More than providing Tracks & Trains : Providing Transportation solutions

1 Introduction

2 The right Rolling Stock for the particular needs of every Railroad Operator
Case of Tilting Trains technology

3 Maintenance performance as project driver from premises

ALSTOM - 11/10/2018 – P 2
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions

1 Introduction

2 The right Rolling Stock for the particular needs of every Railroad Operator
Case of Tilting Trains technology

3 Maintenance performance as project driver from premises

ALSTOM - 11/10/2018 – P 3
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Introduction

Long Term Profitability, Sustainable Business

Income vs Total Cost of Ownership

Safety, Customers’ satisfaction


vs Total Cost of Ownership
Compliance (Passengers or Freight)

Competitive Price, Availability, Acquisition cost,


vs
Reliability (Punctuality, Comfort) Maintenance cost, Energy cost

ALSTOM - 11/10/2018 – P 4
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Introduction

Safe, Fast, Cheap,


and with the
Best Comfort !
Case of Tilting Trains

Long Term Profitability, Sustainable Business

Income vs Total Cost of Ownership

Safety, Customers’
Customers’ satisfaction
satisfaction
vs Total Cost of Ownership
Compliance (Passengers
(Passengers or
or Freight)
Freight)

Competitive Price, Availability, Acquisition cost,


vs
Reliability (Punctuality, Comfort) Maintenance cost, Energy cost

ALSTOM - 11/10/2018 – P 5
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Introduction

Productive system:
more time in service,
at a lower cost !
Maintenance Performance

Long Term Profitability, Sustainable Business

Income vs Total Cost of Ownership

Safety, Customers’ satisfaction


vs Total Cost of Ownership
Compliance (Passengers or Freight)

Competitive
CompetitivePrice,
Price,Availability,
Availability, Acquisition
Acquisition cost,
cost,
Reliability vs
Reliability(Punctuality, Comfort)
(Punctuality, Comfort) Maintenance
Maintenance cost,
cost, Energy
Energy cost
cost

ALSTOM - 11/10/2018 – P 6
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions

1 Introduction

2 The right Rolling Stock for the particular needs of every Railroad Operator
Case of Tilting Trains technology

3 Maintenance performance as project driver from premises

ALSTOM - 11/10/2018 – P 7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

Alstom tilting early history


1st generation Pendolino train

1969 1970 - 1974 1975 June 26th 1988 May 29th


Prototype seat on Y0160 1st train order 2 power car first trip. ETR450 started
ALn 668.1999 loco. from Italian Railways operating Rome-Milan
to FIAT Ferroviaria. 1976 April 8th
Confirming «Tilting» 57min saving
11-Oct-71 first test. Revenue service
effect on comfort. Rome-Ancona. Average 153 km/h
Tests on Bra-Ceva 11-Jan-72 2.2 m/s2. 250 km/h, 5MW, 9car
ETR401 30 min save
tortuous line. Same year 248 km/h 8º tilting angle
250 km/h, 1.8MW, 4car
ALSTOM - 11/10/2018 – P 8 10º tilting angle
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology
Tilting Principle : Speed gain with enhanced comfort

Cant/roll compensation
+8º Roll/Tilt degrees.

Pendolino tilting
+1,5º
-1º
Lateral accelerations
perceived by passenger
and at track level
(in m/s2)

Tilting Pendolino characteristics:


Alstom tilting trains operate  Up to 2 m/s2 non compensated acceleration (n.c.a.) at track level
within the normal track limits  Up to 30% speed gain in curve
(force, acceleration, etc.)
No need for special track design Lateral acceleration compared to non-tilting train:
 Perceived 33% less by passenger  more comfort
ALSTOM - 11/10/2018 – P 9
 100% more at track level  higher speed in curve
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

1970s Alstom High Speed 2011


1st Pendolino
(Italy)
Tilting references ETR610
(Italy, Switz., Germ.)

1980/1990s More than 300 high


ETR 460/470 2010
(Italy) speed trains TILT with Allegro
(Finland, CIS)
Alstom technology
1996 2007
Acela Express New Pendolino
(US) (bogies) (Italy, Switz,. Germ)

1998
Virgin WCML 2004
(UK) Pendolino CZ
(Czech Rep)
1998
ICE-T 1999-2000
(Germany) DTP2 Test Train
(bogies & control) (France)
1998
IC 2000 Alaris 1999
(Spain) Alfa Pendular CPA 4000
ALSTOM - 11/10/2018 – P 10
(Portugal)
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

Pendolino Titling system is composed of :

 Bogies fitted with a Tilting Bolster, supporting the carbody

 Hydraulic units & actuators, controlling the tilting bolster

 Tilting Pantograph (if installed on a tilting car)

 Anticipative algorithms (TILTRONIX™) processed by dedicated


electronics, improving passengers comfort compared to a
reactive system.

ALSTOM - 11/10/2018 – P 11
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

TiltronixTM: Curve prediction without infrastructure devices

5 Continuous
DATABASE
4 Anticipation and smooth
of the tilting control
3 Prediction command
of future curves
1 Track recognition 2 Train
localization
Sensor signals

Trigger point

Reference
point

Anticipation distance
Tilt immune to
The track macro-geometry measurement system track irregularities
(SUT) is equipped with:
-1 X axis gyroscope  track cant
-1 Z axis gyroscope  curve radius
-1 Y axis accelerometer  cant deficiency
ALSTOM - 11/10/2018 – P 12
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology : new ACELA

DTP: NEW ACELA TILTING TRAINSET


Prototype of Tilting Train
with articulated architecture

ACELA Tilting Train :


Proven trucks on the NEC

Pendolino Titling System :


Wide Return of Experience
 Articulated trainset
& most advanced technology
 Up to 186 mph
 Tilting Passengers cars,
Maximum tilting angle ≈ 6.3 degrees

ALSTOM - 11/10/2018 – P 13
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology : new ACELA

Complex carbody kinematics of Pendolino for


SAFETY
• Gauge compliance
• Stability : self-centering independently of the load and
non-compensated acceleration.
COMFORT
• Stability
• Belly-centered rotation (height of the Center of Instant
Rotation close to the body center of the passengers)
TRACK FRIENDLINESS
Minimum wear related to limited wheel-rail contact force :
• Limited movement of carbody Center-of-Gravity
• Reduction of non-suspended masses
• Low primary suspended masses
• Designed for high cant deficiency
• Reduced bogie rotation stiffness
ALSTOM - 11/10/2018 – P 14
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

The challenge

During decades Alstom evolved the tilting technology


 To guarantee outstanding safety: self-centering architecture…
 To improve reliability: high redundancy, onboard autonomy…
 To ensure track friendliness: lowest unsprung mass, passive axle orientation…
 To ride at maximum speed: we offer maximum n.c.a. possible
 To offer best comfort: belly-centered rotation, active control…

So, how can we still improve it ?


 There are still few passengers affected by motion sickness if we run slower:
There’s always a population sensible to motion sickness. The occurrence is low in
railways, with just a 10-15% increase when running 30% faster on tilting trains.
 The new challenge: reduce motion sickness perceived by passengers
ALSTOM - 11/10/2018 – P 15
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

How to minimize motion sickness?


A combination of the best solutions based on 25 years of experience

Pendolino & Tiltronix™

Minimize vibration
Enhanced
BOGIES
Minimize low Optimized
comfort
frequency movements structure

Minimize translational Tilting mechanism


movements Belly height centered

Improve curve/tilt
synchronization Active tilting +Anticipative

ALSTOM - 11/10/2018 – P 16
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Case of Tilting Trains technology

Tiltronix™ is the answer again to motion sickness :

Even when running faster,


Tiltronix can result in less
kinetosis occurrence than on
non-tilting trains

Tiltronix medical validation was performed in October 2009 with 250 people recruited by SBB,
50% of them being known to be susceptible to Kinetosis (motion sickness)
Source: SBB, Reisekrankheit (Kinetose / Motion sickness), Befragungen im Rahmen des Projekts „Bogenschnelles Fahren“, Nov 2009
ALSTOM - 11/10/2018 – P 17
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions

1 Introduction

2 The right Rolling Stock for the particular needs of every Railroad Operator
Case of Tilting Trains technology

3 Maintenance performance as project driver from premises


• Design-for-Serviceability : how experts keep Maintenance performances under control

• Modern means for continuous improvement of the maintenance all asset life-long

ALSTOM - 11/10/2018 – P 18
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

• Commitment on targets of Operational Performances


• Maintenance Concept & Strategy, applicable regulations
• Fleet sizing
Availability, Workload & Track occupancy simulations
• Workshops sizing
• Maintenance Cost Model
• Definition of any Service Support required for reaching the ambitions
(tailored offer including deployment of new processes & tools)
• Alstom Units & External Suppliers under control, especially Material & Off-Train activities
ALSTOM - 11/10/2018 – P 19
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Key drivers for having Railways business under control

Availability as a dynamic target :


 Downtime costs « zero » when vehicles are not needed for revenue service !
 Good maintenance strategy often leads to fleet size optimization (impact on acquisition cost)

DAY VIEW (Passengers Main Line) WEEK VIEW (Passengers Main Line)
Downtime allocation for the different types of maintenance Typical needs for revenue service
(% trainsets available)
ALSTOM - 11/10/2018 – P 20
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Key drivers for having Railways business under control

Maintenance LCC (Life Cycle Cost) :

Technical cost :
• Labour + Material
• Systematic Preventive  CBM  Corrective // Cleaning
• Make vs Buy (on-train, off-train)

Reference
Total cost :
Library
• Operational procedures: handover, pre-service check…
• Productivity, workload variation
• Logistics (shunting, parts handling…)
• Support functions
• Training…

ALSTOM - 11/10/2018 – P 21
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

DESIGN–FOR–SERVICEABILITY (DFS)
• Maintenance performances : Cost, Downtime
• Means of reaching targets : Reliability, Accessibility, Testability, Cleanability, Depot facilities…
• Challenge & Rationalize all kind of maintenance including Safety-related tasks
• Obsolescence under control
DELIVERABLES OF INTEGRATED LOGISTIC SUPPORT (ILS)
• Logistic breakdown : LRUs & SRUs as input for DFS + ILS database as repository
• Maintenance Plan, Maintenances Tasks Analysis (MTAs), Maintenance & Operations
Manuals, (lists of) Spares, Special Tools (including Test Equipment),Training material…
ALSTOM - 11/10/2018 – P 22
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

WHEN DESIGN–FOR–SERVICEABILITY SAVES A RAIL TRANSPORTATION BUSINESS


On AGV it is possible
to remove the
Traction Motor
without removing
the bogie or the
wheelset.
This saved the business of the first private operator of passengers main
lines transit in Italy, NTV, when at start of service the life-time of the
original silent blocks was about 1.5 month… vs 3 years expected.
ALSTOM - 11/10/2018 – P 23
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

MAINTAINABILITY DEMONSTRATIONS
• If they could not be completed on 3D model or in manufacturing facility
DELIVERY of « Final Documentation », Spares & Tools
TRAINING SESSIONS to Drivers and Maintainers
ONE
DEPLOYMENT OF MAINTENANCE :
COMPREHENSIVE SET OF PROCESSES & TOOLS… and PEOPLE !
TEAM
• Management of Operational Performance : Reliability, Availability, Cost
• Maintenance Planning, Fleet Management
• Industrialization of Maintenance, Optimization of Execution
ALSTOM - 11/10/2018 – P 24
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

TRAINING : E-LEARNING

RELIABILITY MONITORING

ALSTOM - 11/10/2018 – P 25
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

SERVICES EXECUTION SYSTEM (SES)

ALSTOM - 11/10/2018 – P 26
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

HEALTH HUB™

Direct link to integrated systems


(eg TrainScanner™)

Ergonomic and scalable interface,


adapted for any fleet size

Unique train health radar for immediate assessment Direct link to open a Work Order in the MMS (pre-captured) !
ALSTOM - 11/10/2018 – P 27
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
More than providing Tracks & Trains : Providing Transportation solutions
Factoring Train Design into a comprehensive Maintenance System

Maintenance Engineering in New Build and Maintenance projects

Tender Design Mobilization Warranty Maintenance

DYNAMIC MAINTENANCE PLANNING, DIGITAL PLANNING BOARD

TASKS SEQUENCER, DEMANDS OPTIMIZER


ALSTOM - 11/10/2018 – P 28
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited.
www.alstom.com

You might also like