 years’ experience in data processing and over 25 years’ experience in
Business Continuity Planning.

_______________________________________________________________________________________
___
54312050.docx Page 3
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

1Mr. Adney is currently president and owner of InfoSolutions, Inc. He has performed a wide
variety of disaster recovery, information/physical security, and programming consulting
assignments for major firms in the retail, insurance, financial, manufacturing, and aerospace
industries, involving work with a wide variety of system configurations, including IBM
mainframes, minicomputers, LAN/WAN networks, and personal computers. These assignments
have included responsibility for large project management, business continuity/disaster recovery
project planning and implementation/testing, and information security project planning and
implementation, and have required knowledge of data center security and operations,
applications development and implementation, and programming.

As Manager of Security and Contingency Programs for a large West Coast oil company, he was
directly responsible for the planning and implementation of the corporate disaster recovery plan
and user recovery procedures for the critical financial systems. His overall data processing dates
experience dates back to 1967, and he has actively developed a wide variety of disaster recovery
and business continuity plans since 1977. Mr. Adney has successfully developed DRPs and
BCPs for companies such as Texas Instruments, McDonnell Douglas, Household International,
E-Systems, Chief Auto Parts, FootActionUSA, Metropolitan Life, Texas Department of Criminal
Justice, Sunbeam Corporation, The Associates, PEMCO Financial Services, The South Financial
Group, Washington Mutual, and the Veterans Administration – Financial Services Center.

_______________________________________________________________________________________
___
54312050.docx Page 4
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Contents of a Business Continuity Plan

Chapter 1 – Overview and General Information

Chapter 1 contains an overview of the BCP including the purpose, scope, objectives, and
assumptions made for the plan. Additional sections and subsections include, but are not limited
to, a company’s BCP Policy, BIA Summary, recovery strategy, EOC location(s), damage
assessment, escalation plans/procedures, and general information about the Crisis Management
Team in this chapter. The team organization and an organization chart are also included in this
chapter.

1.0 Before You Begin

In accordance with the DRII Professional Practices, there are several steps you should have
completed before you begin the preparation of your Business Continuity Plan:

1. Project Initiation and Control


2. Risk Evaluation and Control
3. Business Impact Analysis
4. Developing Recovery Strategies
5. Emergency Response and Operations
10. Coordination with Public Authorities

I have found that item 5. Emergency Response and Operations and item 10. Coordination with
Public Authorities seem to be most appropriate in the Crisis Management Plan.

The following DRII Professional Practices areas will be specifically addressed in this Business
Continuity Plan:

6. Developing and Implementing Business Continuity Plans


7. Awareness and Training Programs
8. Maintaining and Exercising Business Continuity Plans
9. Public Relations and Crisis Coordination

There are at least two documents you should prepare before you get too far along in your BCP: a
cover page and a table of contents. Other documents you should also have are described in the
following sections.

_______________________________________________________________________________________
___
54312050.docx Page 5
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
1.0.1 Cover page

The cover page may be the most important part of your BCP, at least in the beginning. When
someone asks to see your plan, even if you don’t have a professional binding, a nice cover page
will make a good impression. Your company logo on the cover page helps convey a professional
image. Keep the cover page simple and professional.

1.0.2 Confidentiality Statement

The information in your BCP is quite sensitive and usually confidential within your organization
or company, so you should at least have a Confidentiality Statement immediately after the cover
page. Some organizations have security requirements that dictate a statement of confidentiality
appear on every page, usually in a footer. Be sure to find out any special requirements for your
organization or company.

1.0.3 Distribution/Update List

Your BCP will need updating, especially the call lists when people change positions or leave the
organization, and you will need some way of tracking who has the BCP and when the last update
was made to that particular copy. A distribution/update list helps with this task, especially if you
are the Business Continuity Coordinator and need to be able to look at a particular BCP to
determine its latest update.

The distribution/update list only needs to have the following information:

Nam Phone Mail Date Issued BCP Updated BCP Updated by


e Location on

Table 1 – BCP Distribution/Update List

If you have the mail location on your list as shown above, you can simply attach the page to the
updates you send out and highlight the name and mail location.

1.0.4 Table of Contents

I have found it’s always helpful to prepare a draft table of contents, or at least an outline, of what
I expect to have in a BCP before I actually begin writing. A few minutes’ thought and planning
can save you a lot of time later on. Of course, you will want to use the automated feature of
most word processors to generate your table of contents as a final document.

_______________________________________________________________________________________
___
54312050.docx Page 6
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

1.1 Business Continuity Plan Overview

An overview and description of the organization of the Business Continuity Plan.

For example…

Chapter 1 contains an overview of the BCP including the purpose, scope, objectives, and
assumptions made for the plan. Additional sections and subsections include, but are not limited
to, ABC company’s BCP Policy, BIA Summary, recovery strategy, EOC location(s), damage
assessment, escalation plans/procedures, and general information about the Crisis Management
Team in this chapter. The team organization and an organization chart are also included in this
chapter.

Chapter 2…etc.

1.1.1 Objectives

A list of objectives for the Business Continuity Plan, such as:

 Develop a Business Continuity Plan structure for managing a disaster that affects the
ABC Company.
 Document critical information as required for the implementation of the Business
Continuity Plan.
 Provide guidelines with an escalation plan for the ABC Company for a disaster
declaration that will result in the execution of this Business Continuity Plan.

1.1.2 Scope

A definition of the scope of this Business Continuity Plan, such as:

The scope of this Business Continuity Plan is limited to the business offices of ABC Company,
123 Main Street, Anytown, XX 99999.

In general, it is best to limit the scope to a specific location because a disaster is generally
location-specific. Don’t try to write a BCP that covers all of your company locations or you will
not be able to manage the project, let alone write the plans. Remember that you will probably
have to provide status reports on your progress, and it’s easier to see progress on location-
specific plans.

_______________________________________________________________________________________
___
54312050.docx Page 7
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

1.2 Business Continuity Plan Policy

For documentation purposes, I recommend that you include your Business Continuity Plan
Policy as part of your BCP. If your organization does not have an officially approved policy, I
recommend that you create one before you begin the BCP; otherwise, you will almost certainly
have major issues attempting to get information and cooperation in the development of your
BCP.

If your organization is subject to any regulatory agency, you may find there is a requirement for
you to have a BCP policy. And even if you do not have any regulatory concerns, it is still a best
practice to include a copy in your plan.

1.3 Business Continuity Plan Assumptions

All BCPs should contain a list of assumptions upon which the plan has been developed.

For example…

The Business Continuity Plan has been developed and maintained based on the following
assumptions:
 That the Plan is designed to address a worst-case scenario – the ABC Company’s
business offices are unavailable for an extended time on the order of four to six weeks.
 That a backup of critical computer systems occurs daily (usually around midnight) and
these backups (usually tape) are sent to offsite storage early the next morning.
 That, if the interruption occurs during the end of a normal business day, ALL transactions
generated during that day will be lost (daily backup tapes have not been created and sent
to offsite storage).
 That the level of Plan detail is based on the premise that sufficient and knowledgeable
ABC Company personnel will not be incapacitated by the interrupting event, and can
execute the Business Continuity Plan. This may not be a valid assumption if your plan
must include the capability to handle a 9/11 scenario; be sure to check with your senior
management on this.
 That items in offsite storage are in a secure, environmentally protected facility
sufficiently remote from the ABC Company to not be affected by the same interrupting
event.
Keep in mind that the above are samples only, and you will have to develop your own
assumptions based on the planning directives of your senior management. Also, I recommend

_______________________________________________________________________________________
___
54312050.docx Page 8
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
that you get senior management approval on your BCP assumptions before you develop any
additional BCP details.

1.4 Business Impact Analysis (BIA) Summary

It is a best practice to conduct a Business Impact Analysis before you begin your Business
Continuity Plan. This section includes a short summary of the most important data obtained
from the BIA such as the business unit, responsible manager, process/business function, recovery
time objective (RTO), estimated daily financial losses.

For example…

Business Unit Manager Process RTO Daily Comment


Loss
Accounting J. Doe A/P 2 days $1,000 Loss of discount

Table 2 – BIA Summary Example

I suggest using a spreadsheet for this summary because it makes it much easier to sort
information to answer questions such as: “What is the shortest (longest) RTO?” or “What is the
maximum (minimum) daily loss”. And of course you will want to know what the total estimated
daily loss is for your organization to help justify the cost of the Business Continuity Strategy.

1.5 Business Continuity Strategy

After you have completed the BIA, it is a best practice to document a formal Business Continuity
Strategy and have it approved by senior management. Why? Because it will almost certainly
require funding, and your senior management needs to know at least the estimated cost before
they can approve it.

For BCP documentation purposes, I suggest including two simple statements in your BCP that
reflects your Business Continuity Strategy such as:

In the event of a declared disaster affecting the ABC Company’s business offices, business
operations will utilize the Wazoo Business Recovery Center located at 1234 Center Street,
Yourtown, XX 99999.

Contact information for the Wazoo BRC is located in Section 1.5.2 of this Business Continuity
Plan. Additional information, including the contract and a map, can be found in Appendix B.

1.5.1 Emergency Operations Center (EOC) Locations/Contacts

_______________________________________________________________________________________
___
54312050.docx Page 9
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Many organizations have three designated EOC locations: (1) a large conference room in the
business office facility, (2) a hotel that is relatively convenient for all team members, and (3) the
Alternate Site facility.

You will need to make sure that you have an address and contact phone listed in this section if
you designate a hotel or other similar meeting place.

1.5.2 Alternate Site Locations and Contacts

There are at least two locations with contact information you should have in this section:

Alternate Site: Wazoo Business Recovery Center

Offsite Storage: Wazoo Offsite Storage

If you have a declared disaster, you will need to notify your Alternate Site and Offsite Storage
locations. Remember that some commercial vendors charge a declaration fee upon notification,
even if you do not completely implement your Business Continuity Plan.

1.6 BCP Team Description and Organization Chart

Before you get into the details of your plan, you need to generally know how your teams will be
organized. Each team should have a Team Leader and an Alternate Team Leader. This section
provides a brief summary of each team’s responsibilities and an organization chart showing their
relationship.

1.6.1 BCP Team Responsibilities

Executive Management Team

Consists of the most senior manager (at that location) and an alternate. Responsible for the
overall direction, decision-making, and approvals required to implement the Business Continuity
Plan. The BCP can generally be activated only by the Executive Management Team, especially
if a commercial vendor charges a declaration fee upon disaster notification.

Business Continuity Coordinator

Responsible for assisting in the activation of the Business Continuity Plan. The BCC should be
the most knowledgeable person on the details of the BCP. The BCC is frequently designated to
provide emergency notification to the Alternate Site and Offsite Storage facility.

_______________________________________________________________________________________
___
54312050.docx Page 10
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Logistics/Transportation Team

Responsible for making emergency arrangements for personnel transportation, lodging, and
dining at the Alternate Site. Also is responsible for ordering and ensuring the delivery of offsite
storage items and Supplies (from the Supplies List).

Damage Assessment/Salvage Team

Responsible for the damage assessment of the company’s location and advising the Executive
Management Team of the results. Works with the Facilities/Security Team to verify the building
can be occupied after a disaster. After damage assessment is completed, this team will also be
responsible for coordinating salvage operations as required.

PR/Communications Team

Responsible for all Public Relations (Public Relations and Crisis Communications3) and other
communications (e.g., Coordination with Public Authorities4)

Facilities/Security Team

Responsible for the facility and its security. In a disaster, this team is also responsible for
providing security to the Alternate Site if required.

Accounting Team

A Sample Team – Responsible for ensuring that critical accounting business functions are
operational and accurate.

Telecommunications Team

Responsible for the restoration and maintenance of all Voice Communications and Data
Communications. Also responsible for ensuring telephones are operational at the Alternate Site.

IT Team

Responsible for restoring all critical computer systems and workstations (except telephones).

Marketing Team

A Sample Team – Responsible for ensuring that critical marketing business functions are
operational and providing customer support.

3
DRII Professional Practices – Subject Area 9: Public Relations and Crisis Communication
4
DRII Professional Practices – Subject Area 10: Coordination with Public Authorities
_______________________________________________________________________________________
___
54312050.docx Page 11
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
1.6.2 BCP Team Organization Chart

B u s in e s s C o n t in u it y T e a m O r g a n iz a t io n C h a r t

E x e c u t iv e M a n a g e m e n t T e a m
G e n e R o d d e n b e rry

B u s . C o n t. C o o rd . D a m a g e A s s e s s m e n t / S a lv a g e
D o c S m it h I s s a c A s im o v

L o g is t ic s / T r a n s p o r t a t io n P R / C o m m u n ic a t io n s T e a m
A n d re N o rto n L a r r y N iv e n

F a c ilit ie s / S e c u r it y A c c o u n t in g T e le c o m m u n ic a t io n s I n fo r m a t io n T e c h n o lo g y M a r k e t in g
Joh n W ayn e B ill S h a t n e r B r e n t S p in e r L e o n a rd N e m o y P a t r ic k S t e w a r t

Figure 1 – BCP Team Organization Chart

_______________________________________________________________________________________
___
54312050.docx Page 12
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 2 – Critical Business Continuity Plan Information

Chapter 2 contains the call lists, task lists, and various inventories by team to make it easier to
execute the BCP, as well as improving the ease of distribution and updating. Inventories, shown
in alphabetical order, include lists of Customers, Equipment, Software, Supplies,
Telecommunications (voice and data), Vendors, and Vital Records that are required to support
the BCP. The Glossary contains a definition of each of the following lists.

The Call List for each team is shown first because that makes it easy to find for emergency
notifications. The Task List is shown next so that it is easy for the Team Leader to find it after
the emergency notification.

Not all teams will have all inventory lists. For example, the Executive Management Team may
not have any customers (Customer List) or vendors (Vendor List) because customers and
vendors will usually be notified by other teams. If a team does not have one or more inventory
lists, I recommend that a statement be placed in that section as a “place holder” such as: The
Executive Management Team does not have a Customer List”. This will remind each team
leader that a Customer List does exist and should be updated if there has been a new inventory
item which is a result of changing business operations.

As a final note, I have not shown the Call List, Task List, and all inventory lists for each team
because they will be identical to the example shown for the Executive Management Team. Each
team name is listed as shown in Section 1.6.2, Figure 1 – BCP Team Organization Chart.

2.1 Executive Management Team

2.1.1 Executive Management Team Call List

2.1.2 Executive Management Team Task List

2.1.3 Executive Management Team Customer List

2.1.4 Executive Management Team Equipment List

2.1.5 Executive Management Team Software List

_______________________________________________________________________________________
___
54312050.docx Page 13
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
2.1.6 Executive Management Team Supplies List

2.1.7 Executive Management Team Telecommunications List

2.1.8 Executive Management Team Vendor List

2.1.9 Executive Management Team Vital Records List

2.2 Business Continuity Coordinator (BCC)

2.3 Damage Assessment/Salvage Team

2.4 Logistics/Transportation Team

2.5 PR/Communications Team

2.6 Facilities/Security Team

2.7 Accounting Team

2.8 Telecommunications Team

2.9 Information Technology Team

2.10 Marketing Team

_______________________________________________________________________________________
___
54312050.docx Page 14
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 3 – Plan Administration and Maintenance

Chapter 3 contains a variety of information related to the administration and maintenance of the
BCP. It includes sections and subsections on administration, training, maintenance, awareness
programs, education, and auditing the BCP. While most of this information is the responsibility
of the Business Continuity Coordinator, it also documents important procedures such as the
Board of Directors’ annual approval of the BCP for bank operations (required by the FDIC).

3.1 Business Continuity Coordinator (BCC)

The Business Continuity Coordinator has overall responsibility for the design, development,
coordination, implementation, administration, training, awareness programs, and maintenance of
the Business Continuity Plan. Accordingly, the BCC should have experience and training in
most, if not all, of the DRI International Professional Practices for Business Continuity
Planners (see www.drii.org for the latest version).

I believe it is critical that the BCC be a senior, experienced, and dynamic individual who has
worked in project management for medium-to-large projects to assure successful implementation
of a business continuity program. And the BCC must have access to senior management for
approval of various items within the business continuity program, such as the Business
Continuity Strategy, Business Continuity Plan Assumptions, and the Business Continuity Plan
itself.

3.1.1 Responsibilities

In accordance with the DRII Professional Practices, the Business Continuity Coordinator has the
following responsibilities:

 Provide BCP project coordination and management5.


 Perform risk evaluation and mitigation as required6.
 Conduct a Business Impact Analysis7.
 Develop and obtain approval for the Business Continuity Strategy (ies)8.
 Develop, implement, and maintain procedures for emergency response9. You may find it
more appropriate to document Emergency Response procedures in your Crisis
Management Plan.

5
DRII Professional Practices – Subject Area 1: Project Initiation and Management
6
DRII Professional Practices – Subject Area 2: Risk Evaluation and Control
7
DRII Professional Practices – Subject Area 3: Business Impact and Analysis
8
DRII Professional Practices – Subject Area 4: Developing Business Continuity Strategies
9
DRII Professional Practices – Subject Area 5: Emergency Response and Operations
_______________________________________________________________________________________
___
54312050.docx Page 15
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
 Develop and implement the Business Continuity Plan10.
 Create, implement, and maintain BCP Awareness and Training Programs11.
 Develop, maintain, coordinate, exercise, and evaluate the BCP12.
 Develop, maintain, coordinate, exercise, and evaluate plans for public relations and crisis
coordination13. You may find it more appropriate to document public relations and crisis
coordination procedures in your Crisis Management Plan.
 Develop, maintain, and coordinate policies and procedures with local authorities14. You
may find it more appropriate to document these policies and procedures in your Crisis
Management Plan.

And I suggest another responsibility for the BCC:

 Assist the Crisis Management Team (in the CMP) and/or the Executive Management
Team (in the BCP) during a crisis/disaster as required.

3.2 Business Continuity Plan Administrators (BCA)

It is not practical for a large, geographically-separated organization to have one single individual
who can effectively perform all of the responsibilities listed in the previous section. Moreover, it
is sometimes difficult in a smaller, single-site organization or company, especially if the BCC
has other responsibilities beyond the BCP. Therefore, I suggest an additional designated position
which I call a Business Continuity Administrator (BCA).

In a smaller organization, the BCA is responsible for a discrete section of the BCP, such as a
department or business unit for which a team has been defined. The BCA is a team (i.e.,
department or business unit) representative at all BCP meetings, and is at least a senior
individual on that team, if not the team leader.

If you carefully construct your BCP Team and structure your plan as described in Sections 1 and
2, you can assign the responsibility for maintenance and update for a section to the BCA for that
team.

As always, this is only one way to develop and maintain a BCP with some help from other
people in your organization, and the most important point is that you should develop your own
BCP Team to fit your organization’s specific needs.

10
DRII Professional Practices – Subject Area 6: Developing and Implementing Business Continuity Plans
11
DRII Professional Practices – Subject Area 7: Awareness and Training Programs
12
DRII Professional Practices – Subject Area 8: Maintaining and Exercising Business Continuity Plans
13
DRII Professional Practices – Subject Area 9: Public Relations and Crisis Coordination
14
DRII Professional Practices – Subject Area 10: Coordination with Public Authorities
_______________________________________________________________________________________
___
54312050.docx Page 16
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
3.2.1 Responsibilities

The responsibilities for the Business Continuity Administrator (BCA) are similar to those of the
BCC, but more limited in scope to a specific department or business unit.

3.3 Business Continuity Plan Administration

Administration of the BCP can be simple or complex, depending on the size of the organization,
and this section contains two major areas that require your attention.

3.3.1 BCP Awareness and Training

This section contains basic information on how you administer the Awareness and Training
Programs15 for your Business Continuity Plan.

Virtually all organizations have a new employee orientation, and you can begin your training
program by developing and presenting a brief introduction to the BCP policy and plan. Most
organizations also have a requirement that new employees review the security policy and sign a
statement they have read and understood the policy. You may be able add a statement about
each employees responsibility for the BCP.

You can usually distribute a monthly BCP newsletter by hard copy or by email. In the
beginning, you will probably use the newsletter as a status report, but you can also use it to
document situations applicable to your Business Continuity Plan. What about bad weather? –
snow, floods, tornadoes, etc. Emergency notification, regardless of the cause, should be part of
your BCP. Do you ever have a power outage? – the BCP and Escalation Plan applies.

3.3.2 Exercising (Testing) the BCP

The Business Continuity Coordinator is responsible for conducting periodic exercises16 of the
Business Continuity Plan as documented in Chapter 4.

At least two separate exercises should be conducted every year:

 Structured Walk-through Exercise for training and updating the BCP


 Technical Exercise or Hot Site exercise for IT and users

15
DRII Professional Practices – Subject Area 7: Awareness and Training Programs
16
DRII Professional Practices – Subject Area 8: Maintaining and Exercising Business Continuity Plans
_______________________________________________________________________________________
___
54312050.docx Page 17
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
3.4 Business Continuity Plan Maintenance

Maintenance is perhaps the most difficult areas for most people to understand, primarily because
of the view that, after the BCP has been written, exercised, and updated, it’s just another project
that has been completed. The fact is that a BCP is never completed because of change. People
change, business needs grow and change, and business operations have to accommodate those
changes. And so does your Business Continuity Plan. Therefore you need to have a provision to
handle those changes as documented in the following sections.

3.4.1 When and How to Update the BCP

Ideally, the Business Continuity Plan should be updated every time there is a business or
personnel change. A business change may also include a change in the IT hardware, such as a
file server. But it is not very realistic to assume the BCP can be updated every time a change
occurs.

To help keep track of changes, I recommend you have a monthly meeting with all team leaders
and their alternates to review changes and impact on the BCP. Personnel changes occur most
frequently, and you should be prepared to update your Call Lists monthly or quarterly for
updated BCP distribution. Other changes, such as new applications and/or IT hardware occur
less frequently, and many organizations have a formal change control process that can help you
keep track of those changes.

As a minimum, I recommend that the Call Lists be updated and distributed monthly, if possible,
or quarterly if not. This is one example of a scheduled change.

For other business changes, including any unscheduled changes, the BCP should be updated as
soon as possible after the change occurs.

The Business Continuity Coordinator should ensure the required BCP updates have been
completed and distribute them to the Distribution List described in Chapter 1.

3.4.2 Business Impact Analysis (BIA) Maintenance

The Business Impact Analysis (BIA) is not a one-time project because of business changes and
growth as stated in the previous section. As a result, the BIA requires maintenance whenever a
major business change occurs or at least once a year, whichever comes first.

_______________________________________________________________________________________
___
54312050.docx Page 18
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Why does the BIA require maintenance? Well, it is the best way to verify that you have all of
the required information. For example, there is a significant trend toward e-business, and many
organizations are using the internet for that purpose, aside from an informational web site. At
the beginning of a project, an RTO may be longer because the entire process is not usually fully
integrated into business operations until that process has matured. That maturing process may
take a year or longer, but that process or business function which was not critical during the
original implementation (it may have been a pilot project) may become a very critical process
over time.

Application implementations and enhancements are another frequently-encountered concern


because a new application may essentially replace a manual process to improve productivity.
Then, you will have a situation where, over time, people will forget (or leave the organization)
how to do that original process; then, enhancements may be implemented that will make it
virtually impossible to perform that process without that application. To make matters worse,
that productivity improvement may have significantly decreased the Recovery Time Objective
(RTO). So you must be prepared to revise your Business Continuity Strategy and Business
Continuity Plan as a result.

Whether you conduct interviews or distribute questionnaires to update your BIA, I recommend
you schedule it during a non-peak time of the year – Not at the beginning of the year which may
conflict with year-end closing, not at month-end or quarter-end closing, and not during any
holiday times when the responsible managers may not be available because of business
requirements.

3.5 BCP Approvals

Regardless of how you develop your Business Continuity Plan, one of the last, but very
important steps, is to make certain you have a formal sign-off by senior management on your
initial Business Continuity Plan.

It is a best practice, and in some cases required, to obtain this approval every year. I recommend
that you develop a procedure which “automatically” requests senior management approval after
they have participated in a Structured Walk-through Exercise that should be conducted once a
year for training and plan updates (see Chapter 4)

3.5.1 Senior Management Approval

This section is reserved for an “approval page” for your Business Continuity Plan. Some
Business Continuity Coordinators prefer to have this page at the beginning of the plan. This is a
best practice to ensure the BCP has been formally reviewed and approved. However, all
federally regulated financial institutions have a special requirement as discussed in the following
section.
_______________________________________________________________________________________
___
54312050.docx Page 19
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

3.5.2 Board of Directors Approval (if applicable)

For financial organizations that must comply with the Federal Financial Institutions Examination
Council (FFIEC) regulations and policies (e.g., FDIC, OCC, NCUA, etc.), you must have a
formal and documented approval from the Board of Directors every year in the board minutes17.
For example, the National Credit Union Associate (NCUA) has also issued this identical policy
for all credit unions.18 This section is reserved for that approval.

I have found the easiest way to obtain this approval is to request an “extract” from the Board of
Directors’ meeting minutes which details the review and approval of the Business Continuity
Plan, usually after a presentation on that plan. The extract is requested because the Board
usually has company-confidential information in the minutes, and the Board Secretary will
generally be able to help you with this. Required information includes the date and time of the
Board Meeting, the participants, an exact extract of the minutes relating to the Business
Continuity Plan, and a certification by the Board Secretary that the above is a true, accurate and
complete copy of the board minutes related to the review and approval of the Business
Continuity Plan.

17
FFIEC Corporate Business Resumption and Contingency Planning Policy Revised March 1997
18
NCUA Letter to Credit Unions Letter No. 97-CU-3 dated April 7, 1997
_______________________________________________________________________________________
___
54312050.docx Page 20
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 4 – Plan Exercises and Exercise Reports

Chapter 4 contains information on the various types and frequency of plan exercises. This
chapter also provides a repository for test reports, although some Business Continuity
Coordinators prefer to place test reports in an appendix.

Many BCP specialists still refer to an exercise as a “test”, but my experience is that it is
preferable to use the word “exercise”, primarily because a test implies a pass/fail kind of
environment.

From a professional perspective, I believe the real objectives of a BCP exercise are to:

 Create a learning environment so that all participants can learn about the BCP
 Document changes and updates (including omissions) to the BCP

And regardless of how your plan is constructed, I always recommend a Structured Walk-through
Exercise as the first exercise, regardless of whether you need to evaluate an IT-based BCP or a
business-based BCP.

4.1 BCP Exercise (Testing) Methodology

The Business Continuity Plan can be verified and validated using any one of the following
methodologies:

 Structured Walk-through Exercise


 Tactical Exercise
 Technical Exercise for the IT staff, usually at a commercial Hot Site
 Hot Site Exercise (both IT and business users)

You can also use any combination of these methodologies to develop an appropriate approach
for exercising your Business Continuity Plan.

4.2 When to Exercise (Test) the BCP

It is a best practice to have a minimum of two BCP exercises every year: one Structured Walk-
through Exercise and one Technical Exercise or Hot Site Exercise that includes the Technical
Exercise and business user participation.

_______________________________________________________________________________________
___
54312050.docx Page 21
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
The objectives of a Structured Walk-through Exercise are to:
 Determine the state of readiness of your BCP by creating a learning environment so that
all participants can learn about the plan.
 Validate the BCP resource lists (people and inventories) are sufficient to effect recovery
of business operations and/or IT services as appropriate. Document changes and updates
(including omissions) to the BCP.
 Verify the BCP is current and accurately reflects the organization’s requirements.

After the exercise, you should make certain that all changes and updates are completed, and
distribute those updates to your Distribution List as described in Chapter 1.

If your organization has a separate data center (and a separate Business Continuity Plan because
it is in a different location), you will want to have a separated Structured Walk-through Exercise
to verify the technical aspects and resources for that BCP. In fact, you may find it helpful to
have a separate exercise for your IT recovery because business users only care whether their
computer systems are available, not the boring technical details of how IT actually does it. In
any case, I recommend you conduct a Structured Walk-through Exercise for your IT staff at least
once a year.

For the very first Technical Exercise, I recommend that it be strictly limited to IT staff only. It is
not unusual for issues to be identified during a Technical Exercise that cause problems during the
restoration of systems and backup data. Missing tapes or media (e.g., install CDs),
corrupted/unreadable media, telecommunications failures of all kinds, incompatible hardware,
and various other hardware failures can contribute to a “less successful” Technical Exercise. If
this occurs during your first Technical Exercise, it is important to remember the objectives are
identical to those stated above for the Structured Walk-though Exercise, especially that this
exercise is to help identify problems (and their corrective actions) and provide training.

When your IT staff has completed a Technical Exercise that accomplished all objectives for your
IT systems availability, then you need to have a Hot Site exercise that includes both IT recovery
and user participation to validate that all restored systems and data are accurate, operational, and
synchronized.

4.3 Developing the Exercise (Test) Scenario or Plan

Regardless of which methodology you choose to exercise your Business Continuity Plan, you
need to develop a test plan or scenario for the exercise. Consider the following as you develop
your Exercise Scenario and/or Plan:

 Focus on teams which have had deficiencies in the past. For example, verify that the
BCP has been updated to reflect resource requirements and any technical issues.
 Ensure that the exercise involves only the use of offsite resources to verify the accuracy
and completeness of Offsite Storage, including Vital Records.
_______________________________________________________________________________________
___
54312050.docx Page 22
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
 Choose a realistic scenario as discussed in the following paragraphs.

For a Structured Walk-through Exercise, you should first describe the objectives of the exercise,
such as the ones stated in Section 4.2. Then, create a short, one-paragraph scenario that
describes a situation where your location has suffered an obvious disaster, such as a fire, flood or
tornado.

For any exercise involving a commercial Hot Site, be sure to make arrangements with the vendor
first. You may find you will need to schedule exercises as much as a year in advance, depending
on the vendor’s schedule, so you will need to plan ahead with an Exercise Plan. Then you can
create your exercise objectives and scenario as discussed above.

4.4 Exercise (Test) Evaluation

You should always document the evaluation of the exercise and include it as part of your BCP as
discussed in the next section. If you have developed your exercise scenario and plan as
discussed in the previous section, you already have completed part of the documentation. I
usually create the Exercise Evaluation as a memo to senior management (i.e., the Executive
Management Team) with a copy to all exercise participants. You should be able to use the
Distribution List discussed in Chapter 1 for this purpose.

The memo documents the test objectives and the scenario. The remainder of the memo is
organized by team, especially listing a due date and responsible person for corrective action on
any plan update (Hint: provide an update form to each team leader so that any changes and/or
additions can be recorded during the exercise. Collect all these forms at the end of the exercise.)
You should also make notes of any comments at the conclusion of the exercise for inclusion in
the Exercise Report as appropriate.

Finally, include your Exercise Report as part of the BCP as discussed in the following section.

4.5 Exercise (Test) Reports

This is a separate section reserved for documentation all of your BCP exercises. When your
BCP is audited, you will almost certainly be asked: “When was the last time this plan was
tested?” If you have all the test reports in your BCP, the auditor will always see them, and you
will not have to keep a separate file.

Some people prefer to keep Exercise Reports in an appendix instead of the main part of the BCP,
so the choice is up to you.

_______________________________________________________________________________________
___
54312050.docx Page 23
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Chapter 5 – Appendixes

Chapter 5 contains various appendixes, including detailed procedures, that support the BCP. For
example:
A Glossary
B Sample – Hot Site Information (e.g., directions, maps, contract copies, etc.)
C Sample – JCN Model 00 Server Recovery Procedure
Other appendixes (for detailed procedures, etc.) as required.

Appendix A is a glossary which is a substantial revision of the current DRII terminology with
some new terminology that reflects current practices as of December 2002.

APPENDIX A – GLOSSARY

Special Note: Glossary definitions may include a reference to another definition which is shown in
italics.

Alternate Site – An alternate location, other than the main facility, that is designated emergency
use by an organization’s Emergency Operations Center (EOC), business units for business
operations and/or data processing services (IT) when the primary location(s) are inaccessible.

Auditing – A thorough examination and evaluation of an organization’s Business Continuity


Plan and procedures to verify their correctness and viability.

Backlog – A measure of unfinished work in hours or days.

BIA – Acronym for Business Impact Analysis.


_______________________________________________________________________________________
___
54312050.docx Page 24
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

Business Continuity – Activities, plans, and programs designed to return an organization to an


operational condition.

Business Continuity Coordinator (BCC) – A member of the Executive Management Team


and/or the Crisis Management Team with the responsibility for the development, coordination,
training, testing, training, and implementation of the Business Continuity Plan.

Business Continuity Plan – An approved set (usually by senior management and/or a Board of
Directors) of arrangements, resources, and sufficient procedures that enable an organization to
respond to a disaster and resume its Critical Functions within a pre-defined time frame without
incurring unacceptable financial or operational impacts.

Business Continuity Planner – An individual responsible for the design and development of a
Business Continuity Plan.

Business Continuity Planning – The process of developing advance plans and procedures that
enable an organization to respond to an event so that Critical Business Functions can continue
without significant or unacceptable Financial Impacts and/or Operational Impacts.

Business Continuity Strategy – A management-approved, documented, and funded course of


action to be used in the development and implementation of an organization’s Business
Continuity Plan.

Business Function – A separate, discrete function or process performed by a Business Unit. For
example, the Accounting Business Unit in a smaller organization may include accounts payable
and accounts receivable as Business Functions while a larger organization may have separate
business units that perform these Business Functions.

Business Impact Analysis (BIA) – The process of developing and distributing a questionnaire
to determine the Financial Impact and Operational Impact on an organization if it’s business
offices and/or data center facilities are not available for an extended time (usually at least one
month). The objective of the BIA is to provide a management-level analysis that specifically
documents the daily financial impact and Recovery Time Objective (RTO) for each Business Unit
and associated Processes.

Business Resumption Planning – See Business Continuity Planning.

Business Unit – A separate, discrete organizational entity that performs a specific business
function or process. A Business Unit may be as small as two people or as entire company.

Call List – A list of all team members and their phone numbers (home, work, cell, pager, etc.)
on a Team for the Business Continuity Plan.

CMP – Acronym for Crisis Management Plan.


_______________________________________________________________________________________
___
54312050.docx Page 25
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

CMT – Acronym for Crisis Management Team.

Cold Site – An Alternate Site consisting of space that can be configured to support business unit
recovery and/or data center recovery operations. A Cold Site is basically “four walls” with
access to Voice Communications and Data Communications circuits and sufficient available
electrical power and HVAC to support the recovery operations. A Cold Site may or may not
have raised floor, and ALL furniture and hardware must be delivered, installed, connected, and
tested. May also be called a Shell Site. See also Hot Site and Warm Site.

Command Operations Center – See Emergency Operations Center (EOC).

Contingency Planning – Process of developing advance arrangements and procedures that


enable an organization to respond to an event that could occur by chance or unforeseen
circumstances.

Controls – A term usually associated with Auditing and defined as procedures or other measures
designed to ensure that plans and systems function correctly.

Crisis – An event that threatens the security, integrity or facilities of an organization and/or the
safety of its employees. A Crisis may range from a building evacuation due to a bomb threat to a
full-scale, easily recognized disasters. For planning purposes, a Crisis includes, but is not limited
to, severe weather threats or occurrences (snow, tornadoes, etc.), senior management succession
planning, power and communications outages, medical emergencies, hostage situations, bomb
threats, earthquakes, elevator entrapments, etc., in addition to an obvious, easily-recognized
disaster.

Crisis Management Plan (CMP) – An approved set (usually by senior management and/or a
Board of Directors) of arrangements, resources, and sufficient procedures that enable an
organization to effectively respond to a Crisis.

Crisis Management Team (CMT) – The senior management team that activates the Crisis
Management Plan (CMP) in response to a Crisis.

Critical Functions – Essential Business Functions that are time-sensitive and must be restored
first in the event of a disaster or interruption to avoid unacceptable financial or operational
impacts. ensure the ability to protect the organization’s assets, meet organizational needs, and
satisfy regulations.

Customer List – An inventory list of all primary customers –including name, address, telephone
number, and contact (if required)– that must be notified during the recovery of a business unit or
an entire company. The Customer List is an essential part of an organization’s Business
Continuity Plan. It is a best practice to have a complete inventory list of ALL existing customers
compiled for an organization.

_______________________________________________________________________________________
___
54312050.docx Page 26
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Data Communications – The transmission of data, usually in a digital form, between
geographically separate locations via public and/or private electrical or optical transmission
systems. Contrast with Voice Communications.

Declaration Fee – A one-time charge normally paid to a commercial vendor who provides an
Alternate Site (usually a Hot Site) facility at the time a disaster is officially declared.

Department – A separate, discrete entity defined by each organization or company. A


department usually performs a specific business function or process. See also Business Unit.

Disaster – A sudden, unplanned calamitous event causing great damage or loss. In the business
environment, any event that creates an inability on an organization’s part to provide essential
products and/or services for an indefinite period of time.

Disaster Mitigation – Actions, plans, and activities to reduce or eliminate the effects of a
disaster on business and/or data center operations.

Disaster Preparedness – Activities, plans, programs, and systems developed prior to a disaster
that are used to support and enhance mitigation, response, and recovery to disasters.

Disaster Recovery – Archaic term for Business Continuity but still occasionally used in
reference to a data center’s Business Continuity Plan. See Business Continuity.

Disaster Recovery Plan – Archaic term for Business Continuity Plan but still occasionally used
in reference to a data center’s Business Continuity Plan. See Business Continuity Plan.

Disaster Recovery Planning – Archaic term for Business Continuity Planning but still
occasionally used in reference to a data center’s Business Continuity Planning. See Business
Continuity Planning.

Disaster Response – See Emergency Response.

Electronic Vaulting – The transmission of journal transactions or data records to an Alternate


Site or Offsite Storage using telecommunications facilities.

Emergency Operations Center (EOC) – An Alternate Site with sufficient Voice


Communications capabilities and work space used to manage the initial recovery efforts
including emergency notifications using the Call List from the Business Continuity Plan. The
EOC may initially be a temporary location (e.g., hotel, team member’s home, etc.) used by the
management team to begin coordinating the recovery operations or it may be the designated
Cold Site, Warm Site or Hot Site designated for recovery operations.

Emergency Response – The initial activities and plans designed to address and mitigate a
disaster’s immediate and short-term effects.

_______________________________________________________________________________________
___
54312050.docx Page 27
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
EOC – Acronym for Emergency Operations Center.

Equipment List – An inventory list of all equipment and associated vendors which are required
for the recovery of a business unit or an entire company. Equipment includes, but is not limited
to, FAX machines, printers, computer systems, monitors, cables, scanners, mail processing
hardware, etc. The Equipment List is an essential part of an organization’s Business Continuity
Plan. It is a best practice to have a complete inventory list of ALL existing equipment compiled
and used by an organization.

Escalation Plan – A plan that documents decision-making criteria, usually based on the
Recovery Time Objective (RTO), to determine whether a Disaster declaration and
implementation of the Business Continuity Plan is in the best interest of the organization or
company.

Financial Impact – An tangible impact, measured in dollars and usually negative, resulting from
the unavailability of an organization’s business office and/or data center facilities. Financial
impacts are usually reported during a Business Impact Analysis (BIA) and are typically estimated
on a daily basis. See also Operational Impact.

Hot Site – An Alternate Site consisting of designated office space and/or a data center facility
that is equipped with sufficient workstations (including desks, chairs, telephones, etc.), voice and
data communications hardware and connectivity, power, raised floor, computer hardware
(including workstations if required), and appropriate heating, ventilating, and air conditioning
capacity. Commercial vendors typically provide separate space/facilities with monthly
subscriptions for recovering business unit operations and computer operations. See also Cold
Site and Warm Site.

Alternate facility with equipment and resources to recover the critical business functions affected
by a disaster. Hot sites vary depending on the type of facilities offered (such as data processing
equipment, communications equipment, electrical power, etc.).

HVAC – Acronym for heating, ventilation, and air conditioning.

Initial Assembly Point (IAP) – A pre-defined location, such as a parking lot, hotel or person’s
home, where all designated team leaders and members can meet if the organization’s business
offices and/or data center are not accessible for any reason. See also Emergency Operations
Center (EOC).

Inventories – Specific lists of items required for the Business Continuity Plan which includes
the Customer List with contact information, Equipment List (with Vendor List and contact
information), Supplies List (with Vendor List and contact information), Software List (with
Vendor List and contact information), Telecommunications List (with Vendor List and contact
information), Vital Records List (with location of vital records). See the specific inventory item
(shown in italics) for additional information.

_______________________________________________________________________________________
___
54312050.docx Page 28
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
IT – Acronym for Information Technology. A Department or Business Unit that provides
computing systems support to an organization or company.

Infrastructure – The basic supporting installations and facilities upon which the continuance
and growth of a community depend, such as power plants, water supplies, transportation
systems, and communications systems, etc.

LAN – Acronym for Local Area Network.

Local Area Network (LAN) – A short-distance network used to connect terminals, computers,
and peripherals under a standard topology, usually within one building or a group of buildings. A
LAN does not use public carriers to link its components, although it may have a “gateway”
outside the LAN that uses a public carrier. See also Wide Area Network.

Loss – Unrecoverable business resources that are impacted or removed as a result of a disaster.
Such losses may include loss of life, revenue, market share, competitive stature, public image,
facilities, or operational capability. See also Financial Impact and Operational Impact.

Mitigate – To make or become milder, less severe, or less painful.

Mobile Recovery Facility (MRF) – A mobile Warm Site, normally a large tractor-trailer
available from a commercial vendor, that can be transported to a pre-determined location so that
needed equipment can be obtained and installed near the original location. Depending on the
vendor, an MRF may be available in a “business office” and a “data center” configuration.

Modem – An acronym for modulator/demodulator, a device that converts analog signals to


digital signals and back again, usually on Voice Communications circuits.

Operational Impact – An intangible impact resulting from the unavailability of an


organization’s business office and/or data center facilities. An Operational Impact cannot be
quantified in dollars, but may be critical because of its effect on an organization. Examples of
operational impacts include, but are not limited to customer service, stockholder confidence,
industry image, regulatory, financial reporting, employee morale, vendor relations, cash flow
(that cannot be quantified), and increases in liability. Operational impacts are usually reported
during a Business Impact Analysis (BIA) and are typically estimated on an arbitrary scale, such as
1-5, with the highest number representing the most severe impact. See also Financial Impact.

Offsite Storage – A designated storage facility, other than the main facility, where duplicate
Vital Records and critical documentation may be stored for emergency use during the execution
of an organization’s Business Continuity Plan.

Project Team – A group of people representing key organizational areas that work together and
follow documented responsibilities for the design, development, and implementation of a
Business Continuity Plan.

_______________________________________________________________________________________
___
54312050.docx Page 29
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
POTS – Acronym for Plain Old Telephone Service.

Project Management – The development, planning, organizing, and management of tasks and
resources to accomplish a defined objective, such as a Business Continuity Plan, usually under
time and cost constraints.

Reciprocal Agreement – An agreement between organizations with basically the same business
processes and/or data processing hardware that allows one organization to continue business
operations for the other in case of disaster.

Recovery Point Objective (RPO) – The measure how much data loss, in hours or days, is
acceptable to an organization. The point in time at which backup data (e.g., backup tapes) must
be restored and synchronized by IT to resume processing. Most IT organizations usually have an
RPO of at least –1 day (–24 hours) because backups are usually performed daily (usually at
night) and transported to Offsite Storage early the following day. The best RPO is zero (0)
which basically means that all affected computer systems utilize “mirroring” (real-time
data/transaction copying) technology to concurrently copy all incoming data/transactions to
another identical system in a remote location that is sufficiently remote from the primary site.

Recovery Time Objective (RTO) – The maximum length of time, in hours or days, that can
elapse before the loss of a business function, a computer application, the business offices and/or
a data center causes unacceptable Financial Impacts and/or Operational Impacts to an
organization as documented in the Business Impact Analysis (BIA).

The RTO has five (5) components:


(1) The time before a disaster is declared (see Escalation Plan);
(2) The time required to activate the Business Continuity Plan;
(3) The time required for the IT organization to restore computer systems;
(4) The time required by an affected business unit to perform assigned tasks to the point at
which business operations can be resumed including the time to verify that restored
computer systems data is accurate and synchronized to the last available backup; and
(5) The time for each business unit to re-enter/process all Backlog (including manually
processed work, if applicable) to bring business operations into current status.

Recovery Timeframe – See Recovery Time Objective (RTO).

Recovery Strategy – See Business Continuity Strategy.

Relocatable Shell – See Mobile Recovery Facility.

Resource Requirements – The resources (e.g., people, equipment, supplies, vendors,


telecommunications, vital records, etc.) required for the recovery of a business unit or an entire
company as documented in the Business Continuity Plan.

Risk – The potential for exposure to loss. Risks, either man-made or natural, are constant
_______________________________________________________________________________________
___
54312050.docx Page 30
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
throughout our daily lives. The potential is usually measured by its probability in years.

Risk Analysis – The process of identifying the risks to an organization, assessing the Critical
Functions necessary for an organization to continue business operations, defining the controls in
place to reduce organization exposure, and evaluating the cost for such controls. Risk analysis
often involves an evaluation of the probabilities of a particular event.

Software List – An inventory list of all software and associated vendors (see Vendor List) which
is required for the recovery of a business unit or an entire company. The Software List is an
essential part of an organization’s Business Continuity Plan. It is a best practice to have a
complete inventory list of ALL existing software compiled and used by an organization.

Supplies List – An inventory list of all supplies and associated vendors which are required for
the recovery of a business unit or an entire company. Supplies includes, but is not limited to,
forms (e.g., check stock), special rubber stamps, pens, pencils, paper, paper clips, staplers, etc.
The Supplies List is an essential part of an organization’s Business Continuity Plan. It is a best
practice to have a complete inventory list of ALL existing supplies compiled and used by an
organization.

Structured Walk-Through Exercise – A simulated method used to exercise or test a completed


Business Continuity Plan. The exercise includes a disaster scenario and exercise moderator who
observes one or more team leaders verbally walk through each step of their BCP to confirm its
viability and identify omissions, gaps, bottlenecks, or other plan weaknesses.

Tactical Exercise (“War Game”) – A simulated, scenario-based exercise of the Business


Continuity Plan conducted in a “War Room” format in a large room. The exercise moderator
conducts the exercise and reads a prepared scenario. All Team Leaders and Alternate Team
Leaders are required to participate and “perform” their tasks under supervised conditions. Each
team has a separate table or work area and can only communicate with another team using
written notes that are given to “couriers” for delivery to simulate the communications problems
(e.g., incomplete information) that occur during a disaster. The written communications are
time-stamped so that an exercise report can be prepared. During the exercise, roving “referees”
ensure there is no talking among the teams. This type of sophisticated exercise requires a
considerable amount of planning and coordination, even though the actual event may take only a
day or less.

Task List – A list of all tasks, usually in a checklist form, which must be performed by a Team
to recover a specific portion of an organization, business function and/or business unit. The
Task List is an essential part of an organization’s Business Continuity Plan.

Team – A group of individuals assigned to work together to perform a specific function in the
Business Continuity Plan. A Team consists of a Team Leader, Alternate Team Leader, and
Team Members. The Team Leader is responsible for the successful completion of all tasks
assigned (See Task List) to a team.

_______________________________________________________________________________________
___
54312050.docx Page 31
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Technical Exercise – A BCP exercise, normally scheduled with a commercial Hot Site vendor,
in which the IT and Telecommunications teams verify that computer systems and
telecommunications can be successfully restored to operational status.

Telecommunications – A general term that applies to analog or digital data transmitted (See
also Data Communications and Voice Communications) by electrical, optical, or acoustical
means over public or private communications carriers.

Telecommunications List – An inventory list of all Voice Communications and Data


Communications circuits which are required for the recovery of a business unit or an entire
company. The Telecommunications List is an essential part of an organization’s Business
Continuity Plan. It is a best practice to have a complete inventory list of ALL existing
telecommunications circuits compiled and used by an organization.

Threat – A potential event that may cause a risk to become a loss. Threats consist of natural
phenomena such as tornadoes and earthquakes and man-made incidents such as terrorist attacks,
bomb threats, disgruntled employees, and power failures.

Vendor List – An inventory list of all primary vendors (suppliers) –including name, address,
telephone number, and vendor representative (if required)– that provide an essential service or
product required for the recovery of a business unit or an entire company. The Vendor List is an
essential part of an organization’s Business Continuity Plan. It is a best practice to have a
complete inventory list of ALL existing vendors compiled and used by an organization.

Vital Record – A critical business record required for recovering and continuing an
organization’s business operations. This may include employee information, financial and
stockholder records, business plans and procedures, and the Business Continuity Plan. Vital
records may be contained on a wide variety of media including, but not limited to, electronic
(including tape, disk, and CD-ROM), hard copy (normally paper), microfilm, and microfiche.

Vital Records List – An inventory list that contains the name and offsite location of vital
records (see Vital Record) required for the recovery of a business unit or an entire company. The
Vital Records List is an essential part of an organization’s Business Continuity Plan.

Voice Communications – The transmission of sound at frequencies within the human hearing
range which may be in digital or analog form. Contrast with Data Communications.

WAN – Acronym for Wide Area Network.

Warm Site – An Alternate Site consisting of designated office space and/or data center space
that has installed voice and data communications access and is partially equipped with
telecommunications interfaces, such as a PBX and/or a router. A Warm Site is usually pre-wired
for Voice and Data Communications so that telephones, PCs, and other computer hardware (e.g.,
servers) can literally be “plugged-in” as required. See also Cold Site and Hot Site.

_______________________________________________________________________________________
___
54312050.docx Page 32
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__
Wide Area Network (WAN) – A network linking geographically separate metropolitan,
campus, or local area networks across greater distances, usually accomplished using common
carrier lines. See also Local Area Network.

Workstation – A single-person work area which usually includes office furniture (e.g., a desk),
computer equipment (e.g., a PC), a telephone, and a wastebasket.

_______________________________________________________________________________________
___
54312050.docx Page 33
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

APPENDIX B – HOT SITE INFORMATION (Sample)

This is a sample cover page for an appendix.

This appendix contains the details of the Hot Site contract with the Wazoo Business Recovery
Center.

Items included in this appendix are:

 Map to the Wazoo Business Recovery Center


 Emergency notification number for the Wazoo Business Recovery Center
 Contract between ABC Company and the Wazoo Business Recovery Center

If you have a hard copy document without a corresponding electronic copy, such as the contract
mentioned above, I recommend that you scan the hard copy so that you will have a complete
electronic copy of your Business Continuity Plan.

_______________________________________________________________________________________
___
54312050.docx Page 34
A Professional’s Guide to the Contents of a Business Continuity Plan
_______________________________________________________________________________________
__

APPENDIX C – JCN Model 00 Server Recovery Procedure (Sample)

This is a sample cover page for an appendix containing a procedure. Each appendix should have
a cover page that describes the contents of that appendix.

_______________________________________________________________________________________
___
54312050.docx Page 35

You might also like