Goa - State Presentation
Goa - State Presentation
Goa - State Presentation
SAY 27 MLD
PROJECT CONCEPT
The shore intake structure on Khandepar river at Opa will provide
dependable raw water supply.
Plant & Machinery : Raw water pumps, motors, instrumentation inlet outlet
piping and electrical substation.
Raw Water Pumping main from Intake at Opa to WTP at Curti.
27 MLD Capacity Water Treatment Plant are proposed at Curti.
Treated water will be transmitted through the existing Gravity mains by
gravity to the existing service reservoirs at Altinho.
The distribution system is redesigned considering the demand of year
2045.
It is proposed to replace old C.I. Distribution Network Lines by D.I / H.D.P.E
mains.
Pressure control valves are proposed to control the nodal pressures within
the limit.
Flow meters are proposed to be installed to monitor the flow in to the
District Metering Areas.
SCHEMATIC DIAGRAM OF THE PROPOSED SCHEME
SALIENT FEATURES OF THE PROJECT
INTAKE WORK :
Individual delivery pipe of 450 mm ø .
Horizontal Centrifugal Pumps (2W+1S), 400 KW Each
WTP :
Distribution network
Total length :
DI pipes 350 mm to 450mm - 7179 mts
HDPE pipes 90mm to 315 mm - 80347 mts
5 Electricity 18900000.00
6 Staff salary for Operation and 60,72,000.00
Maintenance of Treatment
Plant & Distribution system
TOTAL 25705895.00
INTERNAL RATE OF RETURN