A. Preliminaries 1 General Preliminaries
A. Preliminaries 1 General Preliminaries
2 BEAM WORKS
Pozzolan/Portland Cement 45 Bags 230.00 10,350
Sand 4 m³ 680.00 2,720.00
Gravel ¾ 6 m³ 1,250.00 7,500.00
16mmØ x 6mts rebar 50 pcs 365.00 18,250.00
12mmØ x 6mts rebar 40 pcs 220.00 8,800.00
12mm rsb for lateral ties 50 kg 220.00 11,000.00
#16 G.I. wire 4 kg 70.00 280.00
MATERIAL COST 58,900.00
3 FOOTING
Pozzolan/Portland Cement 25 Bags 230.00 5,750.00
Sand 3 m³ 680.00 2,040.00
Gravel ¾ 4 m³ 1,250.00 5,000.00
12mmØ x 6mts rebar 20 pcs 220.00 4,400.00
#16 G.I. wire 2 kg 70.00 140.00
MATERIAL COST 17,330.00
6 ROOFING WORK
pre-painted long span roofing m² 850.00
ordinary gutter lm 300.00
tex screw for metal 2 1/2" pcs 2.50
silicon sealant pcs 200.00
5mm roof insulation roll 2,500.00
MATERIAL COST
SUBTOTAL CIVIL WORKS
SUMMARY
A. PRELIMINARIES
B. CIVIL WORKS
COLUMN
BEAM
FOOTING
FORMWORKS AND SCAFOLDINGS
STEEL ROOF FRAMING
ROOFING
TOTAL DIRECT COST
LABOR’S COST (40% COST OF
MMATERIALS)
TOTAL PROJECT COST